Transcript of Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Marina Markovic
BUNA/BOJANABUNA/BOJANA
Integrated Management PlanPlan
1
INTEGRATED RIVER BASIN MANAGEMENT &
INTEGRATED COASTAL ZONE MANAGEMENT
2
IMF Pil t j t f B /B jIMF: Pilot project for Buna/Bojana area
Integrating WFD and ICZM Protocol requirements; additionally Marine Strategy Framework Directive
Transboundary integration Integrating objectives and approaches of partner organisations UNESCO‐IHP, GWP‐Med, PAP/RACFeed into the proposed methodology
3
INTEGRATED MANAGEMENT FRAMEWORK ‐ IMF
Purposes
Support a participatory approach to ecosystem based planning and management in coastal zones. p g g
Assist the development of solution‐oriented plans for coastal zones with special attention to the integration of the surfacezones, with special attention to the integration of the surface waters, groundwater and aquifers, and biodiversity management.
Integrate climate change as a cross‐cutting issue throughout the planning and implementation process.
4
INTEGRATED MANAGEMENT FRAMEWORK ‐ IMF
Objectives
Pursue coherent multiple policy goals in the same or overlapping space in the coastal
zone
Ensure that policy instrument mixes mutually supportive in the pursuit of policy goals
Produce policy outcomes appropriate to specific coastal zone problem context
Add l t i di id l h h th t ‘th h l i t th th f thAdd value to individual approaches such that ‘the whole is greater than the sum of the
parts’ – synergy
Achieve a shared, efficient and effective use of limited human and logistical resources
Respond effectively to the more dynamic environment resulting from climate change
and development
T hi h d hi b th t th h b tt di ti dTo achieve shared ownership by the sectors through better coordination and
integration of the planning process.
5
INTEGRATED MANAGEMENT FRAMEWORK ‐ IMF
6
INITIATIONStages
ESTABLISHMENT
SETTING THE VISION
ANALYSIS & FUTURES
DESIGNING THE FUTURE
REALISING THE VISION
THE CHALLENGE
Teams set‐up
Fi t t t t d b F b /M hFirst outputs expected by February/March
Draft Plan by June
Formal difficoultiesFormal difficoulties
Big teams
Steering committee not fully established and operationalSteering committee not fully established and operational
The challenge: interest and usability of the Plan
8
THANK YOU VERY MUCH FOR YOUR ATTENTION!THANK YOU VERY MUCH FOR YOUR ATTENTION!
9