Report on mechanical tests and possible operation scheme of the liquid recirculation for ARGONTUBE. Internal meeting 31/01/2007. Mechanical test with rings at LHEP. Contacts with HBB Biegetechnik able to make the rings Order placed (receive rings in 2 weeks) - PowerPoint PPT Presentation
Transcript of Internal meeting 31/01/2007
Report on mechanical testsand possible operation scheme
of the liquid recirculation for ARGONTUBE
Internal meeting 31/01/2007
Mechanical test with rings at LHEP
Contacts with HBB Biegetechnikable to make the rings
Order placed (receive rings in 2 weeks)
Soon after realize the prototype
LN
Vacuumpump
Artank
Artank
Oxysorb
Hydrosorb
Oxysorb
Hydrosorb