    Checklist de Instalacin y Comisionamiento BTS-Node B

    INFORMACIN DEL SITIO

    NOMBRE

    SITE ID

    CLUSTER

    DIRECCIN

    CIUDAD

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    2/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page2 , Total 21

    INFORMACIN GENERAL DE BTS-NODO B DISTRIBUIDO

    TIPO DE SITIOInterior Exterior Otro

    Tipo de torre o similar

    TorreAutosoportada

    Torre ventada Monopolo Mstil Otro

    GABINETES Y EQUIPOS INSTALADOS

    Equipos CantidadBASE BAND UNIT (BBU3900)

    APM30H

    IBSS200D

    TP 48200A

    RADIO REMOTE UNIT (RRU3936)

    DESCRIPCIN DE RRU INSTALADAS

    NRRU Mstil Pared Torre Otro

    RRU0RRU1

    RRU2

    RRU3

    RRU4

    RRU5

    INSTALACI N DE BBUGabinete interior Otro

    BANDA 1900 MHz. 850 MHz.

    Sectores 2G

    Sectores 3G

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    3/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page3 , Total 21

    CAPTULO IPROTOCOLO DE INSTALACIN DE HARDWARE

    1. INSPECCIN DE INSTALACIN

    1.1 El equipo se encuentra fsicamentecompleto y sin daos. NO SI N/A

    1.2 Verificar que los soportes de metal delequipo no estn oxidados. NO SI N/A

    1.3Los equipos estn instalados de acuerdo alTSS y/o recomendaciones del cliente.

    NO SI N/A

    1.4

    Los equipos estn correctamente alineadosy fijos en sus soportes, con el fin de evitarinterferencias con otra infraestructuraexistente.

    RRU 0 NO SI N/A

    RRU 1 NO SI N/A

    RRU 2 NO SI N/A

    RRU 3 NO SI N/A

    RRU 4 NO SI N/A

    RRU 5 NO SI N/A

    BBU NO SI N/A

    APM NO SI N/A

    1.5La RRU se encuentra con sus soportes enuna posicin adecuada que facilite elacceso para mantenimiento.

    RRU 0 NO SI N/A

    RRU 1 NO SI N/A

    RRU 2 NO SI N/A

    RRU 3 NO SI N/A

    RRU 4 NO SI N/A

    RRU 5 NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    4/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page4 , Total 21

    1.6El cable de energa de -48VDC de la RRUest protegido con cinta aislante yproteccin a prueba de agua (lado RRU), yest correctamente aterrado.

    RRU 0 NO SI N/A

    RRU 1 NO SI N/A

    RRU 2 NO SI N/A

    RRU 3 NO SI N/A

    RRU 4 NO SI N/A

    RRU 5 NO SI N/A

    1.7Las fibras de la BBU hacia las RRU estninstaladas en los sectorescorrespondientes.

    CORRESPONDENCIA EN 2G

    SECTOR 1:

    1. Retirar F.O del lado de la RRU0 (TX RXCPRI0) y corroborar en la GTMU que elled del sector1 TX0 RX0 se apague.

    2. Apagar el breaker de la RRU0 ycorroborar en la GTMU que el led delsector1 se apague.

    Seguir con el mismo procedimiento para laRRU3 (sector4)

    RRU 0 NO SI N/A

    RRU 3 NO SI N/A

    SECTOR 2:1. Retirar F.O del lado de la RRU1 (TX RX

    CPRI0) y corroborar en la GTMU que elled del sector2 TX1 RX1 se apague.

    2. Apagar el breaker de la RRU1 ycorroborar en la GTMU que el led delsector2 se apague.

    Seguir con el mismo procedimiento para laRRU4 (sector5)

    RRU 1 NO SI N/A

    RRU 4 NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    5/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page5 , Total 21

    SECTOR 3:

    1. Retirar F.O del lado de la RRU2 (TX RXCPRI0) y corroborar en la GTMU que el

    led del sector2 TX2 RX2 se apague.2. Apagar el breaker de la RRU2 y

    corroborar en la GTMU que el led delsector3 se apague.

    Seguir con el mismo procedimiento para laRRU5 (sector5)

    RRU 2 NO SI N/A

    RRU 5 NO SI N/A

    CORRESPONDENCIA EN 3G

    CELDA 1:

    1. Retirar F.O del lado de la RRU0 (TX RXCPRI0) y corroborar en la WBBP que elled de la celda1 TX RX CPRI0 sealarme.

    2. Apagar el breaker de la RRU0 ycorroborar en la WBBP que el led de lacelda1 TX RX CPRI0 se alarme.

    Seguir con el mismo procedimiento para laRRU3 (sector4)

    RRU 0 NO SI N/A

    RRU 3 NO SI N/A

    CELDA 2:

    1. Retirar F.O del lado de la RRU1 (TX RXCPRI0) y corroborar en la WBBP que elled de la celda2 TX RX CPRI1 sealarme.

    2. Apagar el breaker de la RRU1 ycorroborar en la WBBP que el led de lacelda2 TX RX CPRI1 se alarme.

    Seguir con el mismo procedimiento para laRRU4 (sector5)

    RRU 1 NO SI N/A

    RRU 4 NO SI N/A

    CELDA 3:

    1. Retirar F.O del lado de la RRU2 (TX RXCPRI0) y corroborar en la WBBP que elled de la celda3 TX RX CPRI2 seapague.

    2. Apagar el breaker de la RRU2 ycorroborar en la WBBP que el led de lacelda3 TX RX CPRI2 se apague.

    Seguir con el mismo procedimiento para laRRU5 (sector6)

    RRU 2 NO SI N/ARRU 5 NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    6/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page6 , Total 21

    1.8El cable de tierra est instalado con losterminales de forma correcta y grasaconductiva aplicada.

    RRU 0 NO SI N/A

    RRU 1 NO SI N/A

    RRU 2 NO SI N/A

    RRU 3 NO SI N/A

    RRU 4 NO SI N/A

    RRU 5 NO SI N/A

    BBU NO SI N/A

    APM NO SI N/A

    1.9El radio de curvatura de los cables RFcumple con las especificaciones del

    fabricante (mnimo: 125 mm).

    NO SI N/A

    1.10El radio de curvatura de las fibras pticascumplen con las especificaciones delfabricante (mnimo: 40 mm).

    NO SI N/A

    1.11Las fibras pticas y los cables DC de laRRU estn correctamente fijados en surecorrido vertical.

    NO SI N/A

    1.12

    Las fibras pticas y los cables -48 VDCestn protegidos con tubo corrugado aprueba de agua en las instalaciones

    exteriores horizontales.

    NO SI N/A

    1.13 El conector RF-DIN 7/16 est protegido concinta aislante y cinta a prueba de agua. NO SI N/A

    1.14 Los conectores E1 estn correctamenteinstalados. NO SI N/A

    1.15 Las etiquetas estn correctamente

    colocadas en los siguientes equipos.

    BBU:

    Power-BBU NO SI N/A

    CPRI-BBU NO SI N/A

    ALARM NO SI N/A

    RRU:

    CPRI-RRU NO SI N/A

    Power-RRU NO SI N/A

    TX/RX-RRU NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    7/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page7 , Total 21

    RX-RRU NO SI N/A

    GND NO SI N/A

    CABLES DE TRANSMISIN:ETH (del BBU) NO SI N/A

    1.16 El tubo corrugado est correctamentesujeto en la escalerilla, pared, piso, etc. NO SI N/A

    1.17Verificar que el camino de salida del tubocorrugado no est colgandoinadecuadamente.

    NO SI N/A

    1.19 Sellado de todos los puntos de acceso delAPM. NO SI N/A

    1.20Sellado de las salidas de los tuboscorrugados.

    NO SI N/A

    1.21 Verificar que el sitio est limpio. NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    8/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page8 , Total 21

    CAPITULO II

    PROTOCOLO DE PRUEBAS DE COMISIONAMIENTO

    IMPORTANTE: Obtener un Log o archivo de registro por cada prueba (cuandoaplique) y adjuntar a este documento.

    2.1. PRUEBA DE COMUNICACIN LOCAL (MODO LMT LOCAL VS. BTS-NODO B)

    Esta prueba verificar la disponibilidad del puerto Ethernet y el modo local de comunicacin entre la BTS-NodoB y el usuario. Este es un software de Huawei que no requiere ninguna licencia de instalacin.

    PRUEBA DIRECCIN IP ASIGNADA

    LMT BTS-NODO B 17.21.2.15PUERTO ETHERNET DEL USUARIO 17.21.2.16/24 (255.255.255.0)

    Ejecutar el siguiente comando en MS-DOS (o lnea de comandos (cmd)): C:\>ping17.21.2.15

    El sistema deber mostrar el siguiente mensaje: Reply from17.21.2.15: bytes=32 time

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    9/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page9 , Total 21

    >DSP BRDMFRINFO:;

    Hardware Comando MML Numero de Serie

    BBU 0 (UMPT) DSP BRDMFRINFO:CN=0,SRN=0,SN=7;

    BBU 0 (WBBP) DSP BRDMFRINFO:CN=0,SRN=0,SN=3;

    RRU 0 DSP BRDMFRINFO:CN=0,SRN=60,SN=0;

    RRU 1 DSP BRDMFRINFO:CN=0,SRN=61,SN=0;

    RRU 2 DSP BRDMFRINFO:CN=0,SRN=62,SN=0;

    RRU 3 DSP BRDMFRINFO:CN=0,SRN=63,SN=0;

    RRU 4 DSP BRDMFRINFO:CN=0,SRN=64,SN=0;

    RRU 5 DSP BRDMFRINFO:CN=0,SRN=65,SN=0;

    Nota: El nmero de serie tiene 20 dgitos.

    2.2.2. Ejecutar el siguiente comando en el LMT para visualizar la versin de software delNodo B.

    >LST VER:; /DSP BTSVER:IDTYPE=BYNAME,BTSNAME="XXX";

    Software Comando MML Version

    EQUIPMENT SOFTWAREVER UMTS

    LST VER:;

    EQUIPMENT SOFTWARE

    VER GSM

    DSP

    BTSVER:IDTYPE=BYNAME,BTSNAME="XXX";

    2.2.3. Ejecutar el siguiente comando en el LMT para visualizar la versin dehardware y software de la tarjeta.

    >DSP BTSVER:IDTYPE=BYNAME,BTSNAME="XXX"; (Only GSM)> DSP BRDVER:;

    Hardware Comando MML VersionBBU 0 (UMPT) DSP BRDVER:CN=0,SRN=0,SN=7;BBU 0 (WBBP) DSP BRDVER:CN=0,SRN=0,SN=3;

    RRU 0 DSP BRDVER:CN=0,SRN=60,SN=0;RRU 1 DSP BRDVER:CN=0,SRN=61,SN=0;RRU 2 DSP BRDVER:CN=0,SRN=62,SN=0;RRU 3 DSP BRDVER:CN=0,SRN=63,SN=0;RRU 4 DSP BRDVER:CN=0,SRN=64,SN=0;RRU 5 DSP BRDVER:CN=0,SRN=65,SN=0;

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    10/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page10 , Total 21

    2.2.4. Checklist de comisionamiento de hardware.

    ESTADO DE LA TARJETA RESULTADO ESPERADO RESULTADO

    2.2.4.1

    Verifica el estado de la tarjeta WBBPDSP BRD:CN=0,SRN=0,SN=3;

    Availability StatusNormal,Operational State Enabled. NO SI N/A

    2.2.4.2Verifica el estado de la tarjeta UMPTDSP BRD:CN=0,SRN=0,SN=7;

    Availability StatusNormal,Operational State Enabled.

    NO SI N/A

    2.2.4.3Verifica el estado de la tarjetaGTMU (nicamente para GSM)DSP BRD:CN=0,SRN=0,SN=6;

    Availability StatusNormal,Operational State Enabled.

    NO SI N/A

    2.2.4.4Verifica el estado del mdulo ptico,en la tarjeta WBBP

    DSP

    CPRIPORT:CN=0,SRN=0,SN=3,OPTN=0;

    Install Status In Position,CPRI Port Mode Master.

    NO SI N/A

    2.2.4.5Verifica el estado del mdulo ptico,en la RRU

    DSPCPRIPORT:CN=0,SRN=60,SN=0,OPTN=0;

    Install Status In Position,

    CPRI Port Mode Slave.NO SI N/A

    2.2.4.6 Verificar la temperatura interna(APM30H) LST TCU:;

    TCU Temperature range: -20C

    to +68C

    NO SI N/A

    2.2.4.7 Verifica la temperatura en la MRRUDSP BRDTEMP:CN=0,SRN=X;RRU Temperature range: -40Cto +55C

    NO SI N/A

    2.2.4.8Verifica que la topologa fsica deleNodeB funcione normalmente.

    DSP BRD:;

    Availability Status Normal

    Alarm Status NormalNO SI N/A

    2.2.4.9Verifica el uso de CPUDSPCPUUSAGE:CN=0,SRN=0,SN=7;

    Normal Value of CPU/DSPUsage(%)< 75%

    NO SI N/A

    2.2.4.10

    Verifica la informacin del sistemade potencia (APM30H)DSP PMU:CN=0;

    Input DC Voltage range: -45Vto +58V

    AC Voltage range: 180V to 280V

    NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    11/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page11 , Total 21

    2.2.4.12Verifica que la topologa fsica de laRRU funcione correctamente.

    Muestra el estado actual de latopologa fsica del nodo B.

    NO SI N/A

    2.2.4.13

    Verificar que la prueba monitoreoespecfico en tiempo real funcione

    correctamente.Maintenance>RealtimeSpecificMonitoring>TemperatureMonitoring

    Ejecutar la prueba de

    temperature en tiempo real. Latemperature debe ser mostradaen modo lista y modo grfico enel tiempo especificado.

    NO SI N/A

    2.2.4.14

    Verificar que la prueba deadministracin de softwarefunciona. Descargar laconfiguracin de data del nodoB.

    La carga de la configuracin delnodo B es satisfactoria.

    NO SI N/A

    2.2.4.15

    Verificar que el led de alarmasfuncione correctamente.Bajar breaker de RRUcorrespondiente a sector 1.

    El led CPRI debe cambiar deverde a rojo

    NO SI N/A

    2.2.4.16

    Verificar que la bsqueda de

    alarmas funcione correctamenteBajar breaker de RRUcorrespondiente a sector 1.

    La alarma de CPRI deberaaparecer en tiempo real

    NO SI N/A

    2.3. VERIFICACION DE DOWNTILT Y AZIMUTH

    Esta prueba aplica en el caso que Huawei haya instalado las antenas de RF.

    Se realizarn las mediciones utilizando inclinmetro y brjula

    Margen de error permitido en downtilt no debe exceder +/- 0.5segn planning RF

    Margen de error permitido en azimuth no debe exceder +/- 5segn planning RF

    Banda de 1900 MHz (GSM/UMTS)

    Sector/Antena Downtilt Azimuth Pas la prueba

    Sector1/Antena1 NO SI N/A

    Sector1/Antena2 NO SI N/A

    Sector2/Antena3 NO SI N/A

    Sector2/Antena4 NO SI N/A

    Sector3/Antena5 NO SI N/A

    Sector3/Antena6 NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    12/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page12 , Total 21

    Banda de 850 MHz (GSM/UMTS)

    Sector/Antena Downtilt Azimuth Pas la prueba

    Sector1/

    Ant

    ena1 NO SI N/ASector1/Antena2 NO SI N/A

    Sector2/Antena3 NO SI N/A

    Sector2/Antena4 NO SI N/A

    Sector3/Antena5 NO SI N/A

    Sector3/Antena6 NO SI N/A

    2.4. ALARMAS DEL RECTIFICADOR HUAWEI

    ObjetivoEn caso que la DBS3900 se ubique dentro de un rectificador APM30H o Minishelter se realizar el

    Diagrama de la Red

    Ninguno.

    Pre-Requisitos

    Procedimientos Resultado Esperado Pas la prueba1. Para probar la alarma de puerta abierta.

    como el nombre lo indica, se debe dejarla puerta abierta del rectificador Huawei,durante ese estado, se debe verificar laalarma.

    En el software LMT se debetener activa, la alarmaBURGLAR ALARM, la cualse borrar al cerrar lapuerta.

    NO SI N/A

    2. Para probar la alarma de los mdulosrectificadores, se debe retirar uno de losmdulos (de preferencia el segundo), estosimular la falla de alguno de ellos, lo cualse podr verificar tambin en el gestor LMTde Huawei.

    En el software LMT se tendractiva la siguiente alarmaPOWER MODULE ANDMONITORING MODULE, lacual se borrar al reinsertar elmodulo retirado para laprueba.

    NO SI N/A

    3. Para probar la Falla de AC, se debebajar el breaker AC que alimenta conenerga AC al rectificador en el cual seestn efectuando las pruebas

    En el software LMT setendr activa la siguientealarma MAINS INPUTOUT OF RANGE, la cual seborrar al levantar elbreaker nuevamente

    NO SI N/A

    Observaciones

    NO OLVIDAR DEJAR TODA LA CONFIGURACIN ORIGINAL AL TERMINAR LAS PRUEBAS.

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    13/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page13 , Total 21

    2.5. PRUEBAS DE POTENCIA

    Para realizar la verificacin de Potencia, se debe conectar a la BBU para ejecutar el siguiente comandode verificacin. Luego de eso se debe colocar nuevamente el comando y elegir el ID de cada celda local

    para obtener la informacin de potencia.LST LOCELL:;

    Si el valor de potencia es de 430, quiere decir que la celda est irradiando con una potencia de 20 W.

    Si el valor de potencia es de 460, quiere decir que la celda est irradiando con una potencia de 40 W.

    Modelo RRU RRU Cell IDPotencia Configurada

    (W)Pas la prueba

    RRU3936

    0 NO SI N/A

    1 NO SI N/A

    2 NO SI N/A

    3 NO SI N/A

    4 NO SI N/A

    5 NO SI N/A

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    14/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page14 , Total 21

    NItem DOCUMENTOS ENVIADOS Fecha

    CAPTULO III

    DOCUMENTACIN

    PERSONA A CARGO NOMBRE FIRMA

    TELEFONICA

    HUAWEI

    FECHA DE EJECUCIN VERSIN: 5.3

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    15/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page15 , Total 21

    Lista Pendiente de Instalacin y Comisionamiento

    Este reporte ser preparado con el protocolo de aceptacin para listar todoslos puntos pendientes a resolver.

    Elemento de red: Id Sitio:

    DBS 3900 Single RAN

    NItem Descripcin de la Falla Categora(1, 2 , 3 , 4)Resuelto por

    HUAWEIAceptado porTELEFONICA

    PERSONA A CARGO NOMBRE FIRMA

    TELEFONICA

    HUAWEI

    FECHA DE EJECUCIN VERSIN: 5.3

  • 7/23/2019 Installation and Commissioning Checklist DBS_BTS3900 v5 3

    16/16

    CHECKLIST DE INSTALACIN YCOMISIONAMIENTO BTS-NODO B

    HUAWEI MODELO DBS3900 RED 2G 3G

    Version 5.3 HUAWEI Confidential Page16 , Total 21

    CERTIFICADO DE ACEPTACIN

    Este documento certifica que los equipos fueron inspeccionados de acuerdo al requerimiento interno con la

    lista de reparos de la pgina 20.

    Elemento de red: DBS 3900 Single RAN

    ID Sitio:

    Nombre de Sitio:

    Nmero de PO

    Nombre de Contrato:

    Nmero de Contrato Interno de Huawei

    Comentarios:

    Fecha de puesta en servicio:

    Cliente:

    Telefnica del Per S.A.A.

    Compaa :

    Huawei del Per S.A.C.

    Cooperador a cargo:

    Nombre: Nombre:

    Cargo: Cargo:

    Firma: Firma:

    Lugar & Fecha: Lugar & Fecha: