Install UPS
-
Upload
feryaldian -
Category
Documents
-
view
215 -
download
0
description
Transcript of Install UPS
SURVEY INSTALL UPS
NO AREA KEBUTUHAN UPS ( ah )kabel ( m ) lampu ( set ) conduit pvc (m) box panel (p x l x t )
1 FT 1 20 52 FT 2 8 53 FT 3 10 74 GT 1 8 65 GT 2 10 6
56 29 06 WT 1 15 67 WT 2 20 68 UTILITY 20 59 Control room 10 16
65 33 0
SURVEY INSTALL UPS
NO FOTO KETERANGAN
4120 18 90 0.409091 9.8181824181 18 90 0.409091 9.8181824158 18 126 0.572727 13.745454186 18 108 0.490909 11.781824178 18 108 0.490909 11.78182
93602 18 108 0.490909 11.78182 2095347 18 108 0.490909 11.78182 2101347 18 90 0.409091 9.818182 2101136 18 288 1.309091 31.41818 5
11
PT. KERAMIKA INDONESIA ASSOSIASI Tbk.
Bidding Form
DATEPROJECT TITLE Install UPS for emergency lamp substation FTK DEPARTMENT Engineering MF
BUDGET NO AP NOCOST CENTER NO JR NOCATEGORY MACHINE JOB TYPE IM PM BM
FACILITY, OTHERENVIRONMENT, SAFETY
1 Improvement of working environtment2 Improvement of energy saving3 Improvement of safety workplace4 Ö Improvement of facilitate the work5 Improved to reduce the cost of the unit6 Improvements to increase machine efficiency
6.16.26.36.4
7 Other
No. Item Amount UnitsMaterial Cost Labour Cost
Total@ Rp @ Rp
1. Install UPS - UPS Emerson liebert PSA600-BX 5 unt 0 0Battery UPS Hoppecke 12v 7,2 ah 10 pcs - 0 0
Lampu LED T8 Osram 18 watt 29 pcs - 0 0
Kabel NYYHY 3 x 1.5 mm 56 meter - 0 0
Box panel 500 (p) x 150 (l) x 600 (t) 5 pcs - 0 0
2 Material pembantu 1 lot 0
3 Sub Total 0 0 04 Operation Cost 10% 05 Profit 10% 0
TOTAL 0
PT. KERAMIKA INDONESIA ASSOSIASI Tbk.
Bidding Form
DATEPROJECT TITLE Install UPS for emergency lamp substation WTK DEPARTMENT Engineering MF
BUDGET NO AP NOCOST CENTER NO JR NOCATEGORY MACHINE JOB TYPE IM PM BM
FACILITY, OTHERENVIRONMENT, SAFETY
1 Improvement of working environtment2 Improvement of energy saving3 Improvement of safety workplace4 Ö Improvement of facilitate the work5 Improved to reduce the cost of the unit6 Improvements to increase machine efficiency
6.1 To reduce downtime6.2 To increase productivity6.3 Easier to maintain6.4 To replace the existing deteriorating
7 Other
No. Item Amount UnitsMaterial Cost Labour Cost
Total@ Rp @ Rp
1. Material - UPS Emerson liebert PSA600-BX 4 unt 0 0Battery UPS Hoppecke 12v 7,2 ah 11 pcs - 0 0
Lampu LED T8 Osram 18 watt 33 pcs - 0 0
Kabel NYYHY 3 x 1.5 mm 65 meter - 0 0
Box panel 500 (p) x 150 (l) x 600 (t) 3 pcs - 0 0
Box panel 900 (p) x 150 (l) x 600 (t) 1 pcs - 0 0
2 Material pembantu 1 lot 0
3 Sub Total 0 0 04 Operation Cost 10% 05 Profit 10% 0
TOTAL 0
PT. KERAMIKA INDONESIA ASSOSIASI Tbk.
ESTIMATE PRICE
21-02-2014PROJECT TITLE Install UPS for emergency lamp substation FTK DEPARTMENT Engineering
BUDGET NO AP NOCOST CENTER NO JR NO
CATEGORY MACHINE JOB TYPEFACILITY, OTHERENVIRONMENT, SAFETY
1 Improvement of working environtment2 Improvement of energy saving3 Improvement of safety workplace4 Ö Improvement of facilitate the work5 Improved to reduce the cost of the unit6 Improvements to increase machine efficiency
6.1 To reduce downtime6.2 To increase productivity6.3 Easier to maintain6.4 To replace the existing deteriorating
7 Other
No. Item Amount UnitsMaterial Cost Labour Cost Total
@ Rp @ Rp1. Install UPS
UPS Emerson liebert PSA600-BX 5 unt 850,000 4,250,000 2,000,000 10,000,000 14,250,000 Battery UPS Hoppecke 12v 7,2 ah 10 pcs 150,000 1,500,000 1,500,000 Lampu LED T8 Osram 18 watt 29 pcs 350,000 10,150,000 10,150,000 Kabel NYYHY 3 x 1.5 mm 56 meter 15,000 840,000 840,000 Box panel 500 (p) x 150 (l) x 600 (t) 5 pcs 500,000 2,500,000 2,500,000
- - - - - - -
2 Support Material 1 Lot 2,000,000 2,000,000 2,000,000
3 Sub Total 21,240,000 10,000,000 31,240,000 4 Operation Cost 10 % 3,124,000
34,364,000 5 Profit 10% 3,436,400
TOTAL 37,800,400
Prepare by, Acknowladge by, Approve by
( Edy Istanto ) (Sapphakhoon Phaengsri) (Chaovalit Nieamtad)
PT. KERAMIKA INDONESIA ASSOSIASI Tbk.
ESTIMATE PRICE
21-02-2014PROJECT TITLE Install UPS for emergency lamp substation WTK DEPARTMENT Engineering
BUDGET NO AP NOCOST CENTER NO JR NO
CATEGORY MACHINE JOB TYPEFACILITY, OTHERENVIRONMENT, SAFETY
1 Improvement of working environtment2 Improvement of energy saving3 Improvement of safety workplace4 Ö Improvement of facilitate the work5 Improved to reduce the cost of the unit6 Improvements to increase machine efficiency
6.1 To reduce downtime6.2 To increase productivity6.3 Easier to maintain6.4 To replace the existing deteriorating
7 Other
No. Item Amount UnitsMaterial Cost Labour Cost Total
@ Rp @ Rp1. Material
UPS Emerson liebert PSA600-BX 4 unt 850,000 3,400,000 2,000,000 8,000,000 11,400,000 Battery UPS Hoppecke 12v 7,2 ah 11 pcs 150,000 1,650,000 1,650,000 Lampu LED T8 Osram 18 watt 33 pcs 350,000 11,550,000 11,550,000 Kabel NYYHY 3 x 1.5 mm 65 meter 15,000 975,000 975,000 Box panel 500 (p) x 150 (l) x 600 (t) 3 pcs 500,000 1,500,000 1,500,000 Box panel 900 (p) x 150 (l) x 600 (t) 1 pcs 500,000 500,000 500,000
2 Support Material 1 Lot 4,000,000 4,000,000 4,000,000
3 Sub Total 23,575,000 8,000,000 31,575,000 4 Operation Cost 10 % 3,157,500
34,732,500 5 Profit 10% 3,473,250
TOTAL 38,205,750
Prepare by, Acknowladge by, Approve by
( Edy Istanto ) (Sapphakhoon Phaengsri) (Chaovalit Nieamtad)
CAPEX REQUIREMENTCls
Plant KIA Plant KSM Plant KKMOFFICE Other Krw
TERM OF USED AYEARLY MIDYEAR Gresik
Part / Machine Code .........................................................................................................................................................
SOURCING
DOMESTIC OVERSEAS INTERNAL SCG
KIND OF ASSET
Ready made Asset ( Available Immediately
Asset Under ConstrucIncomplete, Must be install on the other device
Expenditure bud New As Replacement old Asset
Attachment file
Before After
.............................................. .................................................................................................
.............................................. .................................................................................................
.............................................. .................................................................................................
NO Details Unit AmountPrice / Unit Total
1 1 lot ### ###
TOTAL ###
Proposed by : Acknowledged by : Approved by :
________ _________ _________ ________ ________________
Edi Istanto phakhoon ChaovalitHandono W Pramoth Pr
NO.CAPEX : 179035412009 SECTION : Engineering
Name Budget : Install UPS for emergency lamp sub station FTK
Useful Lifetime : 3 year Original Budgeted Amount : 12.700.000 Rp./USD/Bath (other currency)
Planned Schedule starting from month march until month May
Action(Month) : Group asset .............................................. (Insert code. See page 2)
Objective/Other .................................. 04 ........................................... (Insert code. See page 2 )
Install UPS for emergency lamp sub station FTK
√ √√
√
March17230
√√
Part / Machine Code .........................................................................................................................................................
Incomplete, Must be install on the other device
Attachment file
.................................................................................................
.................................................................................................
.................................................................................................
Approved by :
________________
Install UPS for emergency lamp sub station FTK
12.700.000 Rp./USD/Bath (other currency)
until month May
Group asset .............................................. (Insert code. See page 2)
Part / Machine Code .........................................................................................................................................................
CAPEX REQUIREMENTCls
Plant KIA Plant KSM Plant KKMOFFICE Other Krw
TERM OF USED AYEARLY MIDYEAR Gresik
Part / Machine Code .........................................................................................................................................................
SOURCING
DOMESTIC OVERSEAS INTERNAL SCG
KIND OF ASSET
Ready made Asset ( Available Immediately
Asset Under ConstrucIncomplete, Must be install on the other device
Expenditure bud New As Replacement old Asset
Attachment file
Before After
.............................................. .................................................................................................
.............................................. .................................................................................................
.............................................. .................................................................................................
NO Details Unit AmountPrice / Unit Total
1 1 lot ### ###
TOTAL ###
Proposed by : Acknowledged by : Approved by :
________ _________ _________ ________ ________________
Edi Istanto phakhoon ChaovalitHandono W Pramoth Pro
NO.CAPEX :178035412007 SECTION : Engineering
Name Budget : Install UPS for emergency lamp sub station WTK
Useful Lifetime : 3 year Original Budgeted Amount : 18.000.000 Rp./USD/Bath (other currency)Planned Schedule starting from month march until month May
Action(Month) : Group asset .............................................. (Insert code. See page 2)
Objective/Other .................................. 04 ........................................... (Insert code. See page 2 )
Install UPS for emergency lamp sub station WTK
√ √√
√
March17230
√√
√
Part / Machine Code .........................................................................................................................................................
Attachment file
.................................................................................................
.................................................................................................
.................................................................................................
Approved by :
________________
Install UPS for emergency lamp sub station WTK
18.000.000 Rp./USD/Bath (other currency) until month May
Group asset .............................................. (Insert code. See page 2)
CAPEX REQUIREMENT NO.CAPEX ### SECTION : ENGINEERING Cls
Plant KIA Plant KSM Plant KK Office Other Krw
TERM OF USED ASSET YEARLY MIDYEAR Gresik
Name Budget : Install UPS for emergency lamp sub station FTK
Part / Machine Code ……………….
Useful Lifetime : Original Bud 12,700,000 Rp. (other currency)
Planned Schedule starting from month MARCH until STATUS BUDGED
CLOSE CONTINUOUS
SOURCING
DOMESTIC OVERSEAS INTERNAL SCG
KIND OF ASSET
Ready made Asset (RMAAvailable Immediately
Asset Under ConstructioIncomplete, Must be install on the other device
Expenditure budget New A Replacement old Asset
Attachment file
Before After
Electric sub station very dark if problem MDB or electric blank out lighting sub station room can turn on using power UPS
NO Details Unit Amount Price / Unit Total
1 Material 1 Set ### ###
2 Labour cost 1 Job ### ###
3 Others ( Operation Cost + Profi 1 Job ### ###
###
Report About Budget Balance
### 66%ITEMPreview PR. No.Estimation CostPreview PO. No. Final CostCost Budget BalanceRemark
1 ### ### ###
2
Proposed by : Acknowledged by : Approved by :
Action(Month) : MARET - MEI 2014Group asset : 17230 (Insert code. See page 2)
Objective/Other : 04 (Insert code. See page 2
budget 198%
Manager Advisor 1 Advisor 2 Direrctor President Director
CAPEX REQUIREMENT NO.CAPEX ### SECTION : ENGINEERING Cls
Plant KIA Plant KSM Plant KK Office Other Krw
TERM OF USED ASSET YEARLY MIDYEAR Gresik
Name Budget : Install UPS for emergency lamp sub station FTK
Part / Machine Code ……………….
Useful Lifetime : Original Bud 18,000,000 Rp. (other currency)
Planned Schedule starting from month MARCH until STATUS BUDGED
CLOSE CONTINUOUS
SOURCING
DOMESTIC OVERSEAS INTERNAL SCG
KIND OF ASSET
Ready made Asset (RMAAvailable Immediately
Asset Under ConstructioIncomplete, Must be install on the other device
Expenditure budget New A Replacement old Asset
Attachment file
Before After
Electric sub station very dark if problem MDB or electric blank out lighting sub station room can turn on using power UPS
NO Details Unit Amount Price / Unit Total
1 Material 1 Set ### ###
2 Labour cost 1 Job ### ###
3 Others ( Operation Cost + Profi 1 Job ### ###
###
Report About Budget Balance
### 53%ITEMPreview PR. No.Estimation CostPreview PO. No. Final CostCost Budget BalanceRemark
1 ### ### ###
2
Proposed by : Acknowledged by : Approved by :
Action(Month) : MARET - MEI 2014Group asset : 17230 (Insert code. See page 2)
Objective/Other : 04 (Insert code. See page 2
budget 112%
Manager Advisor 1 Advisor 2 Direrctor President Director
Group of assets :Code Eng. Name
17000 Land
17010 Land Improvement
17100 Building and Construction
17110 Building Improvement
17200 Machinery
17210 Factory Equipment
17220 Telephone System
17230 Electricity System
17240 Water System
17250 Gas System
17300 Vehicle
17400 Furniture Fixture
17410 Office Equiprment
17420 Software
Objective :01 Improve environment02 Saving energy 03 Safety04 Improve working area05 Reduce cost06 improved efficiency of machine07 Research and Development08 Training09 Information and Tachnology10 General Administration11 other
Building and Construction
Building Improvement
Improve environment
Saving energy
Safety
Improve working area
Reduce cost
improved efficiency of machine
Research and Development
Training
Information and Tachnology
General Administration
other
CAPEX REQUIREMENT NO.CAPEX SECTION : ENGINEERING Cls
Plant KIA Plant KSM Plant KK Office Other Krw
TERM OF USED ASSET YEARLY MIDYEAR Gresik
Name Budget : Install UPS for emergency lamp sub station FTK
Part / Machine Code ……………….
Useful Lifetime : Original Bud Rp. (other currency)
Planned Schedule starting from month MARCH until STATUS BUDGED
CLOSE CONTINUOUS
SOURCING
DOMESTIC OVERSEAS INTERNAL SCG
KIND OF ASSET
Ready made Asset (RMAAvailable Immediately
Asset Under ConstructioIncomplete, Must be install on the other device
Expenditure budget New A Replacement old Asset
Attachment file
Before After
Electric sub station very dark if problem MDB or electric blank out lighting sub station room can turn on using power UPS
NO Details Unit Amount Price / Unit Total
1 Material 1 Set ### ###
2 Labour cost 1 Job ### ###
3 Others ( Operation Cost + Profi 1 Job ### ###
###
Report About Budget Balance
### ###ITEMPreview PR. No.Estimation CostPreview PO. No. Final CostCost Budget BalanceRemark
1 ### ###
2
Proposed by : Acknowledged by : Approved by :
Action(Month) : MARET - MEI 2014Group asset : 17230 (Insert code. See page 2)
Objective/Other : 04 (Insert code. See page 2
Manager Advisor 1 Advisor 2 Direrctor President Director
CAPEX REQUIREMENT NO.CAPEX SECTION : ENGINEERING Cls
Plant KIA Plant KSM Plant KK Office Other Krw
TERM OF USED ASSET YEARLY MIDYEAR Gresik
Name Budget : Install UPS for emergency lamp sub station FTK
Part / Machine Code ……………….
Useful Lifetime : Original Bud Rp. (other currency)
Planned Schedule starting from month MARCH until STATUS BUDGED
CLOSE CONTINUOUS
SOURCING
DOMESTIC OVERSEAS INTERNAL SCG
KIND OF ASSET
Ready made Asset (RMAAvailable Immediately
Asset Under ConstructioIncomplete, Must be install on the other device
Expenditure budget New A Replacement old Asset
Attachment file
Before After
Electric sub station very dark if problem MDB or electric blank out lighting sub station room can turn on using power UPS
NO Details Unit Amount Price / Unit Total
1 Material 1 Set ### ###
2 Labour cost 1 Job ### ###
3 Others ( Operation Cost + Profi 1 Job ### ###
###
Report About Budget Balance
### ###ITEMPreview PR. No.Estimation CostPreview PO. No. Final CostCost Budget BalanceRemark
1 ### ###
2
Proposed by : Acknowledged by : Approved by :
Action(Month) : MARET - MEI 2014Group asset : 17230 (Insert code. See page 2)
Objective/Other : 04 (Insert code. See page 2
Manager Advisor 1 Advisor 2 Direrctor President Director
390108.3333314.1667 62.8333375.83333 3770.194444