Page 1: Installation Manual Bizhub Pro 1050

E-1 56UA97360

INSTALLATION MANUAL

I. Installation space (Machine combination examples)

Machine weight: Approx. 330 kg (Main body + ADF)

1050+DF-603+PF-701+LS-501(x2)+FS-503

213389

4138

4338

807100

895785544237

85100

1020

1580

785

650

(unit: mm)

306

1050+DF-603+PF-701+FS-503

213

306

389

2568

1880 2768

807675

780

950

100150 100

895544

1020

1580

650

237

85

(unit: mm)(unit: mm)

1050+DF-603+PF-701+FD-501+FS-503

213389

2968

3168

807100

895544 400100

10201190

1580

650

85

(unit: mm)

237

306

Applied Machine:

Page 2: Installation Manual Bizhub Pro 1050

E-2

II. Confirmation prior to installation1. Select a flat and stable place that can sustain the

machine’s weight.2. Confirm that the voltage and the frequency meet

the product specifications, and that the currentcapacity of the outlet meets or exceeds thecapacity specified.

3. Connect the machine directly to a dedicatedpower outlet. (Do not use an extension cord.)

4. Do not plug or unplug the power cord with a wetor dirty hand. (May cause an electrical shock.)

5. Do not install the machine in a place with hightemperatures or high humidity, or in direct sun-light.

6. Do not install the machine in a dusty place, and/or near volatile flammable substances.

7. Do not install the machine in a poorly ventilatedplace.

III. Directions for placing the machine onthe floor

1. Place the wooden spacers under the Adjusterfeet. Then extend the Adjuster feet enough toremove the cushions with the spanner. Removethe cushions.

2. Wind up the Adjuster feet again to let themachine descend onto the pallet. Make sure towind up the Adjuster feet all the way.

* Work on above steps 1 and 2 in succession,respectively for the right side and the left side ofthe machine.

3. Fix the slope board with nails to the rear end ofthe pallet, setting its beveled portion upward asshown in the figure.

4. Set the two cushions removed from the machinebelow the slope board as shown in the figure.

5. Bring the machine down carefully onto the floorusing two people with the rear side coming first.

Note:Make sure that the casters do not fall off the slopewhen moving the machine onto the floor.

Spanner

Wooden spacer

Corrugated fiberboard NailSlope board

BackFront

Corrugated fiberboard Slope board

Page 3: Installation Manual Bizhub Pro 1050

E-3

IV. Accessory parts

Note:Refer to the service manual concerning the use ofthe following accessory parts.

No. Name Shape Q’ty

1. Wooden spacer 4

2. Ventilation duct

1

3. Developer[for North America, South and CentralAmerica (part areais excluded), Philippines only]

1

4. Cotton swab1

5. Installationmanual

1

6. User’s guide(except for Europe)

Each1

7. Nail 2

8. Slope board

1

9. Glass cleaning label 1

10. Cap 2

11. Arm cover/11

12. Arm cover/21

13. User’s guideholder

1

14. Ferrite core1

15. Arm cover/31

16. Control panel

1

17. Adjusting knob1

18. Sticker 1

19. CD-ROM(user software, user manual, etc.)

2

20. Side cover/21

21. TP screw M4x6 4

22. Truss screw(black) M4x6 6

23. Bind screw (black) M4x8 2

No. Name Shape Q’ty

24. Weight 4

25. Cleaning brush1

26. Positioningscrew 2

27. TP screw M3x8 2

28. TP screw M3x6 2

No. Name Shape Q’ty

Page 4: Installation Manual Bizhub Pro 1050

E-4

V. Installation proceduresNote:

Do not plug in the power cord until you are instructedto do so.

1. Remove the wrapping sheet from the ADF.2. Inspect the outside of the Main body and confirm

that there is no damage.3. Remove the plastic wrapping on the pole for the

control panel.4. Remove the locking tapes on the exterior panels.Note:

Locking guide tapes indicate the portions to beunlocked; those tapes should be removed after thecompletion of each unlocking procedure.

5. Open the ADF, and remove the original glass pro-tecting cushion and the original glass protectingpaper.

6. Remove the Optics unit locking screw on the leftside of the Main body.

7. Remove the locking tapes within the Trays.(1) Open the Toner supply door. Pull out Tray 1

while raising the Lock lever mounted on the leftside of the tray.

Front

door

Front left

door

Toner supply

door

Wrapping sheet

Control panel

pole

Tray 1

locking

guide tape

Tray 2

locking

guide tape

Original glass protecting paper

Original glass protecting cushion

Red paper

Optics unit locking screw

Lock lever

Page 5: Installation Manual Bizhub Pro 1050

E-5

(2) Remove the locking tapes first and then at theend locking guide tape of Tray 1.

(3) Repeat procedures (1) and (2) to remove thelocking tapes of Tray 2.

(4) Close the Toner supply door.8. Release the Duplex unit lock.

(1) Open the Front door and the Front left door.(2) Remove the protecting sheet from the Front

door.(3) Insert a screwdriver under the Duplex unit, and

while pushing the Duplex unit lock to the left torelease it (Arrow ), turn the Duplex unitrelease lever to the right (Arrow ).

(4) Loosen two screws on the Fusing unit coverand remove the cover.

(5) Loosen three screws on the Photo conductorunit cover and remove the cover.

(6) Remove the Duplex unit lock screws. (Screws, & )

(7) Remove two Duplex unit lock pieces. (Arrows & ) (Right and left sides: 1 pc. each)

(8) While pulling the Duplex unit out, remove thelock piece indicated by Arrow .

(9) Remove the lock piece indicated by Arrow (1 screw) and the lock piece indicated byArrow (2 screws).

Locking tapeLocking guide tape

Fusing unit cover

Photo conductor unit cover

Procedure (3)

Duplex unit lock

Page 6: Installation Manual Bizhub Pro 1050

E-6

(10) Turn the Reverse unit and the Jam recoverylever to the left and remove the locking tapeon the Pressure release shaft. Then insert ascrewdriver into the hole in the Pressurerelease shaft and turn it counterclockwise untilit hits the end.

(11) Return the Reverse unit and the Jam recoverylever to their original positions, and secure theFusing unit cover with two screws.

(12) Reinstall the Duplex unit to the Main body,and turn the Release lever to the locking posi-tion.

(13) Close the Front left door and the Front door.9. Install the Control panel.

(1) Remove the back cover (9 screws).

(2) Remove two screws to take out the Top cover/1.

(3) Remove the External panel installation board/A(3 screws).

(4) Install the Control panel on the Control panelpole. Make sure to put the connector of theControl panel through the pole.

Reverse unit

Jam recovery leverLocking tape

Pressure release

shaft

Back cover

Top cover/1

External panel

installation board/A

Control

panel

Control panel pole

Page 7: Installation Manual Bizhub Pro 1050

E-7

(5) Install the Arm cover/3 (TP screw M4x6: 3 pcs).

Note:Arm length can be changed upon customerrequest. The position of the Control panel can beadjusted forward or backward.Default setting at installation: Arm is positionedforward.If the change is not necessary, move to step (6) onpage E-7.

Procedures to change Control panel arm length

(6) Install the Ferrite core on the Control panelconnector.

Step

1. Remove the Arm cover/4 and the Arm cover/5 (2 screws each).

2. Remove the Arm fixing screws (top surface:4 pcs., bottom surface: 2 pcs.)

Arm cover/3

TP screws M4x6

Arm cover/4

Arm cover/5

Arm fixing

screws

Arm fixing screws

3. Shorten the Control panel arm and fix it (topsurface: 4 pcs., bottom surface: 2 pcs.)

4. Install the Arm cover/4 first, then the Armcover/5 (2 screws each).

Note:Pay attention as Arm cover/4 screws arelonger than the other screws (truss screwsM4x8).

Step

Arm fixing screws

Arm fixing screws

Arm cover/4Arm cover/5

Pay attention as these screws are longer than other screws.Truss screws M4x8

Ferrite core

Earth plate

Page 8: Installation Manual Bizhub Pro 1050

E-8

(7) Connect two connectors of the Control panel tothe Main body control board, and secure theEarth plate with a screw (TP screw M4x6: 1pc.)

(8) Install the External panel installation board/A (3screws).

(9) Install the Top cover/1 (2 screws). After secur-ing the cover with screws, install two caps.

(10) Install the Arm cover/1 and the Arm cover/2(truss screw M4x6: 4 pcs.)

(11) Install the Adjusting knob (bind screw M4x8: 2pcs.)

(12) Place a sticker on the top of the Arm cover 1and 2.

(13) Remove the wrapping sheet of the Controlpanel.

(14) Install the back cover (9 screws).

Connectors

TP screw M4x6

External panel

installation board/A

Caps

Top cover/1

Truss screws M4x6

Arm cover/1 Arm cover/2

Truss screws M4x6

Bind screws M4x8

Adjusting knob

Sticker

Page 9: Installation Manual Bizhub Pro 1050

E-9

10. Plug in the power cord and turn the Main andSub switches ON. After the completion of theelectrode cleaning process (this process is exe-cuted automatically and takes about 1 minute),turn the Sub switch OFF.

Note: • The Cleaning blade is preset to the invalid posi-

tion at the factory. The ON/OFF operation of theSub switch initializes that position and placesthe Cleaning blade at the valid position.

• Do not omit this ON/OFF operation, as anotherreason is that the automatic electrode cleaningoperation is executed simultaneously.

• The Photo conductor will start turning about 30seconds after the electrode is cleaned, so turnthe Sub switch OFF before that occurs.

11. Turn the Main switch OFF.12. Apply the setting powder on the Photo conduc-

tor.(1) Open the Front door.(2) Remove screw ( ) and loosen screw ( )

securing the bracket of the Toner supply unit tothe Main body.

(3) Pull out the bracket of the Toner supply unit(Arrow ). While releasing the lock (Arrow

), open the Toner supply unit 180 degrees(Arrow ).

(4) Insert a screwdriver under the Duplex unit, andwhile pushing the Duplex unit lock to the left torelease it, turn the Duplex unit release lever tothe right.

(5) Remove screw ( ) from the Toner recyclingpipe. Pull out the Toner recycling pipe knob toraise the pipe.

(6) Remove the screw on the Coupling ( ) and 2screws ( ) on the Photo conductor unit. Holdthe Photo conductor unit with both hands asshown in the figure to pull it out.

Note: • Place your left hand on the circle engravings on

the Photo conductor unit. • When pulling out the Photo conductor unit,

make sure that the Duplex unit is inserted in theMain body.Lock

KnobToner recycling

pipe

Engravings

Page 10: Installation Manual Bizhub Pro 1050

E-10

(7) Remove the screw fixing the Developer suctionbox. Then pull the box out, tilting it at an angle.

(8) Hold the back of the Developing unit, andrelease the Developing unit pressure lever asshown in the figure.

(9) Hold both ends of the Developing unit andremove it carefully from the Photo conductorunit.

(10) Pull up the claws of the upper cover toremove the cover.

Note:Do not work in a dusty place (to prevent foreignobjects from getting into the unit).

(11) Add developer evenly from the top of the Agi-tator screw along its entire length.

(12) Rotate the Developing gear counterclockwiseto coat the Developer around the Developingroller completely.

Note:Do not rotate the Developing gear clockwise.

Developer suction box

Developing unit

pressure lever

Claws

Developing roller

Page 11: Installation Manual Bizhub Pro 1050

E-11

(13) Reinstall the Developing unit cover.Note:

Make sure that both the bosses of the upper coverare put into the slots on the Developing unit.

(14) Remove the locking tapes from the Cleaningunit lock lever.

(15) Disconnect the connector (1 pc.) from theCharging corona unit, and remove the wiringfrom the clamp. Remove the Charging coronaunit by holding both grips.

Note:The Charging corona unit must be face up when itis placed.

(16) Disconnect the connector and clamp from theStay, and release the Cleaning unit by turningthe Cleaning unit lock levers in the direction ofthe arrow. Hold both ends of the Cleaningunit, and pull it out along the shape of the bot-tom bracket of the Photo conductor unit.

(17) Disconnect 2 connectors from the Stay, andremove the wiring from the clamp. Loosen 2screws of the Stay, and remove the Stay.

Note:Make sure to disconnect the connectors first, thenremove the Stay.

Stopper roller

Boss

ConnectorLocking

tape

Locking

tape

Cleaning unit lock levers

Connector

Clamp

Connectors

Stay

Screw

Screw

Page 12: Installation Manual Bizhub Pro 1050

E-12

(18) Loosen screw ( ) and remove screw ( ) ofthe Sensor cover. Then move one end of theSensor cover away from the Photo conductor.

(19) Pull the Photo conductor straight up.

(20) Apply the setting powder on the surface of thePhoto conductor by a whole round.

(21) Clean the surfaces of the Gamma sensor andthe Maximum density sensor with alcohol anda cotton swab.

(22) Hold both ends of the Photo conductor, andmove it straight down to set it in the Photoconductor unit.

Note:Do not put the Photo conductor on the rib of thePhoto conductor unit.

(23) Reinstall the Sensor cover and secure it withscrews.

Note:Be sure to secure the Sensor cover so as to con-tact the stopper bosses on the Photo conductorunit.

(24) Reinstall the Stay, connect the connector, andfasten the wiring on the clamp.

(25) Charge the 1st Cleaning blade.Note:

The 2nd Cleaning blade is charged at the factory.Push up the Blade unlock arm in the direc-tion of the arrow until it stops.Rotate the Blade charge lever fully in thedirection of the arrow.

Note:Hold the Blade unlock arm pushed up.

Release the Blade unlock arm.Note:

Hold the Blade charge lever at the fully rotatedposition.

Release the Blade charge lever.

Sensor cover

Setting powder

Sensors

Rib

Blade unlock arm

Blade charge lever

Page 13: Installation Manual Bizhub Pro 1050

E-13

(26) Check the warp of the Toner leakage preven-tive guide sheet of the Cleaning unit.

Note:Toner may leak if the guide sheet at the both endsof Cleaning unit is warped slightly toward theToner guide brush. If so, correct the warp (see pro-cedure ).

Correct the warp of the Toner leakage pre-ventive guide sheet to make it parallel withthe Toner guide brush, or to warp slightly(less than 1mm) off the Toner guide brush.

(27) Reinstall the Cleaning unit, connect the con-nector, and attach the wiring to the clamp.

(28) Set the Photo conductor unit to the Main body.

(29) Install the Coupling on the Photo conductorshaft, with the keyway of the Photo conductorshaft meeting the engraving (A) on the Cou-pling. Then insert a Phillips screwdriver in thecross recess in the Coupling and rotate itclockwise one rotation or more until the notchon Coupling (B) is flush with the level of Drumbearing (C).

Note:To prevent blurry copying that results from settingpowder attaching to the Charging corona or theDeveloper scattering prevention sheet, remove theCharging corona and Developing units and turnthe Photo conductor one or more times.

(30) Pull out the Photo conductor unit.

Toner guide brush

Toner leakage preventive

guide sheet

Drum bearing (C)

Coupling

Drum bearing (C)

Notch (B)

Engraving (A)

Notch (B)

Page 14: Installation Manual Bizhub Pro 1050

E-14

(31) Reinstall the Developing unit.Reinstall the Developing unit on the Photoconductor unit in the reverse procedure of(9).Make sure that the Stopper roller contactsthe Stopper plate and cannot rotate.

Note:When installing the Developing unit, make sure tokeep the Developing roller off the front panel of thePhoto conductor unit.(32) Reinstall the Developer suction box.(33) Reinstall the Charging corona unit and con-

nect the connector.Note:

When inserting the connector of the wiring leadingto the charging corona unit, install it in such a wayso that the connector is sandwiched between thetwo clamps [See page E-11 step (15)].(34) Set the Photo conductor unit into the main

body.(35) Install the Coupling on the Photo conductor

shaft, with the keyway of the Photo conductorshaft meeting the engraving (A) on the Cou-pling. Then insert a Phillips screwdriver in thecross recess in the Coupling and rotate itclockwise one rotation or more until the notchon Coupling (B) is flush with the level of Drumbearing (C). [See Step (29).]

(36) Fix the Coupling with a screw.(37) Fix the Toner recycling pipe with a screw to

the original position.(38) Secure the Photo conductor unit with 2

screws.

(39) Close the Toner supply unit, set the bracket ofthe Toner supply unit and secure it withscrews.

Note:Make sure that 3 shutters are returned to theiroriginal positions.

(40) Install the Photo conductor unit cover.(41) Turn the Duplex unit release lever to the lock-

ing position.(42) Close the Front door.

13. Set the Toner bottle.(1) Open the Toner supply door and pull out the

bracket of the Toner supply unit.(2) Hold the Toner bottle vertically, and gently

shake it up and down. Remove the cap. Installthe Toner bottle aligning with the groove withthe tape of the bottle facing up.

(3) Set the Toner supply unit, and close the Tonersupply door.

Stopper plateStopper plate

Stopper rollerStopper roller

Front of

the Photo conductor

Back of

the Photo conductor

Shutters

Shutter

Cap

Tape

Page 15: Installation Manual Bizhub Pro 1050

E-15

14. Execute the automatic adjustments for the Photoconductor.

(1) Turn the Main switch ON.(2) Enter “Blade setting” mode and execute the

automatic blade setting process as follows:

(3) Enter “Auto drum potential adjustment” modeand execute the automatic drum potentialadjustment process.

(4) Enter “Auto maximum density adjustment”mode and execute the automatic adjustmentprocess for maximum density.

(5) Enter “Auto gamma adjustment (1 dot)” modeand execute the automatic gamma adjust-ment process.

15. Non-image area erase check

16. Install the Ventilation duct, aligning the fourgrooves on the back cover (2 screws).

17. Install the Side cover/2.If the PF-701 (paper feeder unit) will not beinstalled, install the Side cover/2 on the rightside instead (truss screw M4x6: 2 pcs.)

Step

1. Turn the Sub switch ON while pressing the[Utility/Counter] button to start the [Servicemode menu].

2. Touch the “02 Process Adjustment” key todisplay sub menus.

3. Touch the “02 Drum Peculiarity Adj.” fromthe sub menus.

4. Touch the “01 Blade Setting Mode” key toopen the [Blade setting mode] screen.

5. Touch the “Start” key.* This process takes about 5 seconds andautomatically stops with a completion mes-sage on the screen.

Step

1. Touch the “Next” key once to open the [Autodrum potential adjustment] screen.

2. Touch the “Start” key.* This process takes about 5 seconds andautomatically stops with a completion mes-sage on the screen.

Step

1. Touch the “Next” key once to open the [Automaximum density adjustment] screen.

2. Touch the “Start” key.*This process takes about 7 seconds andautomatically stops with a completion mes-sage on the screen.

Step

1. Touch the “Next” key three times to open the[Auto gamma adjustment (1 dot)] screen.

2. Touch the “Start” key.* This process takes about 6 seconds andautomatically stops with a completion mes-sage on the screen.

Step

1. Touch the “Return” key twice to return to the[Service mode menu] screen.

2. Touch the “01 Machine Adjustment” key todisplay sub menus.

3. Touch the “06 NonImage Area Erase Check”from the sub menus.

Note: • Fully open the ADF. • Do NOT place anything on the original

glass. • Clean the original glass if dirty.

4. Follow the on-screen instructions and touchthe “Start” key.

5. After the adjustment, if any message otherthan <Operation successful> or <Themachine is set to appropriate parameters forNon-image area erase> is displayed, followthe instructions that accompany the mes-sage.

6. Turn the Sub switch OFF.

Ventilation duct

Screws

Side cover/2

Truss screw M4x6

Page 16: Installation Manual Bizhub Pro 1050

E-16

18. Put the Glass cleaning label on the top of ADF.

19. Use a spanner to extend and adjust the Adjusterfeet to make the Main body level with the floor.

20. If the PF-701 is installed, attach the User’s guideholder in the position shown in the picture.

VI. Copy quality check1. Set paper in the Trays and make sample copies.2. Inspect the copy quality with the test chart fed

from the ADF.Check items: Centering, skew, leading edge

timing, density, etc.Adjustment: Refer to the Service Manual.

Note:If the adjustment data is changed, back up themain body adjustment data to memory using thefollowing procedure.

VII. Various settings1. Enter installation date.

2. Enter service telephone number & fax number.

Glass cleaning label

approx.

10 mm

User’s guide holder

Step

1. Turn the Sub switch ON while pressing the[Utility/Counter] button to start the [Servicemode menu].

2. Touch the “04 Machine Condition” key to dis-play sub menus.

3. Touch the “01 I/O Check Mode” key from themachine condition sub menus.

4. Enter “9” and “1” using the quantity settingbuttons. Make sure that <091-00> appearson the message display.

5. Press the [Start] button.Data backup to memory completed.

Step

1. Turn the Sub switch ON while pressing the[Utility/Counter] button to start the [ServiceMode Menu].

2. Touch the “07 System Setting” key to displaysub menus.

3. Touch the “04 Setting Date Input” from thesystem setting sub menus.

4. On the [Setting date input] screen, use thenumeric keypads to enter the new installa-tion date. The cursor cycles through month,date, and year every time the “Set” key istouched.

5. Make sure to touch the “OK” key.The installation date will be updated to thecurrent setting.

6. Leave the screen with the system settingsub menus. (Do not turn the power switchOFF.)

Step

1. Touch the “02 Telephone Number Setting”key from the system setting sub menus.

2. On the [Customer support TEL/FAX setting]screen, select “Service Center Tel (16).”

3. Use the numeric keypads to enter the tele-phone number (16 digits).

4. Select “Service Center Fax (16).”5. Use the numeric keypads to enter the tele-

phone number (16 digits).6. Make sure to touch the “OK” key.

Page 17: Installation Manual Bizhub Pro 1050

E-17

3. Enter ADF serial number.You can find the 10-digit serial number on the bot-tom when you open the ADF.

4. Set date and time.

VIII. Adjust angles of the control monitor7. Leave the screen with the system setting

sub menus. (Do not turn the power switchOFF.)

Step

1. Touch the “03 M/C Serial Number Setting”key from the system setting sub menus.

2. Touch the “ADF” key to display the Serialnumber entry screen.

3. Enter the serial number of the ADF andtouch the “OK” key. (Use the “Shift” key toswitch between upper case letters and lowercase letters.)

4. Touch the “OK” key on the serial number listscreen.

5. Turn the Sub switch OFF.

Step

1. Turn the Sub switch ON.2. Press the [Utility/Counter] button.3. Touch the “06 Machine Manager Setting”

key.4. Touch the “01 System Setting” key.5. Touch the “02 Time and Date Setting” key.6. [Time and Date Setting] screen

Make sure that the date and time are cor-rect. If not, set the right date and time usingthe numeric keypads on the screen.The cursor cycles through month, date, year,and time every time the “Set” key is touched.

7. Make sure to touch the “OK” key.The date and time will be updated to the cur-rent setting.

8. Turn the Sub switch OFF.

Step

Step

1. Loosen the Adjusting knob and determinethe overall position of the arm.Tighten the adjusting knob to secure it.

2. Loosen the Monitor adjusting knob/2 anddetermine the horizontal position of the mon-itor.Tighten the Monitor adjusting knob/2 tosecure it.

3. Loosen the Monitor adjusting knob/1 anddetermine the vertical position of the moni-tor.Tighten the Monitor adjusting knob/1 tosecure it.

Adjusting knob

Monitor adjusting knob/2

Monitor adjusting knob/1

Page 18: Installation Manual Bizhub Pro 1050

E-18

IX. Network connection and setup1. Connect the network cable.

There are two kinds of network functions: on theMain body side (Machine NIC) and Printer con-troller side (Controller NIC), and there are twoconnector slots (RJ-45).Depending on the user’s purpose, connect thenetwork cable to either or both slots. (See thetable below for functions of NIC.)

Note: • It is hard to remove the cable from the Printer

controller cable slot once it is attached. • Use category 5 or 5E network cables.

[LED]Both the Controller NIC (outside) and the MachineNIC (inside) have two LEDs (LED1 and LED2),each of which represent the following conditions.

LED 1 (top): It turns on if connected to the LINKnetwork.LED 2 (bottom): It flashes depending on thecommunication condition of the ACT network.

2. IP address allocationNote: • Usually a dedicated administrator handles the

network and PC environment at the user end.When conducting the following setup proce-dure, always consult with proper personnel, getapproval, and operate under that person’ssupervision.

• The Controller NIC has the DHCP function,however the initial setting is OFF, so make sureto implement network settings.

3. Print a test copy to check operation[Conduct this procedure when using the Control-ler NIC.]The following three test prints (reports) can beprinted.

• Configuration Page Print (including networkinformation)

• PCL Demo Page Print • PCL Font ListNote:

PS Demo Page Print and PS Font List are avail-able if the PostScript Kit is installed.

Function Machine NIC Controller NIC

Extension for maintenance (Internet ISW, etc.)

O

Main body side scanner function O

Controller side scanner function O

Printer function O

Machine NIC

(RJ-45)

Controller NIC

(RJ-45)

Step

1. Press the [Utility/Counter] button.2. Touch the “06 Machine Manager Setting”

key.3. Touch the “04 Network Setting” key.4. Machine NIC setting

1. Touch the “01 Machine NIC Setting”key to set the following items. Aftersettings are done, touch the “OK”key.

• IP Address (IP address of the Mainbody)

• Subnet Mask (subnet mask for thenetwork)

• Gateway Address (IP address of thedefault gateway)

Controller NIC setting1. Touch the “02 Controller NIC Setting”

key.2. Touch the “01 TCP/IP” key to set the

following items. After settings aredone, touch the “OK” key.

• IP Address (IP address of the con-troller)

• Subnet Mask (Subnet Mask for thenetwork)

• Default Gateway (IP address of thedefault gateway)

5. After the settings are done, be sure to turnthe sub switch and the main switch OFF firstand then turn them ON. (Otherwise the set-tings will not be registered. When turning themain switch and the sub switch ON, wait formore than 10 seconds after turning themOFF before turning them back ON.)

Step

1. Turn the Main and Sub switches ON.2. Touch the “MACHINE” key.3. Touch the “Controller” key.4. Touch the “01 Report Type” key.5. Select the type of report.6. Touch the “Execute” key.

Page 19: Installation Manual Bizhub Pro 1050

E-19

4. Ping to check network connection[Conduct this procedure when using the Control-ler NIC.]

X. Checking the ROM version with thesecurity function

XI. CS Remote CareSee the Service Manual for setup.

XII. ADF angle adjustmentThe opening angle of the ADF can be set at 70 or 32degrees. Set the angle according to the customer’srequest.Default setting at installation: 70 degrees1. Remove the angle adjustment plate on the rear of

the ADF (2 screws). Then, turn it upside down.Replace it and tighten the screws.If you set the angle to 32 degrees, make sure thatthe engraving “32” should be readable correctly.

2. Perform the same procedures for the other plate.

Step

1. Press the [Utility/Counter] button.2. Touch the “06 Machine Manager Setting”

key.3. Touch the “04 Network Setting” key.4. Touch the “02 Controller NIC Setting” key.5. Touch the “01 TCP/IP” key, and touch the

“Next” key five times. On the displayedscreen, touch the “Network Test PingAddress” key.

6. [Ping Send Address Setting] screenEnter a valid address, and touch the “OK”key.

7. Touch the “Send” key.8. Check the message.

If OK, <Normal end> will appear. If there is a problem, <Error> will appear.=> Check if the address is correct and

the network is connected. Resendagain and make sure that the proce-dure completes successfully.

9. Turn the Sub switch OFF.

Step

1. Turn the Sub switch ON while pressing the[Utility/Counter] button to start the [Servicemode menu].

2. Touch the “08 ROM Version” key to displaysub menus.

3. Touch the “01 ROM Version” from the submenus.

4. Check if ROM versions are the ones with thesecurity function.[Image control I1: 11-0000 and up][IP control P1: 10-0000 and up]

Screws