INSTALLATION INSTRUCTIONS FOR THE BV10-100/1000 This document describes the basic steps for installing your BV10-100 or BV10-1000. For detailed information about the BV10-100/1000, see the Ethernet Performance Endpoints BV10-100 and BV10-1000 User Guide. In this document This document contains the following sections: Section Page Front Panel Description 2 Installing the Units in a Rack 3 Connecting the Power 4 Connecting the Test Interface Ports 8 Connecting the Management Interfaces 11

Transcript of INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for...

Page 1: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

INSTALLATION INSTRUCTIONSFOR THE BV10-100/1000

This document describes the basic steps for installing your BV10-100 or BV10-1000. For detailed information about the BV10-100/1000, see the Ethernet Performance Endpoints BV10-100 and BV10-1000 User Guide.

In this document This document contains the following sections:

Section Page

Front Panel Description 2Installing the Units in a Rack 3Connecting the Power 4Connecting the Test Interface Ports 8Connecting the Management Interfaces 11

Page 2: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

2 Installation Instructions for the BV10-100/1000

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Front Panel DescriptionThe following figures show the locations of all connectors, ports, and LEDs available on the front panel of the BV10-100 and BV10-1000 units.

BV10-1000 version

BV10-1000 version

Console port

Test port LAN port Power LED

Status LED

SpeedLED

Link/ActivityLED

Test port LEDs

SpeedLED

Link/ActivityLED

LAN port LEDs

Test port LAN port

Console port

Status LED

Power LED

SpeedLED

Link/ActivityLED

Electrical Test port LEDs

SpeedLED

Link/ActivityLED

LAN port LEDs

OpticalTest port

Laser LEDLink/Activity LED

Optical Test port LEDs

Page 3: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

I n s t a l l a t i o n I n s t r u c t i o n s f o r t h e B V 1 0 - 1 0 0 / 1 0 0 0 3

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Installing the Units in a RackThe BV10-100/1000 can be mounted in a rack using the rack mount accessory kit (ordered separately). The accessory kit shelf holds up to four BV10-100/1000s.

To install the BV10-100/1000 in a rack:1 Attach the brackets of the supplied shelf unit to your rack using the

supplied screws.

2 If cables have been attached to the BV10-100/1000, disconnect all of them as well as the ground lug from the unit.

3 Slide the unit into the desired slot from front to back.

4 With the unit completely inserted into the slot, tighten the thumb screw at the back of the unit.

5 Connect all cables and the ground lug, as explained in the next sections.

Thumb screw

Page 4: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

4 Installation Instructions for the BV10-100/1000

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the PowerThe BV10-100/1000 is available with either an external brick AC power supply or an integrated DC power supply. Both AC and DC units are shipped with a grounding lug and hardware attached.The external brick AC power supply receives AC power through an IEC C14 power cord and delivers it to the BV10-100/1000 through a DC barrel type coaxial power connector. Acceptable AC input is 100-240VAC / %; 50-60Hz. Typical output voltage of the external brick AC power supply to the BV10-100/1000 is 9V DC.As soon as the BV10-100/1000 is connected to a live power supply, the POWER LED turns on. (If the POWER LED does not turn on, there is a power failure at the source or the unit is damaged.) The STATUS LED indicates whether or not the unit is ready for use. If the STATUS LED is not on, the unit is booting up. If it is green, red, or orange, the unit has booted.

Grounding the BV10-100/1000The BV10-100/1000 is shipped with a ground lug and hardware attached to the back of the unit. The grounding hardware consists of a washer with external teeth facing the unit and a locking nut. You will need to supply a #6 AWG wire.

10±

WARNINGThe BV10-100/1000 DC version is intended to be grounded. Ensure that the unit is connected to earth ground during normal use.

Page 5: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

I n s t a l l a t i o n I n s t r u c t i o n s f o r t h e B V 1 0 - 1 0 0 / 1 0 0 0 5

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Ground lug – AC unit

Ground lug – DC unit

How to ground the BV10-100/1000

To ground the BV10-100/1000:1 Loosen the locking nut on the grounding lug.2 Using a #6 AWG wire, twist the wire around the lug so that it is

touching the flat surface of the washer. The wire must be twisted between the washer and the locking nut.

3 Tighten the locking nut.4 Connect the other end of the wire to the ground distribution network.

Connecting the BV10-100/1000 to an AC Power SourceThis section explains how to connect power to a BV10-100/1000 equipped with AC power.

How to connect an AC unit

To connect the BV10-100/1000 to an AC power source:1 Connect the supplied AC power cord to the BV10-100/1000 side panel

through an IEC C14 connector.2 Connect the other end of the power supply to the DC barrel-type

coaxial power connector on the BV10-100/1000.

Ground lug and hardware

Ground lug and hardware

Page 6: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

6 Installation Instructions for the BV10-100/1000

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the BV10-100/1000 to a DC Power SourceThis section explains how to connect power to a BV10-100/1000 equipped with DC power. The unit is equipped with either +24V DC or -48V DC.

How to connect a DC unit

To connect the BV10-100/1000 to a DC power source:1 Using 14-16 AWG copper insulated wires and the supplied connector,

insert the two stripped wires into the connector and tighten the screws firmly. Be sure to respect the polarity. The positive supply wire lead (40-72V for a -48V unit or 20-32V for a +24V unit) must be on the right side of the lug and the negative supply wire on the left side. The following figures show the -48V and +24V DC units.-48V DC Unit:

WARNINGPowering a BV10-100/1000 +24V DC unit with a -48V power source will permanently damage the unit. The +24V input range is 20-32V.

WARNINGPowering a BV10-100/1000 -48V DC unit with a +24V power source will permanently damage the unit. The -48V input range is 40-72V.

Supplied connector Negative (-) supply wire lead on the leftPositive (+) supply wire lead on the right

Page 7: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

I n s t a l l a t i o n I n s t r u c t i o n s f o r t h e B V 1 0 - 1 0 0 / 1 0 0 0 7

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

+24V DC Unit:

2 Connect the plug to one of the two DC input connectors on the BV10-100/1000 unit and tighten the screws firmly.

3 Connect the other end of the wires to the DC power source.

4 To add a redundant DC power source on the BV10-100/1000, repeat step 1 through step 3.

Supplied connector Negative (-) supply wire lead on the leftPositive (+) supply wire lead on the right

CAUTIONThe DC input feeds to the equipment must be protected by 20A rated maximum breaker provided as part of the building installation.

Page 8: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

8 Installation Instructions for the BV10-100/1000

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the Test Interface PortsThe BV10-100 provides an electrical 10/100Mbps Ethernet Test interface. The BV10-1000 provides an electrical 10/100/1000Mbps Ethernet Test interface and an optical SFP laser Ethernet Test interface. The two BV10-1000 Test interfaces are mutually exclusive.

Management through the Test port

The BV10-100/1000 can be managed in-band through the Test port. In-band management is provided for key tasks, such as basic configuration and software upgrades, in situations where the Management port is not accessible. It is important to note that in-band management through the Test port should be performed with low traffic volume so that management responses have minimal impact on test traffic. With high traffic volume, management responses might add jitter/latencey or dropped packets to results. The console in-band enable|disable command controls in-band management on the Test port. By default, in-band management on the Test port is enabled.The following test activities are automatically disabled during software upgrade on the Test port:• Smart Loopback • TWAMP Light Responder• UDP Echo Responder• Ethernet OAM HandlingState and configuration settings are preserved and restored when the software upgrade is complete and the BV10-100/1000 is rebooted.

Page 9: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

I n s t a l l a t i o n I n s t r u c t i o n s f o r t h e B V 1 0 - 1 0 0 / 1 0 0 0 9

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the Electrical 10/100/1000Mbps Ethernet Test Interface

The BV10-100/1000 has one electrical RJ-45 port for 10Base-T, 100Base-TX, and 1000Base-T testing capability. Note: 1000Base-T is available on the BV10-1000 only.

BV10-100

BV10-1000

How to connect the electrical test interface

To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbps electrical signal to the BV10-100/1000 10/100/1000Mbps port using a CAT 5 or better unshielded twisted pair (UTP) cable with an RJ-45 connector.

Electrical 10/100Mbps

Electrical 10/100/1000Mbps

Page 10: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

10 Installation Instructions for the BV10-100/1000

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the Optical SFP 1000Mbps Ethernet Test Interfaces

The BV10-1000 provides an optional optical port for 1000Base-SX/LX/ZX testing capability. The optical port is a Small Form Factor Pluggable (SFP) slot type that uses an LC connector.

How to connect the optical test interface

To use the 1000Mbps optical interface for testing or management:1 Insert one of the following SFP modules into the optical slot.

2 Carefully connect the optical fiber cables to the SFP IN and OUT ports.To ensure good signal quality, make sure that the optical fiber connector is fully inserted into the optical connector port.

Note: To ensure that the maximum receiver power level is not exceeded, an attenuator must be used.

CAUTIONTo ensure that the maximum receiver level is not exceeded, an attenuator might be needed.

Optical SFP 1000Mps

Rate Description

1000Base-X 850nm SFP module for 1000Base-SX short wavelength laser connection

1000Base-X 1300nm SFP module for 1000Base-LX long wavelength laser connection

1000Base-X 1550nm SFP module for 1000Base-ZX extended wavelength laser connection

Page 11: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

I n s t a l l a t i o n I n s t r u c t i o n s f o r t h e B V 1 0 - 1 0 0 / 1 0 0 0 11

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the Management InterfacesYou can connect the Management interface either locally using the Console port or remotely using the LAN port.

Connecting the Console PortConnecting a PC to the Console port, a standard RS-232 DE-9F DCE connection (commonly known as DB-9), provides local access to the BV10-100/1000 user interface. The connection configuration is 9600bps, 8 data bits, no parity, 1 stop bit (9600/8-N-1).The Console port is always enabled for CLI use.

BV10-100 Console port

BV10-1000 Console port

How to connect the Console port

To connect locally to the BV10-100/1000 using the Console port, connect a PC to the Console port using an RS-232 straight cable with a DB-9 connector.

Console port

Console port

Page 12: INSTALLATION INSTRUCTIONS FOR THE BV10 …...To use the 10/100/1000Mbps electrical interface for testing or management, connect the 10/100/1000Mbp s electrical signal to the BV10-100/1000

12 Installation Instructions for the BV10-100/1000

Copyright © 2011 EXFO, Inc. Part # 1060721, Version 2.1.0

Connecting the Ethernet LAN PortConnecting a typical management network to the 10/100Mbps Ethernet LAN port provides remote access to the BV10-100/1000 command line interface (CLI). Either Telnet or SSH can be used and must be enabled. To connect to the LAN port using Telnet or SSH, the IP address must be known. The default address for the LAN port is IP address: 10.10.10.10Netmask: 255.255.0.0

BV10-100 LAN port

BV10-1000 LAN port

How to connect the LAN port

To connect remotely to the BV10-100/1000 using the LAN port, connect both the BV10-100/1000 LAN port and the remote PC to the same Management network using a standard straight through Ethernet cable with an RJ-45 connector.