INTERREG III B CADSESRAINDROP
Project partner No 4:
Municipality of Acharnai
Scientific support:
YDRONOMI Consulting Engineers
INTERREG III B CADSESRAINDROP
Project partner No 4:
Municipality of Acharnai
Scientific support:
YDRONOMI Consulting Engineers
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
PP4 - Acharnai: The RainDrop experience
PP4 - Acharnai: The RainDrop experience
•Evolution of Acharnai and its drainage problems (sins of the past torturing the future generations)
•Designing for Raindrop (which problem to do we solve first?)
•Administration for Raindrop (or democracy in modern Greece)
•Works’ progress (in the land of our ancestors)
•The future (Rain Drop: much more than just a drop!)
•The Raindrop experience (lessons and the final outcome)
The hydrographic network – Before…The hydrographic network – Before…
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
The hydrographic network – Before …The hydrographic network – Before …
www.ydronomi.com
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
X X XX
X
and … nowdays: the “man-made hydrographic network
To get an idea of the magnitude of the problem: The event of May 24th 2007To get an idea of the magnitude of the problem: The event of May 24th 2007
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
To get an idea of the magnitude of the problem: The event of May 24th 2007To get an idea of the magnitude of the problem: The event of May 24th 2007
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
To get an idea of the magnitude of the problem: The event of May 24th 2007To get an idea of the magnitude of the problem: The event of May 24th 2007
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
To get an idea of the magnitude of the problem: The event of May 24th 2007To get an idea of the magnitude of the problem: The event of May 24th 2007
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
•Damage claimed after that flood : 6 million Euros!
•If we could cut the runoff by 50% literally no damage at all
Designing for Raindrop (which problem to do we solve first?)Designing for Raindrop (which problem to do we solve first?)
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Goals:
• local pilot intervention in one of the problematic areas
• Visible result
• Pilot application that will show the way for more similar projects
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
The design:
Retention Tank 1500m3
Porous Pavment 250m3
Trough trench 300m3
Designing for Raindrop (which problem to do we solve first?)Designing for Raindrop (which problem to do we solve first?)
Step 1
Step 2Step 3
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Designing for Raindrop (which problem to do we solve first?)Designing for Raindrop (which problem to do we solve first?)
Technical data:
Catchment area: 315.000m2
Max runoff entering into the tank: 1m3/secMax discharge from the tank to the trough trench through pumps: 0.25 or 0.5m3/sec
Technical data:
Catchment area: 315.000m2
Max runoff entering into the tank: 1m3/secMax discharge from the tank to the trough trench through pumps: 0.25 or 0.5m3/sec
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Ecomonic data:
Tank: 380.000€Trough trench: 30.000€Porous pavement: 40.000€Total: 450.000€
Ecomonic data:
Tank: 380.000€Trough trench: 30.000€Porous pavement: 40.000€Total: 450.000€
Designing for Raindrop (which problem to do we solve first?)Designing for Raindrop (which problem to do we solve first?)
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
0 10 20 30 40 50 60 70 80 90 100
t (min)
Q,I (m3/sec)
. š
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Administration for Raindrop (or democracy in modern Greece)Administration for Raindrop (or democracy in modern Greece)
Delays:A city in financial difficulties
Payment reimbursement delays from EU (still waiting)The city is not very wealthy
Elections on Oct 2006 - but new Mayor appointed in FebruaryVery close result (0.17%) with final decision in court… 4 months of administrative halt
Actions for solving the problem:Mobilization - The new Mayor took it personally
Meeting in Prague with project partnersMeeting in Rome with the Managing Authority
Results:No funds lostTransfer of funds from 2006 to 2007 (exceptionally)No total delayNo risk for the other project partners and their payments
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Works’ progress (in the land of our ancestors)Works’ progress (in the land of our ancestors)
Porous pavement: completed on May 20th
Works started on March 26th and by now:
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Works’ progress (in the land of our ancestors) Works’ progress (in the land of our ancestors)
Retention tank and trough trench:•Discovery of archaeological findings in <2m of depth•Manual work…from the National Archaeological Service•Findings (pottery, skeletons, a well, food storage facilities) were only 2000 years old…and belonged to poor people (no gold!) ==> The site was released after 15 days
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
Works’ progress (in the land of our ancestors)Works’ progress (in the land of our ancestors)
Retention tank:•Concreting completed. •Connection with the porous pavement completed•Connection of the flushing system to the sewer completed
•Estimated completion: June 30th
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
The future (Rain Drop: much more than just a drop!) The future (Rain Drop: much more than just a drop!) Big retention schemes are designed in combination with stormwater network:•Reducing runoff discharge compared to “classic network only” from 24-->6m3/s •Diversion of supercritical flow >14m3/s with lateral weir schemes•Tanks ~12m deep with parking above them
Σ2:
T=10
Q=10.00m3/s
tc=0.27h
Σ1:
T=10
Q=14.0m3/s
tc=0.34h
2500m2
5.000m2
Σ2:
Vανάσχεσης=10.000m3
Q=3.5m3/s
Σ1:
Vανάσχεσης=20.000m3
Q=2.5m3/s
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
The future (Rain Drop: much more than just a drop!) The future (Rain Drop: much more than just a drop!) Authorities are embracing BMPs: Construction of networks will be approved on one condition: Retention to the existing runoff discharge to the rivers (assuming no network at all)
BMPs are emerging: •Acharnai - Agia Anna district, 0.7km2
•Municipality of Ano Liossia, 8km2 of urban space with 30,000 inhabitants•Athens Military hospital extension, 0.1km2
BMPs in the regulatory framework:The Ministry of Environment Planning and Public Works & National Technical University are working on the:
•Overview of the legal framework in the developed countries•A Law Proposal/Draft to include BMPs in SW design and planning nationwide
The future of RainDrop in the context of the new INTERREG:•Experienced, coherent, and successful team•BMPs with a more holistic approach - Include the upstream parts in the design•Climate change…
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
The Raindrop experience (lessons and the final outcome)The Raindrop experience (lessons and the final outcome)
Experience (or lesson!) No1: Driving in the bumpy road of project implementation…•Delays can happen (we are not UFOs, we are operating in the political and administrative reality)
•Funding reimbursement delays•Delays in works’progress•Political fist fighting
•Delays are not the end of the world (do not panic!)•No need to point fingers among partners•Opportunism (another bad –ism) is not the right way of thinking
Experience (or lesson!) No2: Dealing with the Bosses…Success (or failure) is for everybody …•EU Commission and MA and the JTS are not ruthless queens (on the contrary…)
•We can always talk to them•They are there to listen•They want to help, not to punish!
•Project Partners, Lead Partner, JTS, MA, and the EU Commission are all partners after all•Talking regularly has been a very good medicine to all problems• Communication and transversal information is always welcome MA<->LP <->PP
Experience (or lesson!) No3: EU projects are a great thing!•Multidisciplinary, multinational, multicultural endeavours (Its all about Europe after all) •They are projects providing impetus for change
•Promotion of new ideas and technologies•Promotion of environmentally friendly and technically sound solutions •Shaping the future in our profession
Municipaliy of Acharnai YDRONOMI Consulting EngineersMunicipaliy of Acharnai YDRONOMI Consulting Engineers
The Raindrop experience (lessons and the final outcome)The Raindrop experience (lessons and the final outcome)
The final outcomes from Raindrop project
•Methodology for Storm Water Management Master Planning•Step by step approach•Based on the principles:
• Maintain as undisturbed as possible the hydrological cycle after the urbanization. •Peak flows and flow volumes will not exceed those before urbanization.
•Fundamentally ecological approach of SWM.
•Guidelines for the selection of BMPs •Advantages / Disadvantages•Relative costs•A straightforward tool without getting into complicated science