5:30 –5:35 p.m. Welcome and Introductions – Deputy Commissioner Jessica Fulton

5:35 – 5:55 p.m. Project Overview – Project Team

5:55 – 6:10 p.m. Next Steps

6:10 – 6:15 p.m. Keeping You Informed

6:15 – 6:30 p.m. Questions and Answers

Pre-construction Community Meeting AgendaDekalb Avenue Safety Improvements November 4, 2021

Page 3: Insert Presentation Title

Insert Presentation Title

Jessica Fulton, ATLDOT Deputy Commissioner, Office of Capital Delivery

Michael Word, Construction Director

Kurt Martin, Construction Manager

Glen Behrend, DWM Construction Manager

Adrian Carver, Construction Outreach Liaison

Brandi Peck, Project Manager, Design

Dekalb Avenue Safety Improvements Team

Page 4: Insert Presentation Title

Insert Presentation Title

PROJECT MAP

Page 5: Insert Presentation Title

Insert Presentation Title

Project Scope

❑ Removal of reversible lane and associated signage

❑ Bicycle infrastructure and striping

❑ Pedestrian improvements include sidewalk repair and ADA

improvements

❑ Traffic signal upgrades

❑ Resurfacing

PROJECT OVERVIEW

Page 6: Insert Presentation Title

Insert Presentation Title

SIDEWALKS & MOBILITYJackson Street to Ridgecrest Road (Typical Section)

Page 7: Insert Presentation Title

Insert Presentation Title

BICYCLE INFRASTRUCTUREHurt Street to Elmira Place

Revisions include:• Two-way cycle track on north side• Addition of bicycle intersection

improvements• Moreland Avenue facilities include bicycle

signalization

Page 8: Insert Presentation Title

Insert Presentation Title

All non-compliant ADA ramps to be brought up to compliance

Damaged sidewalk to be repaired

Missing sidewalk to be installed

Two new pedestrian crossing areas with refuge island and rectangular rapid

flashing beacons to be installed

❑ Ridgecrest Road (Access to Trail)

❑ Degress Avenue (Access to MARTA Stop)

PEDESTRIAN IMPROVEMENTS

Page 9: Insert Presentation Title

Insert Presentation Title

Protected bicycle facilities:

❑ Dekalb Avenue from Hurt Street to Elmira Place

Striped bicycle facilities:

❑ Dekalb Avenue from Clifton Road to Arizona Avenue

❑ Whitefoord Avenue from Dekalb Avenue to LaFrance Street

BICYCLE INFRASTRUCTURE

Page 10: Insert Presentation Title

Insert Presentation Title

Signal upgrades at intersections with:

❑ Krog Street

❑ Moreland Avenue

❑ Oakdale Road/Whitefoord Avenue

❑ Arizona Avenue

❑ Rocky Ford Road

TRAFFIC SIGNAL UPGRADES

Page 11: Insert Presentation Title

Insert Presentation Title

Approximately 3 miles of Decatur Street/Dekalb Avenue from Jackson

Street to City Limits

Restriping

❑ Exclusive left-turn only lanes at all signalized intersections

❑ Center-turn lane throughout the remainder of the corridor

RESURFACING

Page 12: Insert Presentation Title

Insert Presentation Title

Installation of portable message boards

Removal of reversible lane

❑ Pole and overhead signal removal

❑ Temporary striping

❑ Begin traffic signal improvements

Adjusting manhole and water valve

CONSTRUCTION ACTIVITIES

Page 13: Insert Presentation Title

Insert Presentation Title

Concrete sidewalk, curb, gutter, and ADA ramp installation

Signage and pedestrian signal installation

CONSTRUCTION ACTIVITIES

Page 14: Insert Presentation Title

Insert Presentation Title

Asphalt patching

Milling and resurfacing

Lane striping

CONSTRUCTION ACTIVITIES

Page 15: Insert Presentation Title

Insert Presentation Title

Repair/replace stormwater infrastructure and catch basins

❑ Krog Street @ Dekalb Avenue work being performed by Department of

Watershed Management (DWM)

❑ Coordinating construction activities to lessen community impact

❑ Tentative start date – Q1 2022

CONSTRUCTION ACTIVITIES

Page 16: Insert Presentation Title

Insert Presentation Title

DWM Dekalb Avenue/Krog Street Stormwater Project Update

Page 17: Insert Presentation Title

Insert Presentation Title

Temporary, single-lane closures with possible traffic delays

❑ Pole and overhead signal removal

❑ Traffic signal improvement

❑ Bike and Pedestrian facilities (concrete work)

❑ Repair/replace stormwater infrastructure and catch basins

❑ Asphalt patching, milling and resurfacing

❑ Lane striping

POTENTIAL IMPACTS

Page 18: Insert Presentation Title

Insert Presentation Title

Restricted driveway access (24 to 48 hours)

❑ Concrete sidewalk, curb, and gutter installation

❑ Repair/replace stormwater infrastructure and/or catch basins

POTENTIAL IMPACTS

Page 19: Insert Presentation Title

Insert Presentation Title

Portable message boards

Visit: ATLDOT.AtlantaGa.gov

❑ Project fact sheets and presentations posted at:

https://atldot.atlantaga.gov/projects/dekalb-ave-safety-improvements

Project updates:

❑ Send email to: [email protected]

❑ Subject heading “DeKalb Avenue Safety Improvements Project Updates”

❑ Request to receive updates on project referenced in heading

PROJECT STATUS UPDATES AVAILABLE VIA…

Page 20: Insert Presentation Title

Follow us on social media!

@.com/ATLDOT@ATLDOT @ATL.DOT

20

ATLDOTCity of Atlanta Department of Transportation

Page 21: Insert Presentation Title

Insert Presentation Title

QUESTIONS?