Transcript of Installation: the plan. Reality Pressure dome: the problem.
Installation: the plan
Reality
Pressure dome: the problem
The Rack, Mark I
Scan Head, in place, finally
Pressure Vessel “Doghouse”
Equipment Racks -
Cable Run 6
144Z AMS Configuration
AMS Mosaic 3/1/13
7
Magna, UTKennecott Smelter
Kennecott Stack 3/1/13
8
Kennecott Stack
West Valley City, UT 3/1/13
DRAFT 9
RSAC
AirCell Issues
Leaver Arm Measurements for Applinix Installed electronics into IPM box Integrate IPM and conduct ground tests Reconfigure AirCell for static IP and reset router Connect IPM to AirCell and AMS Test Ground Processing Software Connection
Wasatch Front 3/29/13
-112.245 42.069 7,5,3 7.6m
Wasatch Front 3/29/13
Utah Lake 3/29/13
• Imagery will be evaluated by USGS for hot spring monitoring project