INTEGRATION LIU-PSB

DUMP

LIGNE BI

LIGNE BT, BTM

15/08/2012

Crane…

Page 2: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

PASSAGES DE CABLES 360-361NIVEAU MACHINE

PERIODE 15 PERIODE 1

PERIODE 16

PERIODE 14

PI PT

SMV

BSW

GEN

Page 3: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

GEN

Page 4: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

ZONE A

ZONE

B

ZONE C

EVAC

Page 5: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

Re-installation of large band pick up BR.WCM8L1; Impact 41642 BI.MTV30 (2 hublots),BI.MTV60 (8 hublots), BT.MTV30 (1 hublot); Impact 39744 Maintenance of the PSB tune system. Impact 40651 Remplacement pick-up UMA by BPSHV positions:BI.UMA20BI.UMA30BI.UMA40 (4

positions) BI.UMA50 (4 positions): Impact 38372 Replacement of BE-BI-PI transformers.BT.BCT.10; BTP.BCT10; BTM.BCT10;

BTY.BCT112: Impact 37257 Maintenance FWS Booster; Impact 35921 Démontage/Rénovation/Remontage des transformateurs BI.BCT10 ,

BI1.BCT20,BI2.BCT20 , BI3.BCT20 , BI4.BCT20; Impact 34611 Dismantling of 50 BLMs for repair and calibration and reinstall; Impact 34311 Replace the electronics of the SEM-grids BTM-line, Impact 27956 BT.UES40 : BT.UES10 tank MTV BTP..UES00: BTM.UES00 BTM:UES10 : BTY.UES120:

BTY.UES152: Replace with new type pick up Impact 27754. Requires ECR

Dedicated meeting to be organised by D.Hay directly after the PSB LS1 coordination meeting.. Invite P.Demarest, Jose Antonio Ferreira Somoza, Tobias, Delphine,

Page 6: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

GEN

Page 7: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

## ## ##1 2 3 4 5 6 ## ## ## ## ## #### ## ## ## ## ## ## #### ## ## ## ## #### ## ## ## ## ##

PS

AD

SPS

January February

6 13 20

L2

LEIR

27 3 10 17

7 8 9September October November

##DecemberMarch April May June July August## ## #### ## ## ## ## #### ## ## ##

7 14 21 28 5 1224 3 10 17 24 31 30 7 14 21 28 419 26 2 9 16 23 15 22

LHC

L3

CV in Injectors

PSB

3 10 17 24 1 822 29 6 13 20 2711 18 25 1 8 15

Ventilation

Hardware Tests

R2E@P1

67

78

67

R2E@P7 R2E@P5

Acce

ss

Acce

ssAc

ces

s

Acce

ss

Glob

al A

cces

s Tes

t1

Glob

al A

cces

s Tes

t2

Source

Hardw

Patr

ol

POPS

MPS Hardware tests

Patr

ol Cold-check Set up with

Bake-out

Hardware tests

AD

PSB / TT2

LEIR - L2- L3

PSB chilled w.

PS main magnets

East area AD target

SPS (last circuits)

HardwaAc

cess

MaEL

BI

BI

BI

BI

Hardwa

Patr

ol Cold-check

Patr

ol

DSO Cold-check outEL BATT1

81 12 23 34 4556 78

81 12 56 67 23 34 45

81 12 23 34 45

12 23 34 455667 7881

Cool -down (s tart)

Pressure tests

Powering Tests (start)

W closure (end)

Acce

ss Hardware tests

Patr

ol Cold-check Set up with BI

Cold-check out

Set up

Set up

Page 8: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…
Page 9: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…
Page 10: INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

PASSAGES DE CABLES 360-361NIVEAU MACHINE

PI

PT