![Page 1: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/1.jpg)
Integration
GlueX Detector Integration Mission:To ensure systems meet or exceed physics driven goals
To ensure that detectors are designed in a sensible way
To ensure they fit together when assembled and function as intended
Collaboration Meeting
December 2003
Eric Scott
![Page 2: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/2.jpg)
Prior conceptual goals
• Access to any detector package in one shift period
• Access to detector package without removing cables
• Signal cables as short as possible
• Fiber to control room– Limits ground loops
![Page 3: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/3.jpg)
Considerations from BABAR• Inter-system clearance of 20 mm
– Possible exceptions: parts close to solenoid or mechanically fastened to neighbors…
• Good Neighbor Policy– “No system may pass its problems to its neighbor
without the neighbor’s agreement.”– Such as: Thermal issues – heat put into the solenoid
must be removed.
• Common Services– Insertion Fixtures– Air Conditioning, heating, ventilation ?
http://www1.na.infn.it/wsubnucl/accel/BaBar_old/TDR.html
![Page 4: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/4.jpg)
Survey Thoughts
• Design detector packages with known external reference points.
• Establish reference convention: – Center of target Z=0 for experiment?– Offset from inside or outside upstream iron
• A realistic “human” reference
![Page 5: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/5.jpg)
Integration Packages
Solenoid & BarrelTracking
Cer
enko
v
TO
F
FC
AL
US Package DS PackageFixed Package
Package Access Area Package Access Area
![Page 6: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/6.jpg)
Living with our Solenoid…“Fixed Package”
• Fill the central gaps– Barrel Calorimeter covers them anyway– Reduces fringe field
• What other steel modifications are desirable / necessary?– US end Fringe Field Suppression
possibilities…
![Page 7: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/7.jpg)
Standard solenoid
Clipped 150 gauss
Upstream end
Solenoid face is at 0
Front gap is open 4 inches, all others are filled
Clo
sed
Sol
enoi
d
![Page 8: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/8.jpg)
Standard solenoid
Clipped 150 gauss
Upstream end
Solenoid face is at 0
Both ends opened the same amount.
All gaps are filled
Sta
ndar
d S
olen
oid
![Page 9: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/9.jpg)
Sol
enoi
d w
ith
Pla
te
Standard with 20” X 80” diameter plate located 4” US with a 12” diameter beam hole.
Clipped 150 gauss
Upstream end
Solenoid face is at 0
Both ends opened the same amount.
All gaps are filled
![Page 10: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/10.jpg)
Sol
enoi
d P
lug
Standard with 20” X 80” diameter Plug ~4” gap with a 12” diameter beam hole.
Clipped at 150 gauss
Upstream end
Solenoid face is at 0
Both ends opened the same amount.
All gaps are filled
![Page 11: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/11.jpg)
Inside the Barrel“US Package”
• CDC – Part of US package?– Cables out US end
• Planar Drift Modules– Part of US package / independent?– Cables out US or DS end
• DS cable exit – impact on acceptance?
• US volume
Tracking
![Page 12: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/12.jpg)
Possible interference point for DS cable path driven by Cerenkov design and physics acceptance issues…
![Page 13: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/13.jpg)
DS of Solenoid“DS Package”
• TOF & LGD– Package slides DS– Appliance concept
• Power & Cooling in
• Data out (Fiber?)
• Cerenkov– Could integrate with TOF & LGD package– Sets the elevation in the hall, should it still?
Cer
enko
v TO
F
FC
AL
![Page 14: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/14.jpg)
Avoiding the millimeter war…
• Unified CAD database: JLAB – Unigraphics? • Central repository• Maintainer
– One contact person
– One location
– Current source tree available to all
• Establish detector volumes for package groups• Procedure for when conflict arises…• Correlated with simulation geometry?
![Page 15: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/15.jpg)
One stop Engineering support?
• Who provides the service?
• What are they providing– A check on safety critical points
– Design assistance
– Full design service
• When do we have to have this person / group in place?
![Page 16: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/16.jpg)
Key near-term issues…• Magnet iron / Fringe field reduction (Shielding)• Experiment / Hall elevation (Cerenkov – other PID tech.)• Rack locations: US front, side, access while beam is on…• Cable / Optical space & paths
– All out front / some out front for inner sled– If some come out the back, acceptance issues?
• Detector interconnects (supports):– Designs must be finished by:______
• Power / Cooling needs and method– Inside magnet (CLEO’s PF-200IG based hydrocarbon coolant farm)
– Outside AC, chilled water…
• Fire detection / Suppression– Inside magnet gas system? (FM 200 – heptafluoropropane?)– Outside dry pipe, power interrupt on alarm – Fire-wire, air sampling – sniffers…
![Page 17: Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.](https://reader036.fdocuments.us/reader036/viewer/2022070407/56649e415503460f94b3394b/html5/thumbnails/17.jpg)