Proposed Fourth Lane Widening From Shah Alam Interchange To Rawang /Jalan Duta Toll Plaza and Nilai To SerembanSAFETY MANAGEMENT SYSTEM

Page 1 of 3

PROPEL BERHADHazard Identification, Risk Assessment and Risk Control

HIRARC FORM NUMBER: FLW/GEN/10/2012/03

Company :PROPEL-FLWConducted by :

Process/Location :Installation and Removal of High Mast for Package A,B,C D,E Major (Rtd) Mohd Salahuddin Yaakob

Approved by :Hassan Samian

Date :18 Sept 2012Review Date :

1. Hazard Identification2. Risk Analysis3. Risk Control

NoWork ActivityHazardWhich can cause/effectExisting Risk ControlLikely hoodSeverityRiskRecommended Control MeasuresPIC

1.Site Preparation Vehicular trafficVehicular traffic rammed onto.Safe work practice from traffic mgt plan. Site preparation to be carried out during lane closer on day time.236(Medium)TMP stage 1 to be adhered.

2.Mobilization of the machineriesSlow moving

Traffic conjunction.To follow MHA heavy machineries permit able 224 (low)To adhere with existing rqmts.

1.Hazard Identification2. Risk Analysis3. Risk Control

NoWork ActivityHazardWhich can cause/effectExisting Risk ControlLikelyhoodSeverityRiskRecommended Control Measures PIC

period.

3.Installation of machineries on siteTo be parked on emergency lane. Danger towards vehicular traffic. Vehicular traffic rammed ontoMachineries parking area to be protected with TMP . 236(medium)Emergency lane and slow lane to be closed.

4.Assembly of the column using mobile crane and sky lift-Vehicular Traffic - Mech. hazards-Vehicular traffic rammed onto.- material dropped

Machineries parking area to be protected with TMP and temporary live lane closure.236(medium) To inspect the validity of PMA

5.Cable routesElectrical hazard.-Damage to properties- electrusion To follow adequate method statement236(medium)-Pegged according to drawing.

1.Hazard Identification2. Risk Analysis3. Risk Control

NoWork ActivityHazardWhich can cause/effectExisting Risk ControlLikelyhoodSeverityRiskRecommended Control MeasuresPIC

Apply log out /tag out.

6.Removal of existing high mast assist by crane- Electrical Hazard.-Mech. hazard -Electrusion- material dropped-Work permit to be obtain prior work commences.-tool box236 (medium) Apply log out /tag out.

7.Site clearing-Manual handling.- Truck / transporter to be parked at EL-Muscular pain - Traffic accident- to minimize manual handling.- EL closer to adhere with TMP.144(low)