INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO...
-
Upload
tristan-vineyard -
Category
Documents
-
view
224 -
download
0
Transcript of INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO...
![Page 1: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/1.jpg)
INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC
PROJECTS IN THE NORTHEAST
BY: JOSEPH ENRICOENVIRONMENTAL PROTECTION
SPECIALISTNew York Regional Office
![Page 2: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/2.jpg)
New York Regional Office
States include: Maine, New Hampshire, Vermont, Massachusetts, Connecticut, Rhode Island, New York, New Jersey, Pennsylvania,
Maryland and West Virginia
![Page 3: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/3.jpg)
INSPECTION ITEMS OF CONCERN
• Debris• Vandalism• Facilities in operation when required• Facilities in conformance with plans• Function• Damage – bent racks or overlays, broken boards
in ladders, leaks• Evaluation – discuss problems• Enhancements/study results
![Page 4: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/4.jpg)
DOWNSTREAM FACILITIES
• Angled bar racks with narrow spacing• Trashrack screens and overlays• Weir boxes/galleries• Flashboard/gate openings• Tailrace discharge pipes/chutes• Plunge pools• Canal louvers• Acoustic deflection
![Page 5: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/5.jpg)
Angled bar rack and gallery entrance at Kinneytown, 6985-CT
on the Naugatuck River.
Entrance
![Page 6: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/6.jpg)
Angled bar rack and entrance weir at South Berwick, 11163-ME on the
Salmon Falls River.
![Page 7: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/7.jpg)
Trashrack overlay at the Lakeport project, 6440-NH on the Winnepesaukee River.
Trashrack
Overlay
![Page 8: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/8.jpg)
Trashrack overlay and gallery entrances at Chace Mill, 2756-VT on
the Winooski River.
Entrances
![Page 9: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/9.jpg)
Lighted entrance weir at the Pejepscot project, 4784-ME on the
Androscoggin River.
Lighted entrance
![Page 10: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/10.jpg)
Angled rack with discharge chute at Gardners Falls, 2334-MA on the
Deerfield River.
![Page 11: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/11.jpg)
Louver system in power canal, looking upstream, at Holyoke project, 2004-
MA.
![Page 12: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/12.jpg)
Removable flashboard section for fish passage at the Kelleys Falls project, 3025-NH on the Piscataquog River.
![Page 13: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/13.jpg)
Discharge pipe at the Watertown project, 2442-NY on the Black River.
![Page 14: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/14.jpg)
Bypass weir with video feed at the Medway project, 2666-ME, on the W.
Branch of the Penobscot River.
![Page 15: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/15.jpg)
Plunge pool and weir at the Essex No. 19 project, 2513-VT on the Winooski
River.
![Page 16: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/16.jpg)
Plunge pool at base of American Tissue dam, 2809-ME on the
Cobbosseecontee River
![Page 17: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/17.jpg)
Acoustic deflection measures at the intake to the Crescent project, 4678-NY
on the Mohawk River.
![Page 18: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/18.jpg)
UPSTREAM FACILITIES
• Vertical slot ladder/Ice Harbor
• Denil ladder
• Elevator
• Trap and Truck
• Steeppass ladder
• Other – screens/weirs
• Pool and weir/locks
![Page 19: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/19.jpg)
Ice Harbor ladder at the Cabot powerhouse at the Turner Falls project,
1889-MA on the Connecticut River.
![Page 20: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/20.jpg)
Ice Harbor ladder at the spillway of the Lowell project, 2790-MA, on the
Merrimack River.
![Page 21: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/21.jpg)
Ladder at the Glen Park project, 4796-NY on the Black River.
Water level problems
![Page 22: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/22.jpg)
Older Denil ladder at the Great Works Project, 2312-ME on the Penobscot
River.
![Page 23: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/23.jpg)
Denil ladder at the South Berwick project, 11163-ME on the Salmon Falls River.
![Page 24: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/24.jpg)
Alaskan Steeppass ladder at midpoint of main dam at the Milford project, 2534-ME on the Penobscot River.
![Page 25: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/25.jpg)
Upstream elevator facility at the Cataract Project, east channel, 2528-
ME on the Saco River.
![Page 26: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/26.jpg)
Eel passage facility at the Greenville project, 2441-CT on the Shetucket River.
![Page 27: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/27.jpg)
Elevator lifting bucket in progress at the Lawrence Project, 2800-MA on the
Merrimack River.
![Page 28: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/28.jpg)
Elevator discharge into holding pool at the Skelton Project ,2527-ME, on the
Saco River.
![Page 29: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/29.jpg)
Trap and truck operation at the Brunswick project, 2284-ME on the
Androscoggin River.
Transport truck parks here
![Page 30: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/30.jpg)
Tailrace screen at the West Springfield project, 2608-MA on the Westfield
River.
![Page 31: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/31.jpg)
Diversion net at the tailrace of the upper reservoir at the Northfield Mountain PS
project, 2485-MA on the Connecticut River.
![Page 32: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/32.jpg)
Viewing window at the Holyoke Project, 2004-MA.
![Page 33: INSPECTIONS OF FISH PASSAGE FACILITIES AT FERC PROJECTS IN THE NORTHEAST BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST New York Regional Office.](https://reader033.fdocuments.us/reader033/viewer/2022050920/551a18a255034654788b45c9/html5/thumbnails/33.jpg)