Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for...

19
www.jacobs.com | worldwide Integrated Catchment - River Modelling of the Parramatta River to Support Achieving Swimmability Targets Lydia Cetin , Phillip Pedruco, Elizabeth Smolinska, Kate Byrnes – Jacobs Pei Tillman, Jonathan Dixon, Natalie Quinn – Sydney Water Sarah Clift – Parramatta River Catchment Group

Transcript of Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for...

Page 1: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

www.jacobs.com | worldwide

Integrated Catchment - River Modelling of the Parramatta River to Support Achieving Swimmability Targets

Lydia Cetin, Phillip Pedruco, Elizabeth Smolinska, Kate Byrnes – JacobsPei Tillman, Jonathan Dixon, Natalie Quinn – Sydney Water

Sarah Clift – Parramatta River Catchment Group

Page 2: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Parramatta River

2 Stormwater Victoria Conference 2017

Page 3: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Parramatta River

3 Stormwater Victoria Conference 2017

Page 4: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

‘Our Living River’ initiative• Parramatta River Catchment Group

est. 2014 with the mission of making the river swimmable by 2025

• Develop evidence based strategy, the Parramatta River Masterplan

– make lasting improvements to the local environment

– provide tangible benefits to the local community

– bringing together issues of sewer and stormwater pollution

– provide direction on what can be done with best cost benefit

4 Stormwater Victoria Conference 2017

Page 5: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Parramatta River Masterplan Process

5 Stormwater Victoria Conference 2017

Page 6: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

6 Stormwater Victoria Conference 2017

Page 7: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Water Quality Modelling• Developing an evidence base to:

– Modelling Enterococci - correlates to current primary recreation risk assessment frameworks

– Identify measures to improve Enterococci levels– Model and scenario development informed through stakeholder

workshops

Stormwater Victoria Conference 20177

Page 8: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Evidence base - Modelling• Sources

– Diffuse

– Point sources

• Pathways– Stormwater

– Overflows

– Waterways

• ReceptorsStormwater Victoria Conference 20178

Page 9: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Integrated modelling framework

• Sub-daily simulation• Captures spatial & temporal changes in flow and

concentrations (loads)

Stormwater Victoria Conference 20179

Page 10: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

MOUSE Model

Stormwater Victoria Conference 201710

Page 11: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Catchment model – Source Generation

Stormwater Victoria Conference 201711

Page 12: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Stormwater Victoria Conference 201712

Source Input loads

Page 13: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Receiving water model – Fate & Transport• Detailed modelling of the

Parramatta River and Estuary ~ 30km length of river

• Inflows from Source (incl. WWOF and Diffuse)

• Beach Watch criteria - 95th

percentile concs to assess swimmability

13 Stormwater Victoria Conference 2017

Page 14: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Simulation for Lower Parramatta Feb. 2014

Stormwater Victoria Conference 201714

Page 15: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Baseline mean concentrations – initial draft results

Stormwater Victoria Conference 201715

Page 16: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Water quality targets:enterococci 95th percentile over 2 years

Stormwater Victoria Conference 201716

Page 17: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

Business as Usual 2025 scenario

Stormwater Victoria Conference 201717

Page 18: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

How to fix - Options

Stormwater Victoria Conference 201718

Options Approach Scale Cost

Animal Management Awareness Source – Regional $

Stormwater Harvesting Planning / Engineering

Source – Local $$

Target high impact WWOFs Engineering Regional $$$

Page 19: Integrated Catchment - Stormwater Victoria...13 Stormwater Victoria Conference 2017. Simulation for Lower Parramatta Feb. 2014 14 Stormwater Victoria Conference 2017. Baseline mean

www.jacobs.com | worldwideMay 12, 2017

© Copyright Jacobs

Integrated Catchment - River Modelling of the Parramatta River to Support Achieving Swimmability Targets

Dr Lydia [email protected]