Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul...

15
Integrating information towards Digital ATM Airservi ces Australi a FIXM Experien Presented By: Paul Chisholm, Ph.D. Airservices Australia Date: August 28, 2013

Transcript of Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul...

Page 1: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

Integrating information towards Digital ATM

AirservicesAustralia

FIXM Experience

Presented By: Paul Chisholm, Ph.D.Airservices Australia

Date: August 28, 2013

Page 2: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

1

• Why• How• What

FIXM from a user perspectiveFIXM from a user perspective

Page 3: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

2

NAIPS

FIB

Eurocat

MTF

AAMS

Flight Explorer

Maestro

1. ICAO 44442. NAIPS Web Service3. FDR4. RDR5. EFEED6. Maestro External7. FIB Flight Entity8. 3PDI

1

11

2

34

6

78

5

Local IssuesLocal Issues

Page 4: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

3

ODSODS

• Generic service delivery platform• Based on service oriented architecture principles• SWIM enabler• ODS project will deliver a flight plan filing service• Flight model and information exchange is FIXM

Operational Data ServicesOperational Data Services

Page 5: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

4

ODS and FIXMODS and FIXM• Adopted FIXM v0.1 early 2012• Complex, immature

• Migrated to FIXM v1.0 August 2012• ICAO FPL, perfect fit, some issues

• Migrated to FIXM v1.1 January 2013• Defect fixes, maturity

• Migrating to FIXM v2.0 now• Major restructure, no FPL focus

Page 6: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

5

SARTIME• Time at which search and rescue activities

are initiated• Similar concepts in Canada and New Zealand

Itineraries• A sequence of time ordered flights• Could be all movements of a specific

airframe• Could be all flights the pilot will conduct• AIDX has itinerary concept

ExtensionsExtensions

Page 7: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

6

• FIXM operations is the end goal• There will be a considerable transition

period• Necessary to handle both FIXM and ICAO

4444 ATS messaging• Accept FIXM, distribute FPL• Accept FPL, store/distribute as FIXM• More generally situation being pursued by

ATMRPP via FF-ICE

Hybrid OpsHybrid Ops

Page 8: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

7

FPL, CHG, DLA, CNL, DEP, ARRValidate,

Create, Modify, Cancel, Retrieve

Web Services AFTN

FIXM Service

ATS Message Service

Service LayersService LayersLogical Architecture

Page 9: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

8

ORCA/FIBORCA/FIB

FIB

FIXM

ORCAService (Retrieve)

FPL AFTN ADS-B

Radar

ORCA: Off Route ORCA: Off Route Constraint Constraint

AssessorAssessor

FIB:FIB: Flight Flight Information Information BrokerBroker

Service (Check)

Service (Decode)

Page 10: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

9

FPL, CHG, DLA, CNL, DEP, ARRValidate,

Create, Modify, Cancel, Retrieve

Web Services

ATS Message Service

ODS and AIXMODS and AIXM

FIXM Service

Reference Service

Validate, Retrieve

AIXM

Page 11: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

10

Is early adoption worth it?Is early adoption worth it?

• Model developed by broad spectrum of international partners

• Early experience invaluable• FIXM enabled systems earlier• Progress with flight matching issues

Page 12: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

11

• Services are not in scope for FIXM• Airservices are developing their own set of

services• FIXM needs standardized services• ISRM (Information Services Reference Model)

will address this, but some way off• We need standardized services in the shorter

term for interoperability

ServicesServices

Page 13: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

12

• FIXM progress has been rapid• Unusual for a global standard• Positive effect on implementers• The momentum has to continue• Strategy/governance must facilitate progress• v3.0, first sufficiently complete version for

global exchange

ProgressProgress

Page 14: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

13

Page 15: Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.

Contact Information

14

[email protected]

[email protected]