Fire Extinguishers & Chemical Emergency Lighting & Supplies Sprinklers, Standpipe & Fire Hose
INTEGRITY EXCELLENCE TRUST -...
Transcript of INTEGRITY EXCELLENCE TRUST -...
INTEGRITY
EXCELLENCE
TRUST
325.695.1070 817.594.9880
[email protected] www.jacobmartin.com
3465 Curry Lane Abilene, TX 76906
1508 Santa Fe, Suite 203 Weatherford, TX 76086
TBPE Firm #: 2448 | TBAE Firm #: BR 2261 | TBPLS Firm #: 10024300 – Abilene | TBPLS Firm #: 10193992 - Weatherford
REQUEST FOR PROPOSAL
GEOTECHNICAL STUDY
For
CITY OF LAWN
STANDPIPE CONSTRUCTION
A. INTRODUCTION
The City of Lawn (City) is proposing to construct two standpipes. The preliminary design for the
“CR150” Standpipe is 70,000 gallon, 14’ diameter x 60’ tall standpipe. The preliminary design for the
“Lawn” Standpipe is 160,000 gallon, 16’ diameter x 105’ tall standpipe. Attached is a preliminary site
plan for both standpipe sites. Also attached is a location map for the proposed standpipe sites.
We are requesting your firm submit a proposal for geotechnical engineering as outlined below.
B. GEOTECHNICAL PROPOSAL
Your proposal and scope of work should at a minimum include the following:
1. Field Exploration
• One borehole at each proposed standpipe location (30 feet deep).
• Standard Penetration Tests at each site.
2. Laboratory Testing
Laboratory testing shall be conducted on samples that are representative of each layer of material
obtained from the field exploration. Laboratory testing shall include the following:
• Atterberg Limits Tests (liquid limit, plastic limit and plasticity index)
• Percent Passing #200 Sieve
• Moisture Contents
• Unit Weight Determinations
• Unconfined Compressive Strength
• Pocket Penetrometer
3. Engineering Analysis, Recommendations, and Report
Results of the geotechnical investigation shall be presented in a formal report. The report shall
include boring logs and laboratory test results. The report shall also include general site
characterization, geotechnical foundation design criteria and earthwork criteria. An electronic copy
of the report shall be emailed to our office.
4. Compensation
325.695.1070 817.594.9880
[email protected] www.jacobmartin.com
3465 Curry Lane Abilene, TX 76906
1508 Santa Fe, Suite 203 Weatherford, TX 76086
TBPE Firm #: 2448 | TBAE Firm #: BR 2261 | TBPLS Firm #: 10024300 – Abilene | TBPLS Firm #: 10193992 - Weatherford
Proposal shall include lump sum price for each of the two sites, which will include compensation
for all work including field explorations, laboratory testing and geotechnical report.
5. Schedule
Proposal shall include proposed timeline for field explorations and submittal of geotechnical report.
6. Special Considerations
• Representative from City of Lawn will provide access to the standpipe sites.
• The CR150 site has limited access and will more than likely need to be accessed over
uneven terrain.
C. REQUIRED NOTICE
This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business
Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of
Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that
applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts,
and procurements to M/WBEs through demonstration of the six affirmative steps. For more details of
the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/DBE.
D. SUBMISSION
Proposals for geotechnical services work must be received no later than 5:00 P.M.
on Friday, April 13, 2018. Proposals shall be submitted to the following mailing or email address:
Mailing Address: Attn: Cory Higgins
Jacob & Martin, LLC.
3465 Curry Lane
Abilene, Texas 79606
(325)695-1070
Email Address: [email protected]
1
9
6
2
1
9
6
3
1
9
6
2
1
9
6
2
1
9
6
2
1
9
6
3
1
9
6
3
1961
1
9
6
1
1
9
6
1
1
9
6
1
1
9
6
0
1959
1960
1
9
6
0
1963
1962
1961
1964
1
9
6
4
1
9
6
4
1
9
6
4
3465
CUR
RY L
ANE
ABIL
ENE,
TX
7960
632
5-69
5-10
70
1508
SAN
TA F
E DR
, STE
204
WEA
THER
FORD
, TX
7608
681
7-59
4-98
80
FIRM
# F
-244
8
BAR
IS O
NE
INCH
IN L
ENGT
H O
N O
RIGI
NAL
DRA
WIN
G.CH
ECK
SCAL
E &
ADJ
UST
ACC
ORD
INGL
Y.
TH
IS
D
OC
UM
EN
T IS
RE
LE
AS
ED
F
OR
R
EV
IE
W
ON
LY
U
ND
ER
T
HE
AU
TH
OR
IZ
AT
IO
N O
F C
OR
Y
HIG
GIN
S, P
.E
. #122012 A
ND
IS
NO
T T
O B
E U
SE
D F
OR
CO
NS
TR
UC
TIO
N, B
ID
DIN
G O
R
PE
RM
IT
TIN
G P
UR
PO
SE
S
T
T
75'
75'
40'
40'
3465
CUR
RY L
ANE
ABIL
ENE,
TX
7960
632
5-69
5-10
70
1508
SAN
TA F
E DR
, STE
204
WEA
THER
FORD
, TX
7608
681
7-59
4-98
80
FIRM
# F
-244
8
BAR
IS O
NE
INCH
IN L
ENGT
H O
N O
RIGI
NAL
DRA
WIN
G.CH
ECK
SCAL
E &
ADJ
UST
ACC
ORD
INGL
Y.
TH
IS
D
OC
UM
EN
T IS
RE
LE
AS
ED
F
OR
R
EV
IE
W
ON
LY
U
ND
ER
T
HE
AU
TH
OR
IZ
AT
IO
N O
F C
OR
Y
HIG
GIN
S, P
.E
. #122012 A
ND
IS
NO
T T
O B
E U
SE
D F
OR
CO
NS
TR
UC
TIO
N, B
ID
DIN
G O
R
PE
RM
IT
TIN
G P
UR
PO
SE
S
© 2018 Google
© 2018 Google
© 2018 Google
© 2018 Google
© 2018 Google
© 2018 Google
© 2018 Google
© 2018 Google
© 2018 Google