Intermountain West (IMW) Strategic Planning Meeting Walter Arabasz Regional Coordinator Aug. 14,...
-
date post
19-Dec-2015 -
Category
Documents
-
view
214 -
download
0
Transcript of Intermountain West (IMW) Strategic Planning Meeting Walter Arabasz Regional Coordinator Aug. 14,...
Intermountain West (IMW)Intermountain West (IMW)Strategic Planning MeetingStrategic Planning Meeting
Walter ArabaszRegional Coordinator
Aug. 14, 2006Aug. 14, 2006
Introduction(s)
ANSS-IMW Organizational ANSS-IMW Organizational StructureStructure
Regional Advisory Committee(18 members—2 from each state,except 1 from AZ, and 3 “at large”)
Regional Working Group(16 members, incl. rep’s fromall major networks and every state)
UT12 members,incl. 10 engrs
state level advisory committees
NV~17 members
CO~20 members
Regional Coordinator: Walter Arabasz
IMW Web site: www.seis.utah.edu/anss
RACRACMembers Members RepresenteRepresenteddat Thisat ThisMeetingMeeting
(1)
(2)
(2)
(1)(1)
(2)
(2)
Plus one of three RAC “at large” members
MBMG
YVOBYUI
IEL
LANLNAU
UU
Map 7
UNR
SeismicSeismicNetworks Networks RepresentRepresentededat Thisat ThisMeetingMeeting
Plus NEIC, NSMP, and YVO’s Scientist-in-Charge
Attendees at this meetingAttendees at this meeting
All eight IMW states 8 RAC members + 4 RAC alternates
(out of 18 RAC members) 12 network seismologists representing
8 regional / local IMW nets ANSS management, NEIC, NSMP, and
YVO also represented Majority—but not an exhaustive—
representation for an IMW “constitutional convention”