JAA SYSTEMS Safety 1 st in design INKERMAN HOUSE, NEWTOWN, BIRMINGHAM Contract carried out with the co- operation and association with Matt Howells (Services) Ltd Existing walkway glazing removed and replaced during the coldest weather in decades, Nov/Dec 2010 and delivered on time on budget. New glazing system design, incorporating never been done before internally glazed application. £110k contract, completely manufactured on site. Removal and installation carried out in a LIVE site Birmingham city council approved and recommendation

Transcript of INKERMAN HOUSE

Page 1: INKERMAN HOUSE

JAA SYSTEMS Safety 1 st in design

INKERMAN HOUSE, NEWTOWN, BIRMINGHAM

Contract carried out with the co-operation and association with Matt Howells (Services) Ltd

HELPING TO MAKE BUILDINGS LOOK BETTER – Safety 1 st in design

Existing walkway glazing removed and replaced during the coldest weather in decades, Nov/Dec 2010 and delivered on time on budget.

New glazing system design, incorporating never been done before internally glazed application.

£110k contract, completely manufactured on site.

Removal and installation carried out in a LIVE site

Birmingham city council approved and recommendation for future contracts.

Specification of glass and panels created by our company designer.