INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... ·...

23
INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: KARIMS FASHION WEAR LTD Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur, Dhaka Dhaka Dhaka Bangladesh Assessor: Uttaron Technologies Date: 27 May 2014 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/23

Transcript of INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... ·...

Page 1: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

INITIAL ELECTRICAL ASSESSMENT REPORT(EAR)

 

Factory Name: KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA NorthBishil, Sector-1, Mirpur, Dhaka Dhaka DhakaBangladesh

Assessor: Uttaron Technologies

Date: 27 May 2014

 

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/23

Page 2: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

 Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org. 

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/23

Page 3: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

GENERAL INFORMATION 

General Information

Factory Name: KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur, Dhaka Dhaka Dhaka Bangladesh

Country: Bangladesh

Province: Dhaka

City: Dhaka

Zip Code: 1216

Audit Duration: 1 Days

Re-Audit: Re-Audit After 0 Months

Draft Report Date : 27 May 2014

Final Report Date : 30 June 2014

Are all action items fromprevious assessmentcomplete? :

N/A

Buildings in Complex : One

Is the building(s) ownedor rented by theFactory?:

Rented

Number of BuildingLevels (Stories) :

6 Stories

Approximate BuildingArea (SF) :

9910 SF

Date of BuildingConstruction :

Yr.1998

Date of Last BuildingRenovation/Addition :

Yr. 2006

Ancillary Structures inComplex :

One

Approximate AncillaryStructures Area (SF) :

120 SF

Number of Occupants : 230

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/23

Page 4: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Provide brief descriptionof the electrical systemfor each building.:

Date of Inspection: 27th May, 2014. Brief Description: No. of Main Building: 1 (Six stories). • Karim FashionWear Ltd-(Unit-1) –G.F (Partial),1st F.L, 2nd F.L • Feiyue Fashions Ltd.- G.F (Partial,) 3rd F.L, ,4th, F.L ,5thF.L • Market-G.F (Partial) No of Ancillary Building: 1. • Generator Room.(Sharer). Generator Brand andRating: I. DG-180 KVA (Used Karim Fashions Wear Ltd.) II. DG-180 KVA. All Generators are Cummins Brand.Connection Type: DESCO Pole Mounted Substation (11kv/.44kv) incoming and self-power Source(Generator) are connected to Change over Switch (C.O.S). Emergency Power: There is no UPS/IPS.

Physical location ofSubstation? :

This Factory does not have a substation.

What equipment/loadsdoes the UPS serve? :

No UPS Found In This Factory.

 

 

 

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/23

Page 5: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

ASSESSMENT FINDINGS 

Electrical System Information

Question: Are as-built electrical drawings indicating information such as panel and circuitlocations throughout the building(s) available for review?

 

Priority Level: High

Non-Compliance Level: 1

Description: No as-built drawing was found on the site. Proper Working or “as built”electrical drawings of main distribution circuit and floor levels circuitsconnecting electrical loads (machines/lights/ cooling system etc.) should beavailable at site. With the help of proper electrical drawings, anyaddition/deduction/isolation of loads can be done easily and any table-topdecision can be made centrally taking consideration of safety, integrity andgood productivity. Proper drawing is an engineering tool, and every systemmust have it.

Source of Findings: Visual Assessment: As-built electrical drawings was not found.

Suggested Plan ofAction:

Have a qualified electrical engineer develop as-built electrical drawingsproviding detailing key components of the electrical system.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.3.7

Electrical System Maintenance

Question: Have workers that operate and maintain the electrical system receivedelectrical safety training? Is training documentation on site?

 

Priority Level: High

Non-Compliance Level: 3

Description: Workers that operate and maintain the electrical system received no electricalsafety training and no documents were found at site in this connection.Training is needed for the related workers who deal with electrical equipmentfor the safety of his/her life as well as the life of the total workers working in thefactory.

Source of Findings: Document Review: No documentation found.

Suggested Plan ofAction:

Develop and implement an electrical safety program. Include key topics suchas lock out tag out procedures, personal protective equipment requirements,etc. Keep records of completed training on site.

Suggested DeadlineDate:

01 Sep 2014

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/23

Page 6: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Standard: Reference NFPA 70e for example

Question: Is a periodical Insulation Resistance Measurement Program established andrecorded?

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Periodical insulation resistance test (IR test) shall have to be carried out for allelectrical equipments with Meggar 0.5 KV or 1 KV (according to the voltagerating of equipment).

Source of Findings: Visual Assessment: No such program schedule is recorded on periodicalinsulation resistance test is evident in this site.

Suggested Plan ofAction:

Develop an Insulation Resistance Measurement Program that ensuresdeterioration of insulation resistance will be identified quickly. Testing shouldbe in compliance with International Electrical Testing Association (NETA). Alltransformers, switchgear etc. shall be subject to an insulation resistancemeasurement test to ground after installation but before any wiring isconnected. Insulation tests shall be made between open contacts of circuitbreakers, switches etc. and between each phase and earth.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.13.4 Insulation Tests and 10.13.8Electrical Inspections

Question: Are thermographic scans of electrical equipment completed at least everythree years?

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Thermographic scans of electrical equipment need to be completed at leastevery three years to ensure the proper maintenance of the electricalequipment. Such programs has been witnessed in this factory.

Source of Findings: Visual Assessment: Thermographic scans of electrical equipment was notfound.

Suggested Plan ofAction:

Complete thermographic scans at least on a three year cycle. Thermographicscans should be completed in accordance with the Standard for InfraredInspection of Electrical Systems & Rotating Equipment and NFPA70B or acomparable standard.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.13.8 Electrical Inspections

Electrical System Conditions

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 6/23

Page 7: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: All equipment is efficiently earthed and properly connected to the requirednumber of earth electrodes.

 

Priority Level: High

Non-Compliance Level: 3

Description: In general all parts of equipment and installation other than live parts shall beearth potential, thus ensuring that persons coming in contact with these partsshall also be at earth potential at all times.

Source of Findings: Visual Assessment: All equipment is not efficiently earthed.

Suggested Plan ofAction:

Provide earthing of equipment at required locations and connect to requirednumber of electrodes. Refer to the BNBG for required number of electrodes.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.13.7.1 Inspection of SubstationInstallations.

Question: Are switchboards and/or distribution boards installed in compliant locations?  

Priority Level: High

Non-Compliance Level: 3

Description: In damp or wet locations, surface-type enclosures within the scope of thisarticle shall be placed or equipped so as to prevent moisture or water fromentering and accumulating within the cabinet or cutout box, and shall bemounted so there is at least 6-mm (1⁄4-in.) airspace between the enclosureand the wall or other supporting surface. Enclosures installed in wet locationsshall be weatherproof. For enclosures in wet locations, raceways or cablesentering above the level of un insulated live parts shall use fittings listed forwet locations. Exception: Nonmetallic enclosures shall be permitted to beinstalled without the airspace on a concrete, masonry, tile, or similar surface.DBs (BBT Controls) must installed at reachable height, should be maximum 6feet height. Location: 1st FL.

Source of Findings: Photograph: Some switchboards and/or distribution boards are not installed incompliant locations.

Suggested Plan ofAction:

Need to install switchboards and/or distribution boards in compliant location asexample installation in an accessible height, in a safe distance from damp andwet locations, far from window or door from where water may come etc.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 7/23

Page 8: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: No circuits are drawn for loads without the incorporation of a overcurrentprotection device (circuit breaker).

 

Priority Level: High

Non-Compliance Level: 3

Description: Appropriate protection shall be provided at switchboards and distributionboards for all circuits and sub circuits against short circuit and over current andthe protective apparatus shall be capable of interrupting any short circuitcurrent that may occur without danger. Location: DB/1st FL.

Source of Findings: Photograph: No protection device used.

Suggested Plan ofAction:

Provide protective devices (circuit breakers) for all circuits drawn for loads.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.9 Protection of Circuits

Question: Indications of overheating, overloading, or signs of burning were not observed.  

Priority Level: High

Non-Compliance Level: 3

Description: Indications of overheating, overloading, or signs of burning were observedinside of the MCCB at 1st FL. Location:DB/1st FL.

Source of Findings: Photograph: Indications of overheating, overloading, or signs of burning wereobserved.

Suggested Plan ofAction:

Wiring system components including cables and wiring accessories shall beinstalled or handled only at temperatures within the standard limits.

Suggested DeadlineDate:

07 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.5

Question: Is electrical wiring/cables sized according to capacity of circuit breakers (Nohigher rated circuit breakers with lower rated wiring)?

 

Priority Level: High

Non-Compliance Level: 3

Description: Protective devices shall be provided to break any overload current flowing inthe circuit conductors before such a current could cause a temperature risedetrimental to insulation, joints, terminations or surroundings of theconductors. Location: Main MCCB(West side)1st Fl,DB 1st fl MainBreaker,DB-2nd fl main breaker,front side of Boiler MCCB.

Source of Findings: Photograph: Higher rated circuit breakers with lower rated wiring.

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 8/23

Page 9: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Suggested Plan ofAction:

Consult with a qualified Electrical Engineer and ensure electrical cables aresized according to capacity of circuit breakers.

Suggested DeadlineDate:

15 Sep 2014

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections.

Question: No multi looping of wiring/cables observed at circuit breakers withinswitchboards and/or distribution boards.

 

Priority Level: High

Non-Compliance Level: 3

Description: Multiple cables entering in one point prevent tightening of the bolt and causesthe electrical sparks due to loose connection. Location: Main IncomingMCCB(West side) 1st fl, DB- (East side) 1st fl, front of Boiler MCCB (NorthSide)1st Fl, DB-2nd Fl (East side).SDB 3rd fl mid pint.

Source of Findings: Photograph: Multiple and looping cables.

Suggested Plan ofAction:

Need to separate the multiple cables either using proper size of circuitbreakers or connecting separately on bus bars as per requirements.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling

Question: All metal in the building is connected to the building earthing/grounding systemsuch as metal rebar in concrete, metal frame of building, or metal water pipe.

 

Priority Level: High

Non-Compliance Level: 3

Description: In general all parts of equipment and installation other than live parts shall beearth potential, thus ensuring that persons coming in contact with these partsshall also be at earth potential at all times.

Source of Findings: Visual Assessment: All metal in the building is not connected to the buildingearthing/grounding system.

Suggested Plan ofAction:

Provide earthing/grounding system for All metal in the building.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.10 Earthing

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 9/23

Page 10: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Wiring systems are selected and erected so that no damage is caused by theingress of water.

 

Priority Level: High

Non-Compliance Level: 3

Description: Wiring systems shall be selected and erected so that no damage is caused bythe ingress of water. The completed wiring system shall comply with the IPdegree of protection relevant to the particular location.

Source of Findings: Photograph: Water dropping on cable at Generator room.

Suggested Plan ofAction:

Ensure wiring systems are selected and erected so that no damage is causedby the ingress of water.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.4.3 Presence of Water

Question: Is a readily accessible single point of disconnect provided for each mainelectrical service feed?

 

Priority Level: High

Non-Compliance Level: 2

Description: Main incomer of the panel should be operable to disconnect and must beinstalled at reachable height, should be maximum 6 feet height.

Source of Findings: Photograph: Found inaccessible height.

Suggested Plan ofAction:

Need to have a readily accessible single point of disconnect for each mainelectrical service feed.

Suggested DeadlineDate:

01 Sep 2014

Standard: BNBC 2.7.5 Main Switch and Switchboards

Question: Are all switchboards and/or distribution boards metal enclosed with a deadfront construction?

 

Priority Level: High

Non-Compliance Level: 2

Description: All main switches shall be either of metal clad enclosed patterns or of anyinsulated enclosed pattern and the switches shall be fixed at close proximity tothe point of entry of supply.

Source of Findings: Photograph: Some switchboards and/or distribution boards are metal enclosedwith a dead front construction.

Suggested Plan of Ensure distribution boards are metal enclosed with a dead front construction.

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 10/23

Page 11: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Action:

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are overhead service connections achieved with covered conductors?  

Priority Level: High

Non-Compliance Level: 1

Description: Overhead service connection to a building shall be achieved with coveredconductor. The overhead service connection shall be led into buildings via roofpoles or service masts made of GI pipe having a goose neck bend at the topand installed on the outer wall.

Source of Findings: Visual Assessment: Overhead service connection to the factory building wasnot covered and secured.

Suggested Plan ofAction:

Ensure overhead service conductors are covered by replacing the existingconductors or by covering the existing conductors with an approved material.Consulate a qualified electrical engineer before completing work.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Are all internal components of switchboards and/or distribution boards properlyconcealed (No missing circuit breaker or knockout covers)?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: There should not be loose or missing circuit breaker in the switchboards.Location: 1st FL

Source of Findings: Photograph: All internal components of switchboards and distribution boardsare not properly concealed.

Suggested Plan ofAction:

Provide covers or blanks to conceal all live internal components ofswitchboards and/or distribution boards.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standard Part 10 Section 10.3.9 Sub-Distribution Boards

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 11/23

Page 12: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Are all switchboards and/or distribution boards properly grounded (earthed)?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Panel board cabinets and panel board frames, if of metal, shall be in physicalcontact with each other and shall be grounded. Where the panel board is usedwith nonmetallic raceway or cable or where separate grounding conductorsare provided, a terminal bar for the grounding conductors shall be securedinside the cabinet. The terminal bar shall be bonded to the cabinet and panelboard frame, if of metal; otherwise it shall be connected to the groundingconductor that is run with the conductors feeding the panel board. Location: AllDBs.

Source of Findings: Photograph: All switchboards and/or distribution boards are not properlygrounded (earthed).

Suggested Plan ofAction:

Provide grounding (earthing) for distribution boards as per BNBC section2.8.1.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.10.2 Circuit and System Earthing

Question: Do switchboards and/or distribution boards have clear identification markings?  

Priority Level: Medium

Non-Compliance Level: 3

Description: All distribution boards shall be marked "Lighting" or "Power", as the case maybe, and also be marked with the voltage and number of phases of the supply.Each shall be provided with a circuit list giving diagram of each circuit which itcontrols and the current rating for the circuit and size of fuse element.Location: All DBs.

Source of Findings: Photograph: Distribution boards have no clear identification markings.

Suggested Plan ofAction:

Clear identification/marking must be available at LT, MDB and DBMCB/MCCB. Clear and permanent identification marks are required to bepainted in all distribution boards, switchboards, sub main boards and switchesas necessary.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standard Part 10 Section 10.7 BNBC Part 8 Section 2.11.5.4

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 12/23

Page 13: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Do switchboards and/or distribution boards have capacity information labels?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Capacity labels helps to understand the maximum numbers of protectivedevices that can be accommodated and the capacity of the boxes. Means ofprevention of installing exceeding the designed number of devices is describedin section 408.54, NFPA70-2011. As per NFPA70-2011, a panel board shallbe provided with physical means to prevent the installation of more overcurrent devices than that number for which the panel board was designed,rated, and listed. For the purposes of this section, a 2-pole circuit breaker orfusible switch shall be considered for two over current devices; a 3-pole circuitbreaker or fusible switch shall be considered for three over current devices.Location: All DBs.

Source of Findings: Photograph: Switchboards and/or distribution boards have no capacityinformation labels.

Suggested Plan ofAction:

Provide capacity information labels (Maximum current rating, no of circuitbreakers etc.) for switchboards and distribution boards.

Suggested DeadlineDate:

15 Aug 2014

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards And MetalClad Switchgear and 10.13.7 Inspection of the Installation

Question: Each circuit is provided with a dedicated neutral.  

Priority Level: Medium

Non-Compliance Level: 3

Description: Circuits are not provided with a dedicated neutral for each load. The use ofcommon neutral for more than one circuit shall not allowed in the standard.Location: All DBs.

Source of Findings: Photograph: Circuit is not provided with a dedicated neutral for each load.

Suggested Plan ofAction:

Provide dedicated neutral for circuit.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3 Electrical Wiring and Cabling

Question: Are electrical wiring/cables properly identified?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Electrical wiring/cables are not properly identified. Location: All DBs.

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 13/23

Page 14: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Source of Findings: Photograph: Electrical wiring/cables are not properly identified.

Suggested Plan ofAction:

Need to maintain color code for all cables. For phase conductors use red,yellow, blue, for neutral conductors use black and for grounding cables usegreen dotted yellow.

Suggested DeadlineDate:

01 Sep 2014

Standard: Bangladesh Electricity Rules 1937 Rule 51 and 56

Question: Electrical wiring and conduit is properly supported.  

Priority Level: Medium

Non-Compliance Level: 3

Description: Electrical wiring and conduit is not properly supported.

Source of Findings: Photograph: Inadequate cable supported.

Suggested Plan ofAction:

Provide adequate supports for electrical wiring and conduit.

Suggested DeadlineDate:

31 Oct 2014

Standard: Alliance Standard Part 10 Section 10.3.2, 10.3.4.3, and 10.3.5

Question: Electrical connections at equipment, fixtures, etc are properly secured.  

Priority Level: Medium

Non-Compliance Level: 3

Description: Connections between conductors and between conductors and otherequipment shall provide durable electrical continuity and adequate mechanicalstrength and protection

Source of Findings: Photograph: All Electrical connections not secured.

Suggested Plan ofAction:

If flexible metallic hose is used for wiring to motors and other equipment, thewiring is enclosed to the full lengths, and the hose secured properly byapproved.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.1 Electrical Connections

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 14/23

Page 15: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Power and telecommunication or antenna cables are led in separately.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Power and telecommunication or antenna cables shall be led in separately toavoid interference of distortion.

Source of Findings: Photograph: Power and communication cables are not led separately.

Suggested Plan ofAction:

Lead telecommunication or antenna cables separately to the main point ofservice. Power and telecommunications cables must have separate entrance.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Are switchboards and/or distribution boards free of dust and debris?  

Priority Level: Medium

Non-Compliance Level: 2

Description: Switchboards and/or distribution boards need to be kept clean and free fromdust and debris. Location: Main Breaker-1st fl, Db-1st fl, DB-2nd fl, Generatorroom, COS.

Source of Findings: Photograph: All switchboards and/or distribution boards are free of dirt anddebris.

Suggested Plan ofAction:

Disconnect the panel from the electrical service and clean interior componentsof all dust and debris. Seal all openings within the enclosure to prevent dustand debris from entering.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standard Part 10 Section 10.3.9.1 Enclosures

Question: Are switchboards and/or distribution boards provided with physical means toprevent the installation of more over current devices than that number forwhich the panel board was designed, rated, and listed.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Switchboards and/or distribution boards should have sufficient space inside toinstall more devices. Location: All DBs.

Source of Findings: Visual Assessment: Switch boards and/or distribution boards do not havesufficient space inside.

Suggested Plan of Ensure switchboards and/or distribution boards provided with physical means

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 15/23

Page 16: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Action: to prevent the installation of more over current devices than that number forwhich the panel board was designed, rated, and listed following NFPA 70section 408.54.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are lighting and receptacle (socket) circuits segregated?  

Priority Level: Medium

Non-Compliance Level: 2

Description: Each 15/20A socket outlet for air-conditioner, water cooler, etc. shall beprovided with its own individual fuse with suitable discrimination with backupfuse or miniature circuit breaker (MCB) in the distribution/ sub-distributionboard. Location:All DBs.

Source of Findings: Photograph: Lighting and sockets are not separately controlled.

Suggested Plan ofAction:

Lighting and socket circuits must be separated at the noted locations. Have aqualified electrician separate the lighting and sockets into separate circuits.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.3.7.2

Question: Stranded conductors having a nominal cross-sectional area 6mm2 or greaterare provided with cable sockets. Conductors below 6 mm2 without cablesockets, all strands at the exposed ends are soldered together or are crimpedusing suitable sleeve or ferrules.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: In MDB/DB/SDBs cables should be attached using splicing joint at their busbarwith using cable lugs. As per 2.5.4.4 and 2.5.5.4 (c) of BNBC-2006 Cablesshall be connected to terminals only by soldered or welded lugs, unless theterminals are of such form that it is possible to securely clamp them withoutcutting away the cable strands.

Source of Findings: Photograph: Cable sockets not used in busbar for some of the distributionboards.

Suggested Plan ofAction:

Need to reconnect with proper size of cable sockets.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.8.3 Cable Ends

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 16/23

Page 17: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Cable joints are through porcelain/PVC connectors with PIB tape woundaround joint.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Cable joint should be done in accordance with the direction described in thestandards to avoid loose connections.

Source of Findings: Photograph: Improper cable joints were found.

Suggested Plan ofAction:

Need to joint cable through porcelain/PVC connectors with PIB tape woundaround joint.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.8.4 Cable Joints

Question: Is all electrical wiring/cable properly terminated at its point of termination (Noun-terminated wires, lugs are provided at terminals, etc)?

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Unterminated cables may lead the electrical short circuit. Cables shall beconnected to terminals only by soldered or welded lugs, unless the terminalare of such form that it is possible to securely clamp them without cutting awaythe cable strands.

Source of Findings: Photograph: Cables are not connected with lugs and no unterminated cablefound.

Suggested Plan ofAction:

Ensure all electrical wiring/cable properly terminated at its point of termination.

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.3.9.2 Wiring of Sub-distribution Boards

Question: Lighting fixtures are supported from the structure and seismic bracing isinstalled as required.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: In industrial premises lighting fittings shall be supported by suitablepipe/conduits, brackets fabricated from structural steel, steel chains or similarmaterials depending upon the type and weight of the fittings.

Source of Findings: Photograph: Lighting Fixtures are not fixed with suitable pipe/conduits,brackets fabricated from structural steel.

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 17/23

Page 18: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Suggested Plan ofAction:

Provide proper support for lighting fixtures from the structure and seismicbracing.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standards Part 10 Section 10.3.6 Lighting Fittings

Question: Are junction boxes and other electrical devices provided with covers?  

Priority Level: Medium

Non-Compliance Level: 1

Description: Proper junction boxes need to be used wherever joints are in conductors orcross-over of conductors takes place. Junction boxes should have cover tokeep free of lint buildup to reduce the potential for ignition.

Source of Findings: Photograph: Junction boxes have no cover.

Suggested Plan ofAction:

Provide adequate covers for junction boxes and other electrical devices.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standard Part 10 Section 10.3.5 and 13.6.2

Question: Mechanical guards are provided for electrical equipment and wiring wherenecessary.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Rotating parts of electrical equipment and wiring shroud have mechanicalguard. Location: 3rd Floor.

Source of Findings: Photograph: Mechanical guard is not provided for cables.

Suggested Plan ofAction:

Mechanical guards should be provided for electrical equipment and wiringwhere necessary.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling, 10.6.5Cables, and 10.7 Main Switch, Switchboards And Metal Clad Switchgear

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 18/23

Page 19: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Are electrical insulation mats provided in front of substation, switchboardsand/or distribution boards?

 

Priority Level: Low

Non-Compliance Level: 3

Description: Graded insulation/rubber mat need to provide in front of all switchboards anddistribution boxes to prevent electrical shocks during working inside. Location:Substation, All switchboards and distribution boards.

Source of Findings: Photograph: Electrical insulation mats are not provided in front of substation,switchboards and/or distribution boards.

Suggested Plan ofAction:

Provide electrical insulation mats in front of distribution boards.

Suggested DeadlineDate:

01 Aug 2014

Standard: Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation.

Question: Are meters and other electrical devices (Ammeter, Voltmeter, PFI AutoController, etc) installed on the main electrical equipment operational?

 

Priority Level: Low

Non-Compliance Level: 3

Description: Ammeter, Voltmeter are not working in this factory. These meters are theprimary source to see the current status of the system. Location: All DBs.

Source of Findings: Photograph: All of the meters and other electrical devices (Ammeter,Voltmeter, PFI Auto Controller, etc) are not used.

Suggested Plan ofAction:

Ensure meters and other electrical devices installed on the main electricalequipment are operational.

Suggested DeadlineDate:

15 Aug 2014

Standard: Alliance Standard 10.13.7 Inspection of the Installation

Question: Phase separators are provided between terminals on circuit breakers.  

Priority Level: Low

Non-Compliance Level: 2

Description: Phase separator is need to provide for the terminals of circuit breakers toprevent arcing and short circuit between phases. Location: All DBs

Source of Findings: Photograph: Phase Separator is not fixed on circuit breakers.

Suggested Plan ofAction:

Install phase separators between terminal connections at the noted locations.

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 19/23

Page 20: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections

Emergency Power System

Question: Are emergency power switchboards, distribution boards, and circuits properlyidentified?

 

Priority Level: High

Non-Compliance Level: 2

Description: All emergency power switchboards, distribution boards, and circuits need to beproperly identified to easy locate and maintain to get service in need.

Source of Findings: Visual Assessment: No identification evident here in all areas.

Suggested Plan ofAction:

All boxes and enclosures (including transfer switches, generators, and powerpanels) for emergency circuits shall be permanently marked so they will bereadily identified as a component of an emergency circuit or system. Therequired marking can be by color code, the words “emergency system,” or anyother method that identifies the box or enclosure as a component of theemergency system.

Suggested DeadlineDate:

01 Aug 2014

Standard: NFPA 70 Chapter 7 Article 700.10 Wiring, Emergency System

Question: Is the generator room clean and free of dirt, debris, and improperly storedmaterials?

 

Priority Level: High

Non-Compliance Level: 1

Description: Generator room should be clean and free of dirt, debris and improperly storedmaterials to reduce to a minimum the probability of communicating fire toadjacent combustible materials. The room should have significant amount ofventilation and fitted with a number of ceiling fans. Appropriate type andnumber of firefighting equipment must be installed inside the generator room.Location: Generator Room

Source of Findings: Photograph: Generator Room is not clean.

Suggested Plan ofAction:

Keep the generator room clean and free of all type of dirt, debris, andimproperly stored materials.

Suggested DeadlineDate:

07 Jul 2014

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Is an uninterruptable power supply (UPS) provided?  

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 20/23

Page 21: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Priority Level: High

Non-Compliance Level: 1

Description: Uninterrupted power supply is used to supply power to the lights andcomputers as the installed generator is the prime power for the factory.

Source of Findings: Visual Assessment: UPS not provide in this factory.

Suggested Plan ofAction:

Provide UPS for uninterruptable power supply.

Suggested DeadlineDate:

01 Oct 2014

Standard: Not Applicable

Question: Is the generator room properly illuminated?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Generator room should be illuminated properly.

Source of Findings: Photograph: Inadequate illumination.

Suggested Plan ofAction:

Ensure generator room is properly illuminated (At least 150 lux).

Suggested DeadlineDate:

01 Sep 2014

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Is the generator frame earthing (grounding) provided at two separate points?  

Priority Level: Medium

Non-Compliance Level: 1

Description: Generator frame earthing (grounding) is not provided at two separate points.

Source of Findings: Photograph: Generator earthing not provided two points

Suggested Plan ofAction:

Provide generator frame earthing (grounding) at two separate points.

Suggested DeadlineDate:

15 Aug 2014

Standard: Alliance Standard 10.8.2.2

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 21/23

Page 22: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Question: Is the generator room appropriately sized in order to properly access thegenerator to perform routine maintenance activities?

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Generator room should be enough in size as per BNBC Table 8.2.9 to performthe routine maintenance works.

Source of Findings: Photograph: The generator room is not appropriately sized.

Suggested Plan ofAction:

Need to install the generator in an appropriately sized room.

Suggested DeadlineDate:

01 Oct 2014

Standard: Alliance Standard Part 10 Section 10.8.4 Generator Room

Question: Are inspection, maintenance, and testing procedures of the emergencygenerator being completed and documented?

 

Priority Level: Low

Non-Compliance Level: 1

Description: Document on inspection, maintenance, and testing procedures of thegenerator need to be documented.

Source of Findings: Visual Assessment: Inspection, maintenance, and testing procedures of thegenerator document was not found.

Suggested Plan ofAction:

Establish a routine maintenance and testing program for the emergencygenerator. The program shall be based on all of the following: (1)Manufacturer's recommendations (2) Manufacturer's Instruction manuals (3)Requirements of NFPA 110 Chapter 8.

Suggested DeadlineDate:

01 Sep 2014

Standard: NFPA 110 Chapter 8

Lightning Protection System

Question: Is a lightning protection system installed on the building?  

Priority Level: High

Non-Compliance Level: 1

Description: A building shall have protection against lightning depending on the probabilityof a stroke and acceptable risk levels. A complete lightning protection systemshall consist of air termination network, down conductors and earthtermination. Location: Top of the building

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 22/23

Page 23: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files... · Description: Periodical insulation resistance test (IR test) shall have to be carried out

Source of Findings: Photograph: This factory has no lightning protection system.

Suggested Plan ofAction:

Have a qualified electrical engineer design a lightning protection systemaccording to the BNBC requirements. Have a licensed electrician install thedesigned system.

Suggested DeadlineDate:

01 Oct 2014

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection. Calculate RiskIndex to determine if required.

 

 

FactoryName:

KARIMS FASHION WEAR LTD

Address: Plot #1/2, 1/3 (1st & 2nd Floor) Block # KA North Bishil, Sector-1, Mirpur,Dhaka Dhaka Dhaka Bangladesh

Assessor: UttaronTechnologies

Date: 27 May 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 23/23