![Page 1: Internal Letter 01% Rockwell Internationalgroup3... · Marshall and Smith, will be certified as Level 1 UT Examiners next week. ... for the inspection plan. Technical marketing funding](https://reader030.fdocuments.us/reader030/viewer/2022041123/5d2ee3a888c993893a8bfb2d/html5/thumbnails/1.jpg)
Internal Letter 01% Rockwell Internationa lDate :
TO :
• September 30, 1983 No : .
(Name , Organization , Internal Address) FROM : (Name, Organization, Internal Address, Phone )
J . P. Page F . C . Schrag071, 731, T006 • 071, 731, T020
5383
subject : . HIGHLIGHTS - WEEK ENDING 09-30-8 3
RIHL (Babcock)
SEFOR (Campbell )
Waste processing continued . A third 19A box was 75% filled wit hlow level, non-TRU waste. Five more drums of TRU waste, not requiringshielding, were packaged . The remaining solid waste is thirty-twodrums of TRU waste that requires re-packaging with shielding . Thelead sheet is scheduled for shipment today . Packaging of the aci dis on hold pending receipt of the lead shielding tubes, scheduled forshipment today .
EBR-II (Frazier )
The use of 1 .9 CFM of oxygen injected through the nozzle as a cuttingaid was evaluated . The power requirements dropped from 160 W to 75 W ;the cuts were clean and reproducible . Minimum dross was deposited onthe fuel . A meeting to review the safety aspects of applying thisapproach to EBR fuel rods has been scheduled for Monday . Successfullaser cuts were made on the wrapper tube to establish parameters incase this becomes a part of the disassembly process .
EBR-II (DeMinico )
Design effort continued on the Dowanol evaporator system . Assembly ofthe laser head track was started in the mock-up area in the shop .
Facility (Martin )
It was generally agreed that the air flow problem reported last weekwas caused by the absolute filters added for alpha contaminationcontainment .H&RS has agreed that we can operate safely and withinlicense requirements under the existing conditions . Engineering willbe performed to increase filter area and increase flow .
RMDF (Meyer)
EBR-II
Fourteen additional assemblies, shipment #10, were received this week .Total inventory is now 140 .
SEFOR
Vault #4 clean-up, removal and storage of all equipment, storage rac kand tooling and vacuuming of the vault was completed . Drums of SNM locatedin Vault #3 were rearranged and covered for long term storage . The vaultwas vacuumed and prepared for Hallam cask loading operations . The Hallamcask loading procedure is final typed and on signature route .
=orm ! 31- ;R Rev . 3-76
MBNA0170897 1
HDMSPOOI 837994
![Page 2: Internal Letter 01% Rockwell Internationalgroup3... · Marshall and Smith, will be certified as Level 1 UT Examiners next week. ... for the inspection plan. Technical marketing funding](https://reader030.fdocuments.us/reader030/viewer/2022041123/5d2ee3a888c993893a8bfb2d/html5/thumbnails/2.jpg)
HighlightsWk . Ending 09-30-83Page 2
RMDF Continued . . . . . . .
RMDF Operation s
Unusable equipment continues to be surveyed and sent to salvage i fclean . The evaporator plenum pre- filters were changed and the controllerrepaired . The last eight galvanized drums were shipped to Building 20 .Another shipment of 50 drums is scheduled for October 14 .
Problem : The holdup pond pumping system is not designed properly andsubsequently is not operating properly . We will make the necessaryfloat switch changes to eliminate pump on/off chatter .
Building 059 Activitie s
The ground water at Building 059 is remaining level instead of falling,probably due to the rain this week . Sand pit water continues to riseat about 1/4" per day .
NMDF ( Meyer )
A power supply , exhaust filters , and pressure release devices were packaged .Eight drums of TRU waste were repackaged in galvanized drums .
T093 (L-85) (Meyer )
Scabbling of contaminated areas on the floor is complete . Miscellaneouscontaminated equipment was removed , packaged and sent to RMDF. The floorarea was surveyed and released as clean . Contaminated shielding blocks werewrapped and boxes were ordered .
SAF Line (Marzec )
The engineering report to the SAF Line power transport system cleanoutmethods assessment is completed . The Program Office will complete thereport and issue the document next fiscal year .
IR&D Concrete Demolition ( Marzec )
Information has been collected on the IR&D funded concrete demolitionproject . CAPs will be prepared next week .
MBNA0170897 2
HDMSPOO1837995
![Page 3: Internal Letter 01% Rockwell Internationalgroup3... · Marshall and Smith, will be certified as Level 1 UT Examiners next week. ... for the inspection plan. Technical marketing funding](https://reader030.fdocuments.us/reader030/viewer/2022041123/5d2ee3a888c993893a8bfb2d/html5/thumbnails/3.jpg)
Highlights - W/E 9/30/83 Page 2
IS[ (McCurnin )
The Pertec disk drive was repaired and has been coupled to the sparecomputer for compiling of Fortran programs and converting dat afrom Pertec hard disks to Winchester . Connectors have been received tofinish out the PaR replacement cables . A pressure limit switch has beeninstalled in the PaR control chassis to prevent lowering the PaR withoutair pressure . Four variacs have been placed in the PaR control consoleto be able to vary the intensity of the TV camera lights . The SWR Iprocurement was received on Friday .
J . M . Harris , R . A . Marshall , D . E . Gjellum, P . H . Waite , N . A . Smith andJ . Little all passed the test for UT Level 1 Certification . All, exceptMarshall and Smith , will be certified as Level 1 UT Examiners next week .Marshall and Smith require additional on-the-job training prior to certi-fication . This was the largest group tested to date and they had the highes taverage score . Budgetary and scheduling information were prepared for IR&Dtasks for Fiscal Year 1984 . First quarter capital requirements have beenspecified . Detailed drawings were received from Bagac . The drawings willbe used to complete the design of the flange device and prepare weld mapsfor the inspection plan . Technical marketing funding has been used toprepare generic weld maps for Combustion Engineering plants . Palisades datawas used and the weld maps are on Cad /Cam ..
Software (R . C . Lewis )
Revision B of 444TI000023 ( ISI input data set generation ), Revision A of444TI000025 (ISI UT measurement), and Revision C of 444TI0000T5 (ISIData Retrival Program ) are being signed off and should be released nextweek . Work continues on programming of variable recording gates whichwill allow different threshold levels to be used for the near frontsurface area , the first 1/4 T thickness area, and the area between 1/4 Tand the back surface reflection . Training class for the TPC ISI inspection,to be conducted in mid-October , was completed .
. C. SchragActing Manage rNuclear Operations
/gb
MBNA0170897 3
HDMSPOO1837996