Project Name: W48th street Trunk Main
Project ID: MED 599
Installation of Trunk Water Main along West 48th Street
[including work on 49th St., 51st St., 8th Ave, 9th Ave and 10th Ave]
LEAD Project ID: MED609(599)
Entire Project duration: 2012 - 2017
Engineering Firm: LiRo Group
Contractor: Waterworks, JV
![Page 2: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/2.jpg)
5/4/2015
Slide 2
Project Name: W48th street Trunk Main
Project ID: MED 599
Project Intent & Purpose:
New York City’s water distribution infrastructure is aging and in need of repair and upgrades.
To accomplish this, the City of New York has constructed a new water tunnel, City Tunnel No. 3.
The W. 48th Street project is one of 10 similar projects in Manhattan that will connect new shaft distribution chambers to City Tunnel No. 3.
Upon completion of these chambers, the City will be able to activate sections of the new tunnel #3 and begin rehabilitating City Tunnel Nos. 1 & 2.
![Page 3: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/3.jpg)
5/4/2015
Slide 3
Project Name: W48th street Trunk Main
Project ID: MED 599
![Page 4: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/4.jpg)
5/4/2015
Slide 4
Project Name: W48th street Trunk Main
Project ID: MED 599
PROJECT SCOPE &
SCHEDULE
![Page 5: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/5.jpg)
5/4/2015
Slide 5
Project Name: W48th street Trunk Main
Project ID: MED 599
![Page 6: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/6.jpg)
5/4/2015
Slide 6
Project Name: W48th street Trunk Main
Project ID: MED 599
Project Duration
• Began Spring 2012 – Anticipated completion Fall 2017
• Original construction duration is 2,005 Consecutive Calendar Days (CCD) or approximately 5 ½ years.
• Currently 10 months ahead of schedule.
![Page 7: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/7.jpg)
5/4/2015
Slide 7
Project Name: W48th street Trunk Main
Project ID: MED 599
Scope of Work:
• New trunk and distribution water mains Including:
• 48”, 36” and 30” trunk mains
• 24”, 20” and 12” distribution mains
• Valves, regulators & chambers
• Reconstruction of roadway, curbs &
sidewalks in certain locations
• Private utility upgrades
![Page 8: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/8.jpg)
5/4/2015
Slide 8
Project Name: W48th street Trunk Main
Project ID: MED 599
Allowable Work Days/Hours: (as per NYC DOT Stipulations)
7AM – 10PM: Monday – Friday (Allowable Hours)
8AM – 6PM: Saturday & Sunday (Allowable Hours)
Some locations require night work
Typical weekday work hours are 7:00 AM to 3:30 PM
![Page 9: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/9.jpg)
5/4/2015
Slide 9
Project Name: W48th street Trunk Main
Project ID: MED 599
WORK COMPLETED
• Approximately 95% of distribution water main
and 65% of trunk main work completed
• All work completed on W 48th between Broadway
and 9th Avenue
• All work, except roadway restoration, completed
in W 48th between 9th & 10th Avenues and on 9th
Ave. between W 47th & W 52nd Streets
• New sewer, 12” distribution and 36” trunk mains
installed in W 51st between 8th and 9th Avenues
![Page 10: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/10.jpg)
5/4/2015
Slide 10
Project Name: W48th street Trunk Main
Project ID: MED 599
![Page 11: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/11.jpg)
5/4/2015
Slide 11
Project Name: W48th street Trunk Main
Project ID: MED 599
48” Trunk Main & Utilities in W48th Street At Shaft Connection
![Page 12: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/12.jpg)
5/4/2015
Slide 12
Project Name: W48th street Trunk Main
Project ID: MED 599
48” Trunk Main Trench in 9th Avenue
![Page 13: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/13.jpg)
5/4/2015
Slide 13
Project Name: W48th street Trunk Main
Project ID: MED 599
Work Completed: Work Ongoing:
CB5 CB4
CURRENT
Spring 2016:
![Page 14: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/14.jpg)
5/4/2015
Slide 14
Project Name: W48th street Trunk Main
Project ID: MED 599
NEXT SIX MONTHS
Summer/Fall 2015
• Reconstruct roadway, curbs and sidewalks(as needed) on 9th
Avenue between W 47th and W 52nd Streets.
• Reconstruct roadway, curbs and sidewalks(as needed) on W 48th
between 9th and 10th Avenues.(ongoing)
• Continue installation of new combined sewer and new 36”/30”
trunk main on W 51st Street between 7th and 8th Avenues.
• Continue installation and replacement of 48” trunk main in 10th
Avenue between W 48th and W 49th Streets.
![Page 15: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/15.jpg)
5/4/2015
Slide 15
Project Name: W48th street Trunk Main
Project ID: MED 599
9th Avenue Roadway Reconstruction
1. To begin immediately after 9 th Avenue Food festival
2. Complete roadway reconstruction from W47th to W52st streets
3. Two (2) lanes will be closed during each stage
4. One (1) block to be rebuilt at a time
5. Some Con Edison gas main replacement work will also be
included(west side only)
6. Street hardware to be ramped awaiting final asphalt wearing
course
7. Entire process will take approx. 6 months
![Page 16: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/16.jpg)
5/4/2015
Slide 16
Project Name: W48th street Trunk Main
Project ID: MED 599
Work Completed:
Work Ongoing:
CB5 CB4
AFTER 6 MONTHS
Spring 2016:
![Page 17: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/17.jpg)
5/4/2015
Slide 17
Project Name: W48th street Trunk Main
Project ID: MED 599
COMMUNITY CONCERNS • Pedestrian access will be maintained at all times
• Uniformed NYPD Traffic Agents assigned for traffic control.
• Sidewalk and/or loading dock access from the curb may be
temporarily restricted while work is conducted (coordination will be
arranged on a case by case basis)
• Parking may be temporarily restricted during construction
![Page 18: Installation of Trunk Water Main along West 48th Street › html › mancb4 › downloads › pdf › 2015 PDFs › May... · 5/4/2015 Slide 14 Project Name: W48th street Trunk Main](https://reader034.fdocuments.us/reader034/viewer/2022042405/5f1da64037ba5e7ca22d0577/html5/thumbnails/18.jpg)
5/4/2015
Slide 18
Project Name: W48th street Trunk Main
Project ID: MED 599
Keeping You Informed Office of Community Outreach & Notification, DDC
• DDC has assigned Nadine Harris of LiRo Group, Engineers, as the
Community Construction Liaison (CCL).
• First point of contact between the project and the community
• Identifying, addressing and/or resolving field inquiries & issues as well as any coordination between the project and needs of the affected stakeholders
• Providing regular updates/advisories for the community to better plan around construction activities
• CCL contact information:
• Name: Nadine Harris
• Email: [email protected]
• Field Office: 333 W 52nd St, 4th Floor, New York, NY 10019
• Telephone : (646)-738-4887