October 14, 2005 1Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
1. Injector, Sector 21 and BC1 Bulk Power Supplies2. MCOR Ground Fault Detection and Protection
3. New Power Supply Quantities, Heat Loads and Redundancy Idea
Paul Bellomo, Antonio de Lira, Dave Mac Nair
October 14, 2005 2Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Bulk Power Supplies
October 14, 2005 3Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 4Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Background
The three 60V, 165A, 10kW bulk power supplies require remote turn on - turn off capability. No monitoring is needed. Ethernet controller interface specified.
Problem
Power supplies operate in voltage, not current mode. Ethernet controller does not accommodate. No front panel, local control mode
Solution
Use manually controllable 60V, 165A, 10kW power supply
October 14, 2005 5Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 6Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 7Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Remove Two 60V, 165A, 10kW Ethernet power supplies (not yet purchased, bids due 10/17)
Increase quantity of 25V, 375A, 10kW power supplies by two for BC1
No change in overall quantity or cost
Delete two 25V, 375A, 10kW power supplies for BC1 not yet purchased
Write purchase requisition for three 60V, 165A, 10kW MCOR local control bulk power supplies instead of one bulk for the Sector 21, BC1 MCORs – Net 1 add
Increase in quantity - zero
Overall change 0 10kW power supply, 0k$
October 14, 2005 8Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
List of Potential Bulk Power Supply Bidders
Elgar Electronics Corporation 60V, 167A, 10kW SGA60/167E-1DAA9250 Brown Deer RoadSan Diego, CA 92121 Ph - 858-458-0233Grant [email protected]
Matsushada 60V, 170A, 10kWRE60-170c/o BiRa Systems Incorporated2410 Midtown Place, Suite AAlbuquerque, New Mexico 87107Phone: 505-881-8887Mr. Phillip BiswellEmail: [email protected]
EMI-Lambda Model 60V, 165A, 10kWModel ESSC/o Tritek Solutions, Suite 41800 Wyatt DriveSanta Clara, Ca. 94054Mr. Bret McDonald(408) 492-0400 [email protected]
October 14, 2005 9Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Ground Fault Detection and Protection
October 14, 2005 10Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
The MCOR System does not include ground fault detection and protection
Why Ground Fault Detection and Protection?
Prevent power supply current from straying outside magnet
Can lead to equipment damage or fire
Current read by power supply transductor is not the magnet current
Ground current fluctuates causing erratic magnet current
The next few slides propose a ground fault detection and protection system.
October 14, 2005 11Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
PSPSPS
October 14, 2005 12Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 13Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Dataforth DSCA31-06 Signal Conditioner
October 14, 2005 14Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 15Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 16Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
October 14, 2005 17Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Item Quantity Cost
Resistor, 100 ohm 3 $10
Dataforth Signal Conditioner DSCA31-06 3 $150
IDECSmart Relay Starter Kit FLIC-H12RCEAnalog Expansion Module FL1B-J2B2Digital Expansion Module FL1B-MO8B2R2Memory Cartridge FLIC-PM3Power Supply 24VDC, 30W PS5R-SC24
11111
$200$100$70$25$75
DIN Rail, Miscellaneous Parts 1 Lot $50
Total Material Cost $685
October 14, 2005 18Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
New Power Supplies
All areas excluding Injector, LINAC Sector 21, BC1
October 14, 2005 19Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
Location KickerFreestanding
/ IntermediateIntermediate Bulk for MCOR MCOR
Location Total
DC Cable Round Trip
Length
Cable Dissipation
(kW)LINAC, Sector 22 - 30, BC2 1 6 1 5 13
BSY 4 1 19 24 500 ft 2.3
LTU 1 19 2 43 65 500 ft 27.5
Undulator 0 3 99 102 500 ft 7.5
Dump 4 1 5 10 500 ft 5.6
Totals and Grand Total 2 33 8 171 214
October 14, 2005 20Injector, Sector 21, BC1 MCOR Bulks/Ground Fault
•Not an uninterruptible system•“Standard” power supplies•No hot-swap•Bulk-fed or off-line PS•Redundant control system•Low switch stress•Lower cost than redundant modules