Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for...

30
Center for Excellence and Futuristic Development L&T Construction Buildings & Factories Sensitivity: LNT Construction Internal Use Innovative Technologies in Building Projects Developers Perspective

Transcript of Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for...

Page 1: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Innovative Technologies in Building Projects

– Developers Perspective

Page 2: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Government flagship programs

• 100 Smart Cities Mission,

• Housing for All by 2022

• Make in India

• Power for All

Growth Drivers for Construction Business in India

Page 3: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

• Developmental activities in Amaravati, AP.

• Airports: Expansions of Existing Airport Terminals

– HIAL, BIAL, DIAL

• Special projects: Statue of Unity, Chatrapathi

Shivaji Maharaj Memorial Statue, Ambedkar

Statue, etc.,

• Hospitals: Construction of Hospitals & Medical

College campus – AIIMS, Odisha Medical Colleges,

JIPMER, NEIGHRIMS, etc.,

Growth Drivers for L&T Construction in India

Landmark Projects in Construction:

Page 4: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Future of Green Buildings

IGBC Projects:

Green Footprint -640 Crore

Sq.Ft

4700 Registered/Certified Projects

2018

By 20227000

Registered/Certified Projects

Green Building Footprint – 1000

Crore Sq.Ft

@ 100 Crore Sq.Ftevery Year

Page 5: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Green Buildings of L&T

Completed Projects Ongoing Projects

LEED India projects are also included in the LEED List

Page 6: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Building Design Optimization

for Special Projects

Page 7: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Fully shaded area

during December

all over the day.

Shading Analysis

Building Design Optimization – GCA, Motera

The 30yard circle is getting shaded after 6pm during Feb to Sep, and for wintershaded till 9am & after 4.30pm.

Page 8: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Building Design Optimization – Statue of Unity

Zone 1

Zone 2

N

711 Average Lux Level with Overcast sky Condition –

Statue of Unity

24 no’s Skylight

(0.9m radius)

Daylight Analysis

Page 9: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

WW

R O

ptim

izatio

nBuilding Design Optimization

WWR reduced from 66%to 30%

Description Initial Arch design 30% WWR

Glass

WWR 66% 30%

Cooling Load 225 TR 196 TR

Savings Baseline 13%

Sola

r In

sola

tion

Analy

sis

More Glassing advisable

Restrict Glass/Opening

Page 10: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Energy Optimization

Page 11: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Room conditions

26-280C / ≤ 70% & 300 lux

Room conditions

23-260C / ≤ 60% & 300 lux

Building energy index

60 - 90 kWh/m2-yr

Building energy index

140 kWh/m2-yr

Challenges in building design

Room conditions

26-280C / ≤ 70% & 300 lux

Building energy index

30 kWh/m2-yr – From grid

30 kWh/m2-yr – Through

Renewable

Energy Optimization

Page 12: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

See through Type PV Module:

Courtesy:

Buildings that Self Sustain out of Solar Power

Page 13: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Building Integrated Micro-Wind Turbine

The wind turbines could be installed in the

building in the following areas

• on the rooftop;

• between two adjacent buildings;

• inside a hole within a building that is

specially designed for this purpose

Page 14: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Future POWER – Fuel Cells

• A fuel cell is an electrochemical

cell that converts the chemical

energy from a fuel into

electricity.

• The energy efficiency of a fuel

cell is generally between 40–60%

Page 15: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Future Power– Fuel Cells

SOFC for commercial, Sakuya Konohana Kan,Japan SOFC in ORIST by Hitachi Zosen Corporation

Source : http://www.nedo.go.jp

Page 16: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Typical office space

Set Point temperature • Baseline 23 °C

• Option 1: Average DBT

• Option 2: Running mean temperature

Comfort analysis Energy analysis

Cradle

Sc-STREAM

Design

builder

Outputs

Temp

PMV-PPD

Energy

Air flow

21

22

23

24

25

26

27

Basecase Case 1 Case 2 Case 3

Tem

p (°C

)

Climate Responsive Cooling Set Point

Page 17: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Climate Responsive Cooling Set Point

Page 18: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Integrating Outdoor/Indoor Environments

HardscapeEnergy

efficiency

CampusComparative

studyIndoor

LandscapeOutdoor

- Thermal Comfort/Energy Optimization

The research involves study of

different forms of landscaping &

its impact on

• Temperature,

• air flow,

• solar gains

• energy consumption of campus

building.

Page 19: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Integrating Outdoor/Indoor Environments- Thermal Comfort/Energy Optimization

Indoor – Cooling Energy

1.5

3

4.5

6

5 10 15 20

No. of years

Temperature Rise

32.26 41.9425 year periodCooling

energy

EPI

(kWh/m2)

Hardscape

29.70 32.67to

Landscape

Total savings expected in cooling energy over a period

of 25 years is approximately around 22%.

Conservatively 5 ˚C

temperature rise has been

considered for calculating

energy over 25 years.

Page 20: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Air temperature

Air temp

(0C)Case 1 Case 2

Min 36.88 35.36

Max 38.16 37.95

Mean 37.52 36.65

Surrounding the immediate periphery of building surface, air temperatures have drastically

reduced by 1.5˚C to 2.0 ˚C.

X-Y plane cut at Z = 0.75 m, 12:00 pmCase 1 - Hardscape Case 2 – Landscape

Integrating Outdoor/Indoor Environments- Thermal Comfort/Energy Optimization

Page 21: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Electrochromic Glass

Smart glass or switchable glass is a glass or glazing whose light transmission properties arealtered when voltage, light or heat is applied.

• Energy Savings up to 18%.

• Reduction in the space

cooling energy consumption

up to 28%

• EPI Reduction up to 20

kWh/sq.m. for the similar

sized operating building

Page 22: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Smart Buildings

Smart Building -

Productive and cost-

effective environment

achieved through

optimization of

structure, systems,

services and

management

Source: Arup Foresight

Page 23: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Smart Buildings

Internet of Things (IoT)Manage and control temperatures,

ventilation, lighting, access,

parking, room occupancy,

elevators and energy usage in a

building using IoT

Page 24: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Smart Grid Technology in Smart Buildings

- Helps to address the energy challenges &

help to lower world’s energy demand.

- Avoids costly grid infrastructure & balance

out the grid fluctuations

- Interplay between power generation and

energy demand.

Co-existence of various types of renewable and non-renewable generating

technologies, such as coal, hydro, nuclear, solar, biomass, geothermal, etc.

Page 25: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Smart Lighting Solutions

- Task tuning

- Daylight harvesting

- Scheduling to deliver demand-

based lighting optimized for each

zone

- Integrated with occupancy and

daylight based sensors

Smart Lighting – A Wireless network controlled systems

Courtesy – Wipro Lilghting

Page 26: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Magnetic Bearing Chillers

LIFE CYCLE COST FOR

CHILLERS

Initial

Investment

Operation and

maintenance costs

• Low as 0.175 kW/ton at full capacity

and below 0.1 kW/ton at part load

• Reliable operation and lower

maintenance

• Sound levels as low as 70 dBA

Page 27: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Courtesy - York

Magnetic Bearing Chillers

Page 28: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Chiller

1

Chiller

2

Cooling

Tower

Air-conditioned

Zone

Chiller

1

Chiller

2

Cooling

Tower

Air-conditioned

Zone

Temperature description Parallel flow chillers Series counter-flow chillers

Chiller 1 Chiller 2 Chiller 1 Chiller 2

Evaporator leaving Temperature (Eg) 6.67 6.67 11.1 6.67

Condenser leaving temperature (Cg) 35 35 35 32

Lift (L) 28.33 28.33 23.9 25.33

• Adopting a Series Counter Flow

arrangement instead of a parallel

flow arrangement, work done (Lift)

by each compressor is reduced,

which significantly improves the

efficiency of the chillers at full and

part load conditions

• Lift = Cg – Eg

• Nearly 20% reduction is attained by

series counter flow chillers.

Optimized Chiller Operation

Page 29: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Optimized Chiller Operation – Hartman Loop

• All chillers, pumps and

tower fans are variable

speed

• Each chillers is operated

at optimum load

Most plants operate a majority of their time below 60% capacity

Page 30: Innovative Technologies in Building Projects Developers ...€¦ · • Make in India • Power for All Growth Drivers for Construction Business in India. L&T Construction Center

Center for Excellence and Futuristic DevelopmentL&T ConstructionBuildings & Factories

Sensitivity: LNT Construction Internal Use

Be the

Change you

want to see in

the World….