![Page 1: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/1.jpg)
Road Number Road Number Road Name Mileage CommittedAbbeville 18.370 $4,460,419.38
Pavements 18.370 $4,460,419.38P030074 0.910 $569,761.04
SC 185 185 S 0.910 $569,761.04
P032435 2.270 $1,358,047.25SC 185 185 S 1.400 $1,358,047.25SC 20 CON Hill Rd 0.789 $0.00SC 20 CON Hwy 28 Bypass 0.081 $0.00
P032436 0.400 $322,403.65S‐ 120 Secession Ave 0.400 $322,403.65
P032443 1.570 $659,428.90S‐ 271 Carwellyn Rd 1.570 $659,428.90
P032444 0.570 $279,682.82SC 72 W 72 Blvd W 0.140 $0.00SC 72 W 72 W 0.430 $279,682.82
P034712 0.420 $152,241.21SC 28 CO2 28 St N 0.019 $0.00SC 28 CO2 Main St N 0.401 $152,241.21
P036766 5.000 $947,499.75SC 72 72 E 3.280 $0.00SC 72 72 W 0.650 $947,499.75SC 72 Hwy 72 E 0.330 $0.00SC 72 Hwy 72 W 0.740 $0.00
P036798 6.250 $21,536.67SC 185 185 N 2.580 $21,536.67SC 20 20 1.510 $0.00SC 28 28 S 1.780 $0.00SC 28 Hwy 28 S 0.380 $0.00
P036883 0.980 $149,818.09S‐ 114 Ellis Rd 0.980 $149,818.09
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 1 of 50
![Page 2: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/2.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Aiken 39.340 $10,600,657.80Pavements 28.340 $7,316,457.65P032512 13.390 $3,798,777.45
SC 19 Edgefield Hwy 4.050 $3,798,777.45US 1 Jefferson Davis Hwy 7.220 $0.00US 1 Richland Ave W 2.120 $0.00
P032530 9.650 $1,978,845.00S‐ 120 W Buena Vista Ave 0.515 $0.00S‐ 120 0.005 $1,978,845.00S‐ 1230 Coral Way 0.129 $0.00S‐ 1230 0.011 $0.00S‐ 1506 Lorraine Dr 0.300 $0.00S‐ 177 Barnwell Ave Ne 1.344 $0.00S‐ 177 Barnwell Ave Nw 1.518 $0.00S‐ 177 0.008 $0.00S‐ 182 Laurens St Sw 0.246 $0.00S‐ 182 0.014 $0.00S‐ 197 Old Edgefield Rd 1.170 $0.00S‐ 3 Park Ave Se 1.880 $0.00S‐ 406 Belair Rd 0.620 $0.00S‐ 511 Hampton Ave Ne 0.260 $0.00S‐ 567 Valley Rd 0.060 $0.00S‐ 79 Banks Mill Rd Se 1.570 $0.00
P034751 3.120 $602,177.46S‐ 281 0.011 $0.00S‐ 281 West Ave 0.769 $602,177.46S‐ 29 Wire Rd 2.180 $0.00S‐ 36 Sweetwater Rd 0.160 $0.00
P034752 1.420 $549,196.04US 78 Charleston Hwy 0.400 $0.00US 78 Richland Ave E 0.020 $0.00US 78 Wagener Rd 0.230 $0.00US 25 BUS Georgia Ave 0.770 $549,196.04
P034753 0.760 $387,461.70SC 230 W Martintown Rd 0.760 $387,461.70
Rural Road Safety 11.000 $3,284,200.15P037068 11.000 $3,284,200.15
US 1 Columbia Hwy N 11.000 $3,284,200.15
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 2 of 50
![Page 3: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/3.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Allendale 30.830 $2,435,247.82Pavements 30.830 $2,435,247.82P036756 1.660 $1,180,530.14
US 278 Allendale‐Fairfax Hwy 1.660 $1,180,530.14
P036757 1.280 $396,558.78S‐ 22 Bluff Rd 0.670 $0.00S‐ 18 Mixons Corner Rd 0.610 $396,558.78
P036923 3.860 $265,601.39SC 3 River Rd 3.860 $265,601.39
P036926 3.870 $440,955.53US 301 Burtons Ferry Hwy 3.870 $440,955.53
P037010 0.860 $83,561.67S‐ 22 Bluff Rd 0.860 $83,561.67
P036900 19.300 $68,040.31SC 125 Augusta Hwy 19.300 $68,040.31
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 3 of 50
![Page 4: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/4.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Anderson 45.970 $11,651,561.84Pavements 27.580 $11,577,830.44P030150 6.580 $3,837,412.30
US 76 Belton Hwy 4.185 $3,837,412.30US 76 Anderson St 2.395 $0.00
P032566 3.410 $2,821,993.50SC 81 Highway 81 S 0.430 $2,821,993.50SC 81 Highway 81 S 0.780 $0.00SC 81 S Murray Av 1.570 $0.00US 178 Liberty Hwy 0.630 $0.00
P034707 1.320 $971,712.52US 76 E River St 1.320 $971,712.52
P036808 2.150 $43,041.80SC 28 Pearman Dairy Rd 2.150 $43,041.80
P036813 1.530 $14,598.69S‐ 65 Highway 81 S 0.020 $14,598.69S‐ 65 Masters Blvd 1.510 $0.00
P036822 4.260 $932,188.46US 76 Belton Honea Path Hwy 3.539 $0.00US 76 S Main 0.080 $0.00US 76 S Main St 0.641 $932,188.46
P036885 3.180 $521,034.98S‐ 34 Whitehall Rd 3.180 $521,034.98
P037060 5.150 $2,435,848.19S‐ 29 Lebanon Rd 2.180 $0.00S‐ 29 Concord Rd 0.140 $2,435,848.19S‐ 29 Harris Bridge Rd 2.830 $0.00
Rural Road Safety 18.390 $73,731.40P037078 4.590 $63,731.40
SC 24 Highway 24 1.040 $0.00SC 24 Highway 24 3.550 $63,731.40
P037225 13.800 $10,000.00US 29 Highway 29 N 1.001 $0.00US 29 Highway 29 N 6.052 $10,000.00US 29 Highway 29 N 6.374 $0.00US 29 0.373 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 4 of 50
![Page 5: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/5.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Bamberg 55.510 $3,807,875.64Pavements 55.510 $3,807,875.64P030671 0.640 $327,295.73
US 78 Heritage Hwy 0.640 $327,295.73
P035753 0.750 $553,014.77US 301 Main Hwy 0.450 $553,014.77US 78 Heritage Hwy 0.300 $0.00
P036753 4.390 $1,192,114.62US 78 Heritage Hwy 4.390 $1,192,114.62
P036812 1.960 $594,460.90S‐ 18 Farrells Rd 1.960 $594,460.90
P036948 2.350 $279,579.29US 301 Main Hwy 2.350 $279,579.29
P036950 8.500 $531,087.48SC 64 Low Country Hwy 2.430 $0.00SC 362 Hunters Chapel Rd 6.070 $531,087.48
P037008 3.060 $197,712.13S‐ 86 Char‐Augusta Rd 3.060 $197,712.13
P036951 16.200 $57,746.82SC 362 Hunters Chapel Rd 12.110 $57,746.82SC 70 Barnwell Hwy 3.950 $0.00US 78 CON 0.140 $0.00
P036946 17.660 $74,863.90US 301 Main Hwy 1.610 $74,863.90US 321 Carolina Hwy 2.800 $0.00US 78 Heritage Hwy 13.250 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 5 of 50
![Page 6: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/6.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Barnwell 34.150 $4,405,670.47Pavements 34.150 $4,405,670.47P030404 0.200 $172,332.92
US 78 Dexter St 0.200 $172,332.92
P030575 1.320 $890,039.53SC 3 Solomon Blatt Ave 1.320 $890,039.53
P030672 0.250 $240,628.75US 78 Dexter St 0.250 $240,628.75
P034723 2.920 $790,865.35US 78 Main St 1.412 $790,865.35US 78 Hwy 78 1.508 $0.00
P036797 3.680 $901,449.49S‐ 20 Patterson Mill Rd 3.680 $901,449.49
P036836 1.750 $808,634.79US 278 Dunbarton Blvd 0.200 $808,634.79US 278 Jackson St 1.550 $0.00
P036952 6.290 $387,164.16US 78 Hwy 78 4.859 $387,164.16US 78 Dexter St 1.431 $0.00
P037004 1.030 $126,741.70S‐ 156 Calhoun St 1.030 $126,741.70
P036953 16.710 $87,813.78SC 64 Dunbarton Blvd 3.650 $87,813.78SC 64 Hwy 64 2.330 $0.00US 278 Jackson St 0.120 $0.00US 278 Marlboro Ave 1.150 $0.00US 278 Hwy 278 0.040 $0.00SC 70 Main St 0.800 $0.00SC 70 Allen St 1.060 $0.00SC 70 Hwy 70 6.056 $0.00SC 70 Barnwell Rd 0.694 $0.00SC 70 Denmark Rd 0.810 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 6 of 50
![Page 7: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/7.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Beaufort 16.046 $4,319,202.17Pavements 16.046 $4,319,202.17P033671 2.810 $1,732,955.90
SC 46 May River Rd 2.810 $1,732,955.90
P034691 1.080 $1,010,791.50S‐ 29 Buck Island Rd 1.080 $1,010,791.50
P037152 2.600 $24,670.25US 21 Sea Island Pkwy 1.330 $24,670.25US 21 BUS Carteret St 0.009 $0.00US 21 BUS Sea Island Pkwy 1.261 $0.00
P037153 4.096 $65,780.66US 278 Fording Island Rd 4.096 $65,780.66
P037159 1.740 $817,090.24US 278 Fording Island Rd 1.740 $817,090.24
P037165 1.320 $423,804.55US 21 Sea Island Pkwy 1.320 $423,804.55
P037170 2.400 $244,109.07S‐ 141 Squire Pope Rd 1.300 $244,109.07S‐ 482 William Hilton Pkwy 0.018 $0.00S‐ 482 Gum Tree Rd 1.082 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 7 of 50
![Page 8: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/8.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Berkeley 56.020 $8,164,908.50Pavements 36.020 $7,934,353.58P032296 7.500 $2,741,839.57
S‐ 317 Forest Lawn Av 0.070 $2,741,839.57S‐ 317 Giles Dr 0.566 $0.00S‐ 317 Matheny Dr 0.474 $0.00S‐ 317 Price St 0.400 $0.00S‐ 339 Parish Rd 0.210 $0.00S‐ 403 Henderson Dr 0.330 $0.00S‐ 485 Cranford Rd 0.440 $0.00S‐ 495 Garwood Rd 0.340 $0.00S‐ 50 Oakley Rd 3.010 $0.00S‐ 748 Harbour Lake Dr 0.910 $0.00S‐ 810 Summit Av 0.750 $0.00
P033668 1.690 $991,848.75S‐ 59 Poplar Hill Dr 0.660 $991,848.75S‐ 59 1.030 $0.00
P034706 3.180 $1,848,189.00SC 402 Hwy 402 3.180 $1,848,189.00
P037044 3.510 $929,565.04US 52 N Hwy 52 2.100 $0.00US 52 0.036 $929,565.04US 52 S Goose Creek Blvd 0.774 $0.00US 52 N Goose Creek Blvd 0.600 $0.00
P037096 12.230 $1,030,723.93SC 6 Old Highway 6 6.391 $1,030,723.93SC 6 Ranger Dr 5.100 $0.00SC 6 Trojan Rd 0.079 $0.00SC 6 Hwy 6 0.660 $0.00
P037147 3.450 $337,089.85S‐ 16 Jedburg Rd 3.450 $337,089.85
P037154 4.460 $55,097.44US 52 N Hwy 52 4.460 $55,097.44
Rural Road Safety 20.000 $230,554.92P037071 10.000 $114,320.35
US 17 ALT N Hwy 17A 9.445 $0.00US 17 ALT N Hwy 52 0.555 $114,320.35
P037072 10.000 $116,234.57SC 6 Old Highway 6 6.391 $116,234.57SC 6 Ranger Dr 3.530 $0.00SC 6 Trojan Rd 0.079 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 8 of 50
![Page 9: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/9.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Calhoun 16.140 $2,678,852.71Pavements 16.140 $2,678,852.71P036828 5.450 $992,363.42
SC 267 Mccords Ferry Rd 5.450 $992,363.42
P036897 1.780 $635,345.36S‐ 31 Old Sandy Run Rd 1.780 $635,345.36
P036929 1.970 $497,562.04US 601 Colonel Thomson Hwy 1.970 $497,562.04
P037011 1.300 $134,676.20US 601 Colonel Thomson Hwy 0.384 $0.00US 601 Saint Matthews Rd 0.280 $134,676.20US 601 Harry C Raysor Dr 0.636 $0.00
P037012 4.200 $304,399.31US 176 Old State Rd 3.120 $0.00SC 419 Fort Motte Rd 1.080 $304,399.31
P037052 1.440 $114,506.38S‐ 122 Riley Rd 1.440 $114,506.38
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 9 of 50
![Page 10: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/10.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Charleston 64.720 $10,105,127.35Pavements 59.300 $9,721,375.46P032295 10.320 $2,573,422.42
S‐ 1187 Midland Park Rd 0.090 $2,573,422.42S‐ 1485 Waites Dr 0.130 $0.00S‐ 1518 Kinglet Dr 0.320 $0.00S‐ 1682 Saul White Blvd 0.150 $0.00S‐ 1687 Minnie St 0.190 $0.00S‐ 176 Chesterfield Rd 0.280 $0.00S‐ 1882 Langston St 0.240 $0.00S‐ 1949 Paulette Dr 0.150 $0.00S‐ 1972 Scott Hill Rd 0.500 $0.00S‐ 216 Fairmont Av 0.480 $0.00S‐ 216 Moultrie St 0.120 $0.00S‐ 2268 Nassau St 0.380 $0.00S‐ 244 E Hudson Av 0.790 $0.00S‐ 244 W Hudson Av 0.150 $0.00S‐ 281 Dobson St 0.250 $0.00S‐ 282 Sumner Av 1.120 $0.00S‐ 306 Briarcliff Dr 0.230 $0.00S‐ 31 Reynolds Av 0.190 $0.00S‐ 311 Pearlott St 0.470 $0.00S‐ 312 Pinckney Park Dr 0.530 $0.00S‐ 604 Kruger Av 0.230 $0.00S‐ 62 W Montague Av 0.830 $0.00S‐ 662 Charlotte St 0.150 $0.00S‐ 664 Market St 0.100 $0.00S‐ 696 Stafford Rd 0.295 $0.00S‐ 696 0.075 $0.00S‐ 733 Evergreen St 0.150 $0.00S‐ 756 Eugene Gibbs St 0.070 $0.00S‐ 798 Shelton St 0.240 $0.00S‐ 877 Limehouse St 0.100 $0.00S‐ 888 Peachtree St 0.150 $0.00S‐ 936 Burlington Av 0.127 $0.00S‐ 936 0.013 $0.00S‐ 940 Hillsboro Dr 0.130 $0.00S‐ 947 William Kennerty Dr 0.510 $0.00S‐ 948 Bur Clare Dr 0.390 $0.00
P033657 5.420 $3,356,377.52US 17 N Highway 17 5.420 $3,356,377.52
P034724 1.790 $1,227,319.96S‐ 13 Remount Rd 1.790 $1,227,319.96
P037143 14.670 $1,198,436.03SC 61 Ashley River Rd 0.810 $1,198,436.03SC 700 Maybank Hwy 13.590 $0.00SC 700 0.010 $0.00SC 700 Folly Road Blvd 0.260 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 10 of 50
![Page 11: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/11.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
P037144 3.830 $721,255.86SC 61 Ashley River Rd 1.570 $0.00SC 61 Paul Cantrell Blvd 0.090 $721,255.86SC 61 Saint Andrews Blvd 1.590 $0.00SC 7 Sam Rittenberg Blvd 0.580 $0.00
P037155 3.830 $48,747.51SC 61 Ashley River Rd 1.570 $0.00SC 61 Paul Cantrell Blvd 0.090 $48,747.51SC 61 Saint Andrews Blvd 1.590 $0.00SC 7 Sam Rittenberg Blvd 0.580 $0.00
P037156 12.510 $62,818.32SC 61 Ashley River Rd 0.810 $62,818.32SC 700 Maybank Hwy 11.690 $0.00SC 700 0.010 $0.00
P037160 1.200 $8,894.63S‐ 72 Whipple Rd 1.200 $8,894.63
P037162 5.730 $524,103.21S‐ 72 Whipple Rd 1.200 $0.00S‐ 1032 Steed Creek Rd 4.530 $524,103.21
Rural Road Safety 5.420 $383,751.89P033657 5.420 $383,751.89
US 17 N Highway 17 5.420 $383,751.89
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 11 of 50
![Page 12: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/12.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Cherokee 23.716 $5,408,402.92Pavements 16.800 $5,271,782.04P030049 1.050 $617,735.55
S‐ 39 S Green River Rd 1.050 $617,735.55
P032477 5.700 $781,054.71SC 198 N Mountain St 2.660 $781,054.71US 221 ALT Cliffside Hwy 3.040 $0.00
P032482 1.610 $226,018.65S‐ 83 Blacksburg Hwy 1.169 $226,018.65S‐ 83 W Carolina St 0.441 $0.00
P032496 1.940 $774,113.41US 29 E Cherokee St 1.940 $774,113.41
P033595 2.620 $1,003,483.57US 29 E Cherokee St 2.620 $1,003,483.57
P033647 2.450 $1,114,247.02S‐ 223 Possum Trot Rd 2.450 $1,114,247.02
P033654 1.430 $755,129.13SC 150 Holland St 0.170 $755,129.13SC 150 Providence Rd 1.260 $0.00
Rural Road Safety 6.916 $136,620.88P037082 6.916 $136,620.88
US 29 Old Georgia Hwy 6.916 $136,620.88
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 12 of 50
![Page 13: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/13.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Chester 16.600 $8,827,019.69Pavements 16.600 $8,827,019.69P030042 1.570 $2,327,955.97
US 21 Catawba River Rd 1.570 $2,327,955.97
P030050 2.050 $1,113,158.69S‐ 70 Westbrook Rd 2.050 $1,113,158.69
P032473 0.660 $231,719.33SC 9 Lancaster Hwy 0.660 $231,719.33
P032483 1.630 $212,224.03S‐ 194 Hillbright Rd 1.000 $212,224.03S‐ 329 Mccandless Rd 0.630 $0.00
P032497 1.990 $1,499,938.49SC 9 Lancaster Hwy 1.990 $1,499,938.49
P033596 5.640 $2,294,067.10SC 72 West End Rd 5.640 $2,294,067.10
P033648 2.290 $860,563.16S‐ 171 Mtn Lakes Rd 2.290 $860,563.16
P034748 0.770 $287,392.92SC 9 Lancaster Hwy 0.770 $287,392.92
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 13 of 50
![Page 14: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/14.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Chesterfield 33.177 $12,045,612.23Pavements 29.377 $11,995,612.23P030039 1.630 $3,094,412.46
SC 9 Mcgregor St 0.540 $3,094,412.46US 601 Highway 9 0.110 $0.00US 601 Mcgregor St 0.980 $0.00
P030051 0.430 $275,553.66S‐ 341 Windsor Dr 0.430 $275,553.66
P032324 9.760 $2,190,961.13S‐ 103 Austin Rd 1.820 $2,190,961.13S‐ 105 Dudley Rd 3.710 $0.00S‐ 136 Buddy Sellers Rd 0.590 $0.00S‐ 274 Brewer Cir 0.188 $0.00S‐ 274 Joseph St 0.002 $0.00S‐ 601 Bay Springs Church Rd 1.970 $0.00S‐ 68 Will Evans Rd 1.480 $0.00
P032474 1.110 $388,253.29SC 151 William Harold Ingram 0.300 $388,253.29SC 151 Harold Ingram Hwy 0.804 $0.00SC 151 Highway 151 0.006 $0.00
P032478 1.460 $398,890.77SC 151 William Harold Ingram 0.301 $0.00SC 151 Highway 151 1.159 $398,890.77
P032484 2.240 $109,812.44S‐ 600 Shiloh Acres Rd 2.240 $109,812.44
P032498 2.770 $1,798,031.51SC 9 Market St 0.140 $1,798,031.51US 1 Market St 0.730 $0.00US 1 Seventh St 0.470 $0.00US 1 Highway 1 1.430 $0.00
P033597 3.390 $2,291,806.91SC 9 Highway 9 0.140 $2,291,806.91SC 9 Chesterfield Hwy 2.360 $0.00US 1 Highway 1 0.890 $0.00
P033649 4.870 $1,290,889.49S‐ 71 Airport Rd 4.870 $1,290,889.49
P036786 1.717 $157,000.57S‐ 159 Woodward Mill Rd 1.717 $157,000.57
Rural Road Safety 3.800 $50,000.00P037085 3.800 $50,000.00
SC 9 Highway 9 3.690 $50,000.00SC 9 0.110 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 14 of 50
![Page 15: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/15.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Clarendon 17.620 $3,714,348.57Pavements 17.620 $3,714,348.57P036892 4.090 $1,285,270.39
S‐ 102 Buff Blvd 0.750 $1,285,270.39S‐ 127 Bill Davis Rd 3.340 $0.00
P036910 4.100 $1,173,013.66US 15 Bethel Hwy 1.340 $0.00US 15 Scott Ave 0.180 $0.00US 15 Summerton Hwy 2.480 $1,173,013.66US 15 Summerton Hwy 0.100 $0.00
P037043 7.020 $1,090,773.87US 301 Sumter Hwy 1.170 $0.00US 301 Brooks St 0.150 $1,090,773.87US 521 Sumter Hwy 1.110 $0.00US 521 Sumter Hwy 4.590 $0.00
P037049 2.410 $165,290.65S‐ 345 White Oak Dr 2.410 $165,290.65
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 15 of 50
![Page 16: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/16.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Colleton 37.667 $6,504,597.13Pavements 14.670 $6,274,787.53P031748 2.920 $1,407,009.77
SC 64 Charleston Hwy 2.153 $0.00SC 64 Hampton St 0.767 $1,407,009.77
P031987 2.230 $1,019,690.83SC 303 Green Pond Hwy 2.230 $1,019,690.83
P032565 1.680 $1,261,378.27SC 64 Hampton St 0.510 $0.00SC 64 Bells Hwy 0.320 $1,261,378.27SC 64 Robertson Blvd 0.850 $0.00
P033688 2.530 $1,119,248.69S‐ 65 Coolers Dairy Rd 2.530 $1,119,248.69
P036895 1.200 $604,567.50SC 303 Green Pond Hwy 1.200 $604,567.50
P037171 2.340 $557,213.60US 17 ALT Cottageville Hwy 1.580 $0.00SC 64 BUS Bells Hwy 0.760 $557,213.60
P037172 1.770 $305,678.87S‐ 754 Tuskegee Airmen Dr 1.770 $305,678.87
Rural Road Safety 22.997 $229,809.60P037079 13.251 $100,000.00
SC 64 Charleston Hwy 13.203 $0.00SC 64 Hampton St 0.048 $100,000.00
P037081 9.746 $129,809.60SC 303 Green Pond Hwy 9.746 $129,809.60
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 16 of 50
![Page 17: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/17.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Darlington 33.970 $3,846,513.77Pavements 33.970 $3,846,513.77P032400 1.910 $1,162,142.19
SC 34 E Bobo Newsom Hwy 0.500 $1,162,142.19SC 34 Harry Byrd Hwy 1.410 $0.00
P033579 3.420 $1,218,225.92S‐ 23 W Old Camden Rd 3.420 $1,218,225.92
P033622 1.660 $270,071.30US 52 S Main St 1.660 $270,071.30
P033630 2.060 $804,035.45US 15 BUS S Fifth St 2.060 $804,035.45
P033638 24.920 $392,038.91S‐ 102 Fourteenth St 3.020 $392,038.91S‐ 13 S Center Rd 1.230 $0.00S‐ 13 N Center Rd 13.280 $0.00S‐ 35 S Charleston Rd 2.600 $0.00S‐ 65 High Point Rd 1.110 $0.00S‐ 16 Kelleybridge Rd 2.400 $0.00S‐ 54 Southborough Rd 1.280 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 17 of 50
![Page 18: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/18.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Dillon 9.740 $3,293,792.62Pavements 9.740 $3,293,792.62P032401 1.090 $1,269,564.89
SC 38 Hwy 38 W 1.090 $1,269,564.89
P033580 2.610 $791,905.44S‐ 130 S 4Th Ave 0.430 $791,905.44S‐ 39 W Main St 1.310 $0.00S‐ 78 E Calhoun St 0.870 $0.00
P033623 0.920 $389,898.18SC 38 38 E 0.429 $389,898.18SC 38 Hwy 38 E 0.161 $0.00SC 38 Hwy 38 E 0.330 $0.00
P033631 3.380 $559,660.79SC 41 Hwy 41 S 3.380 $559,660.79
P033639 1.740 $282,763.32S‐ 48 Bethel Rd 1.740 $282,763.32
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 18 of 50
![Page 19: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/19.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Dorchester 27.637 $6,434,737.13Pavements 18.530 $6,332,943.91P030036 1.570 $1,250,270.33
SC 173 School St 1.570 $1,250,270.33
P032301 4.770 $2,035,996.23S‐ 155 E 2Nd St N 0.300 $2,035,996.23S‐ 155 W 2Nd St N 0.640 $0.00S‐ 186 E 4Th St N 0.200 $0.00S‐ 186 W 4Th St N 0.730 $0.00S‐ 188 E 1St St N 0.310 $0.00S‐ 188 W 1St St N 0.620 $0.00S‐ 197 E 3Rd St S 0.200 $0.00S‐ 197 W 3Rd St S 0.200 $0.00S‐ 208 N Magnolia St 0.890 $0.00S‐ 208 S Magnolia St 0.090 $0.00S‐ 357 W 1St St N 0.590 $0.00
P032526 2.140 $1,158,676.98US 78 Johnston Ave 0.524 $1,158,676.98US 78 Badham Dr 1.616 $0.00
P033686 1.960 $822,572.46S‐ 19 Wire Rd 1.960 $822,572.46
P037139 4.410 $534,015.72US 17 ALT S Main St 0.980 $0.00US 17 ALT 0.010 $0.00US 17 ALT Boone Hill Rd 1.550 $534,015.72US 78 W 5Th St N 1.870 $0.00
P037140 3.280 $434,945.04US 178 W Main St 3.280 $434,945.04
P037141 0.400 $96,467.15S‐ 22 Orangeburg Rd 0.400 $96,467.15
Rural Road Safety 9.107 $101,793.22P037073 9.107 $101,793.22
US 17 ALT Us 17‐A Hwy S 9.107 $101,793.22
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 19 of 50
![Page 20: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/20.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Edgefield 35.360 $9,367,034.77Pavements 26.480 $8,754,675.49P029984 4.300 $2,490,551.85
SC 19 Hill St 0.034 $2,490,551.85SC 19 Hwy 19 4.266 $0.00
P030116 4.670 $1,441,412.83US 25 Hwy 25 N 4.670 $1,441,412.83
P030390 3.120 $1,064,718.91S‐ 39 Old Chappell Ferry Rd 3.120 $1,064,718.91
P032450 2.450 $798,345.85US 25 Hwy 25 N 2.450 $798,345.85
P032451 3.000 $1,476,195.19S‐ 143 Garrett Rd 3.000 $1,476,195.19
P034713 2.320 $866,984.71SC 430 Crest Rd 2.140 $866,984.71SC 430 CON Crest Rd 0.070 $0.00SC 430 CON Meeting St Rd 0.110 $0.00
P036792 3.790 $347,127.60SC 230 W Martintown Rd 3.790 $347,127.60
P036882 2.830 $269,338.55S‐ 35 Walker Rd 2.830 $269,338.55
Rural Road Safety 8.880 $612,359.28P030116 4.670 $320,618.48
US 25 Hwy 25 N 4.670 $320,618.48
P031996 1.760 $122,724.92US 25 Hwy 25 N 1.760 $122,724.92
P032450 2.450 $169,015.88US 25 Hwy 25 N 2.450 $169,015.88
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 20 of 50
![Page 21: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/21.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Fairfield 13.900 $6,412,957.74Pavements 13.900 $6,412,957.74P030044 2.360 $1,879,052.38
SC 215 State Highway 215 S 2.360 $1,879,052.38
P030052 2.030 $889,852.26S‐ 159 Longleaf Rd 1.250 $889,852.26S‐ 82 W Calhoun St 0.780 $0.00
P032479 3.210 $511,189.72SC 200 State Highway 200 2.770 $511,189.72SC 200 Hwy 200 0.440 $0.00
P032485 0.960 $114,532.94S‐ 30 E Peach Rd 0.960 $114,532.94
P033598 2.590 $1,997,747.94SC 215 State Highway 215 S 2.590 $1,997,747.94
P033650 2.750 $1,020,582.50S‐ 70 Reservoir Rd 2.750 $1,020,582.50
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 21 of 50
![Page 22: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/22.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Florence 69.760 $10,963,280.30Pavements 69.760 $10,963,280.30P030492 4.090 $1,382,902.97
S‐ 360 Hyman Road 4.090 $1,382,902.97
P032394 3.180 $2,314,448.79US 52 Lancelot Way 0.100 $0.00US 52 N Ron Mcnair Blvd 0.238 $0.00US 52 S Ron Mcnair Blvd 2.665 $2,314,448.79US 52 Us Hwy 52 0.105 $0.00US 52 W Highway 378 Bypass 0.045 $0.00US 52 W Turbeville Hwy 0.027 $0.00
P032402 2.370 $2,199,053.00SC 327 N Williston Road 2.370 $2,199,053.00
P033581 1.420 $2,306,379.49S‐ 12 S Church St 1.420 $2,306,379.49
P033624 48.010 $557,470.89US 378 W Highway 378 Bypass 2.880 $0.00US 378 W Turbeville Hwy 6.684 $557,470.89US 378 Turbeville Hwy 0.196 $0.00US 378 E Highway 378 Bypass 0.740 $0.00US 52 Us Hwy 52 10.012 $0.00US 52 W Highway 378 Bypass 0.008 $0.00US 52 0.570 $0.00US 52 S Tremont Road 0.744 $0.00US 52 S Irby St 5.824 $0.00US 52 E Twin Church Road 0.258 $0.00US 52 E Palmetto St 0.103 $0.00US 52 S Deerfield Road 0.381 $0.00US 76 E Palmetto St 12.520 $0.00US 76 W Palmetto St 6.870 $0.00US 76 Pisgah Road 0.220 $0.00
P033632 5.120 $1,263,053.77US 301 1.700 $0.00US 301 Freedom Blvd 3.420 $1,263,053.77
P033640 4.050 $848,432.58S‐ 358 E Ashby Road 1.800 $848,432.58S‐ 588 Us Hwy 52 0.010 $0.00S‐ 588 Third Loop Road 2.240 $0.00
P037025 1.520 $91,538.81US 76 E Palmetto St 1.520 $91,538.81
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 22 of 50
![Page 23: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/23.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Georgetown 33.107 $7,595,659.55Pavements 15.870 $7,378,844.26P033625 1.410 $593,850.69
US 521 BUS E Main St 0.380 $0.00US 521 BUS W Main St 1.010 $0.00US 521 BUS E East Main St 0.020 $593,850.69
P033633 3.440 $992,007.13SC 41 BUS S Morgan Ave 1.930 $992,007.13SC 41 BUS N Morgan Ave 1.510 $0.00
P033641 0.980 $269,210.73S‐ 35 Schoolhouse Dr 0.980 $269,210.73
P033582 2.710 $1,304,802.32S‐ 20 E Main St 0.240 $0.00S‐ 161 W Church St 0.790 $1,304,802.32S‐ 449 Martin Luther King Rd 1.480 $0.00S‐ 717 Reservoir St 0.200 $0.00
P031853 3.510 $2,004,456.90US 17 ALT Saints Delight Rd 3.510 $2,004,456.90
P032403 3.820 $2,214,516.49US 17 ALT Saints Delight Rd 3.820 $2,214,516.49
Rural Road Safety 17.237 $216,815.29P037080 7.237 $100,000.00
US 17 Ocean Hwy 0.593 $0.00US 17 Ocean Hwy S 6.644 $100,000.00
P037369 10.000 $116,815.29US 701 N Fraser St 10.000 $116,815.29
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 23 of 50
![Page 24: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/24.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Greenville 52.538 $19,515,570.67Pavements 26.070 $18,842,474.61P031355 4.190 $610,498.59
S‐ 21 Rutherford Rd 4.190 $610,498.59
P032233 8.670 $9,519,080.77SC 183 Buncombe St 0.440 $9,519,080.77SC 183 E North St 0.218 $0.00SC 183 W North St 0.112 $0.00US 123 Easley Bridge Rd 0.630 $0.00US 123 New Easley Hwy 2.070 $0.00US 25 White Horse Rd 2.570 $0.00US 29 Mills Ave 0.950 $0.00US 29 N Church St 1.130 $0.00US 29 S Church St 0.550 $0.00
P032352 5.680 $4,955,893.91US 25 N 25 Hwy 5.680 $4,955,893.91
P032568 2.760 $2,854,938.85S‐ 149 E Faris Rd 1.500 $0.00S‐ 149 W Faris Rd 1.260 $2,854,938.85
P033661 1.080 $337,002.70US 29 Wade Hampton Blvd 1.080 $337,002.70
P033672 3.690 $565,059.79SC 146 Woodruff Rd 1.760 $565,059.79SC 418 418 Hwy 1.930 $0.00
Rural Road Safety 26.468 $673,096.06P032352 5.680 $406,589.36
US 25 N 25 Hwy 5.680 $406,589.36
P037074 13.388 $256,506.70US 25 N 25 Hwy 13.388 $256,506.70
P037226 7.400 $10,000.00SC 14 N 14 Hwy 7.400 $10,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 24 of 50
![Page 25: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/25.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Greenwood 37.550 $6,819,332.27Pavements 23.030 $6,477,199.27P030305 1.840 $818,605.63
S‐ 131 Scotch Cross Rd E 1.840 $818,605.63
P032508 4.860 $2,895,673.94US 221 Hwy 72/221 E 4.860 $2,895,673.94
P032509 3.770 $1,532,697.12S‐ 187 Marshall Rd 2.390 $1,532,697.12S‐ 29 Cambridge Av E 1.380 $0.00
P036799 1.340 $18,872.85US 25 Byp 25 Ne 0.520 $18,872.85US 25 Byp 72 Ne 0.820 $0.00
P036800 0.480 $122,517.57SC 254 Grace St 0.480 $122,517.57
P036831 3.110 $12,553.06S‐ 1 Old Abbeville Hwy 3.110 $12,553.06
P036835 1.520 $296,827.33S‐ 108 Mathis Rd 0.750 $0.00S‐ 108 Mathis St N 0.770 $296,827.33
P036902 6.110 $779,451.77US 178 Hwy 178 N 6.050 $779,451.77US 178 Moorefield St 0.060 $0.00
Rural Road Safety 14.520 $342,133.00P030377 4.030 $332,133.00
US 221 Hwy 72/221 E 4.030 $332,133.00
P037236 10.490 $10,000.00US 25 Hwy 25 N 10.490 $10,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 25 of 50
![Page 26: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/26.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Hampton 29.710 $4,561,724.58Pavements 21.030 $3,174,697.57P036765 6.770 $1,388,260.83
US 321 Columbia Hwy 6.720 $1,388,260.83US 321 Columbia Hwy N 0.050 $0.00
P036795 2.150 $766,682.27S‐ 1 Yemassee Hwy 0.050 $766,682.27S‐ 13 Railroad Ave 0.060 $0.00S‐ 13 Salkahatchie Rd 0.300 $0.00S‐ 13 Old Salkehatchie Hwy 1.740 $0.00
P036801 1.910 $450,121.86US 321 Columbia Hwy 0.499 $0.00US 321 Railroad Ave 1.411 $450,121.86
P036967 4.680 $428,102.68SC 3 Browning Gate Rd 2.150 $428,102.68SC 63 Main St 0.890 $0.00SC 63 Walterboro Hwy 1.640 $0.00
P037000 0.840 $110,180.95S‐ 83 Magnolia St 0.840 $110,180.95
P036999 4.680 $31,348.98US 278 Augusta Hwy 0.010 $31,348.98US 278 Elm St 2.670 $0.00US 278 Carolina Ave 1.940 $0.00US 278 W Carolina Ave 0.060 $0.00
Rural Road Safety 8.680 $1,387,027.01P036765 6.770 $1,075,192.06
US 321 Columbia Hwy 6.720 $1,075,192.06US 321 Columbia Hwy N 0.050 $0.00
P036801 1.910 $311,834.95US 321 Columbia Hwy 0.499 $0.00US 321 Railroad Ave 1.411 $311,834.95
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 26 of 50
![Page 27: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/27.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Horry 89.516 $48,991,591.35Pavements 62.039 $41,226,772.89P033626 6.110 $1,159,922.31
SC 9 Hwy 9 6.110 $1,159,922.31
P033634 9.090 $1,662,989.90US 701 N Hwy 701 4.718 $0.00US 701 Hwy 701 Byp 0.132 $0.00SC 905 N Hwy 905 4.120 $1,662,989.90US 701 BYP Hwy 701 Byp 0.120 $0.00
P033642 5.550 $909,488.85S‐ 102 Daisy Rd 1.620 $909,488.85S‐ 32 Vaught Rd 0.790 $0.00S‐ 548 Four Mile Rd 3.130 $0.00S‐ 548 Hwy 548 0.010 $0.00
P033583 6.180 $2,622,698.12S‐ 196 N Oak St 1.270 $2,622,698.12S‐ 559 Kings Rd 1.890 $0.00S‐ 96 Palmetto St 0.290 $0.00S‐ 99 Lake Swamp Rd 2.730 $0.00
P032404 6.320 $2,028,756.73SC 905 Hwy 905 4.270 $0.00SC 410 S Green Sea Rd 0.610 $2,028,756.73SC 9 BUS N Green Sea Rd 1.440 $0.00
P032395 4.700 $5,789,695.12SC 9 E Hwy 9 4.700 $5,789,695.12
P037425 10.229 $12,798,798.75US 17 N Hwy 17 1.452 $12,798,798.75US 17 Hwy 17 5.057 $0.00US 501 W Hwy 501 2.627 $0.00US 501 Brown Swamp Rd 0.230 $0.00US 501 Noname 0.778 $0.00US 501 Old Dunn Ln 0.085 $0.00
P032396 13.860 $14,254,423.11US 17 Hwy 17 Byp 0.021 $14,254,423.11US 17 N Hwy 17 Byp 6.090 $0.00US 17 71St Ave N 0.690 $0.00US 17 79Th Ave N 0.589 $0.00US 17 Grande Dunes Blvd 0.014 $0.00US 17 Cliffwood Dr 0.156 $0.00US 501 Church St 1.335 $0.00US 501 E Hwy 501 4.163 $0.00US 501 Roberts Rd 0.390 $0.00US 501 Waccamaw Dr 0.245 $0.00US 501 Amber Ln 0.167 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 27 of 50
![Page 28: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/28.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Rural Road Safety 27.477 $7,764,818.46P037075 10.206 $121,250.89
US 701 S Hwy 701 10.206 $121,250.89
P037084 7.271 $105,912.61SC 90 Hwy 90 7.271 $105,912.61
P037142 10.000 $7,537,654.96SC 9 E Hwy 9 Bus 2.070 $0.00SC 9 E Hwy 9 Byp 5.190 $7,537,654.96SC 9 W Hwy 9 2.740 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 28 of 50
![Page 29: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/29.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Jasper 64.690 $21,048,037.40Pavements 24.900 $7,336,517.50P031746 6.760 $3,841,024.77
US 321 Cotton Hill Rd 6.660 $0.00US 321 Deerfield Rd 0.100 $3,841,024.77
P032536 2.550 $1,811,825.38US 278 1.457 $0.00US 278 Independence Blvd 1.093 $1,811,825.38
P033685 0.850 $486,890.54S‐ 119 Sand Hills Rd 0.850 $486,890.54
P037064 5.780 $746,965.71US 17 Jacob Smart Blvd 2.305 $0.00US 17 Smith Xing 0.130 $0.00US 17 Kato Bay Rd 0.205 $0.00SC 462 Coosaw Scenic Dr 3.140 $746,965.71
P037065 2.080 $258,711.51US 17 Kings Hwy 1.480 $258,711.51US 321 Deerfield Rd 0.600 $0.00
P037066 1.140 $134,371.62S‐ 13 Bees Creek Rd 1.140 $134,371.62
P037157 1.480 $14,626.72US 17 Kings Hwy 1.480 $14,626.72
P037158 4.260 $42,101.25US 17 Jacob Smart Blvd 4.130 $42,101.25US 17 Smith Xing 0.130 $0.00
Rural Road Safety 37.540 $11,236,519.90P031746 6.760 $533,829.58
US 321 Cotton Hill Rd 6.660 $0.00US 321 Deerfield Rd 0.100 $533,829.58
P037076 24.480 $100,000.00US 321 Cotton Hill Rd 11.920 $0.00US 321 Deerfield Rd 12.560 $100,000.00
P037218 6.300 $10,602,690.32US 17 Speedway Blvd 5.769 $10,602,690.32US 17 Whyte Hardee Blvd 0.531 $0.00
Bridges 2.250 $2,475,000.00P030260 0.750 $1,375,000.00
I‐ 95 S 0.750 $1,375,000.00
P030481 1.500 $1,100,000.00I‐ 95 S 1.500 $1,100,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 29 of 50
![Page 30: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/30.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Kershaw 23.490 $3,867,703.91Pavements 18.700 $3,817,703.91P033677 3.900 $1,452,436.84
SC 261 Boykin Rd 3.820 $0.00SC 261 0.080 $1,452,436.84
P033678 2.730 $1,182,455.79S‐ 15 Old Stagecoach Rd 1.840 $1,182,455.79S‐ 217 Bull St 0.350 $0.00S‐ 542 Roberts St 0.540 $0.00
P036775 4.500 $378,394.85US 1 Jefferson Davis Hwy 0.831 $0.00US 1 Highway 1 N 3.669 $378,394.85
P036776 4.780 $633,263.45SC 97 John G Richards Rd 4.780 $633,263.45
P036777 2.790 $171,152.98S‐ 87 Mill Creek Rd 2.790 $171,152.98
Rural Road Safety 4.790 $50,000.00P037062 4.790 $50,000.00
US 521 Sumter Hwy 4.790 $50,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 30 of 50
![Page 31: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/31.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Lancaster 42.957 $13,066,346.19Pavements 20.690 $13,006,346.19P030053 2.280 $1,545,955.28
S‐ 218 N Plantation Rd 0.530 $1,545,955.28S‐ 292 N Plantation Rd 0.690 $0.00S‐ 41 Dobys Bridge Rd 0.830 $0.00S‐ 45 S Wylie St 0.202 $0.00S‐ 45 S S Wylie St 0.028 $0.00
P030275 1.710 $1,085,024.84US 601 Gold Mine Hwy 1.710 $1,085,024.84
P032475 0.540 $295,376.44US 521 Charlotte Hwy 0.540 $295,376.44
P032486 1.320 $69,987.95S‐ 755 W North Corner Rd 1.320 $69,987.95
P032499 2.100 $4,327,733.00SC 9 Chester Hwy 0.324 $4,327,733.00SC 9 Hwy 9 Byp W Byp 1.776 $0.00
P033599 5.290 $3,001,205.37SC 903 Flat Creek Rd 5.290 $3,001,205.37
P033651 0.490 $388,363.41S‐ 2 S Main St 0.315 $388,363.41S‐ 2 N Main St 0.175 $0.00
P034704 5.130 $1,857,492.40S‐ 42 Barberville Rd 2.700 $1,857,492.40S‐ 420 Colony Rd 1.130 $0.00S‐ 836 Burke Duncan Rd 1.300 $0.00
P034750 0.770 $282,546.81US 521 Charlotte Hwy 0.770 $282,546.81
P036794 1.060 $152,660.69S‐ 64 Harrisburg Rd 1.060 $152,660.69
Rural Road Safety 22.267 $60,000.00P037085 10.967 $50,000.00
SC 9 Pageland Hwy 10.967 $50,000.00
P037237 11.300 $10,000.00US 521 Charlotte Hwy 11.300 $10,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 31 of 50
![Page 32: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/32.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Laurens 34.010 $6,075,107.34Pavements 21.610 $5,903,040.49P032437 6.150 $3,448,951.33
SC 56 Hwy 56 S 5.890 $3,448,951.33SC 56 Jacobs Hwy 0.260 $0.00
P032438 2.700 $1,316,174.74S‐ 53 Fleming St Ext 1.330 $1,316,174.74S‐ 53 Torrington Rd 1.370 $0.00
P036787 5.510 $56,692.97US 76 E Main St 0.407 $0.00US 76 Hwy 76 E 2.483 $0.00US 76 Hwy 76 W 2.620 $56,692.97
P036789 3.030 $690,267.49SC 72 Hwy 72 W 3.030 $690,267.49
P036881 4.220 $390,953.96S‐ 47 Power House Rd 1.260 $390,953.96S‐ 6 Indian Mound Rd 2.960 $0.00
Rural Road Safety 12.400 $172,066.85P037083 10.000 $172,066.85
US 221 221 S 0.383 $0.00US 221 Hwy 221 S 8.657 $0.00US 221 Hwy 72 W 0.960 $172,066.85
P037236 2.400 $0.00US 25 Hwy 25 2.400 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 32 of 50
![Page 33: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/33.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Lee 8.410 $2,422,908.14Pavements 8.410 $2,422,908.14P033681 1.780 $1,003,786.31
SC 441 Woodrow Rd 0.780 $1,003,786.31SC 527 Elliott Hwy 1.000 $0.00
P033682 3.400 $850,489.80S‐ 28 Manville_St Charles Rd 3.400 $850,489.80
P036781 2.530 $423,043.26US 76 Hwy 76 W 2.530 $423,043.26
P036782 0.700 $145,588.77S‐ 111 Dixon Dr 0.320 $0.00S‐ 111 Dixon Rd 0.380 $145,588.77
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 33 of 50
![Page 34: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/34.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Lexington 82.450 $61,187,273.70Pavements 37.950 $7,916,171.38P030323 1.920 $838,211.93
S‐ 486 Beechwoods Dr 1.920 $838,211.93
P033675 0.250 $214,483.99US 1 W Main St 0.250 $214,483.99
P033676 6.280 $2,427,255.05S‐ 77 Two Notch Rd 2.150 $0.00S‐ 77 Chinquapin Church Rd 0.330 $0.00S‐ 77 Albion Rd 0.010 $0.00S‐ 113 Counts Ferry Rd 1.990 $2,427,255.05S‐ 73 Fish Hatchery Rd 1.800 $0.00
P033684 0.430 $417,706.78US 21 Charleston Hwy 0.430 $417,706.78
P033687 2.570 $1,274,240.52SC 113 Wagner Hwy 2.570 $1,274,240.52
P036772 3.380 $178,493.33US 1 E Main St 0.943 $178,493.33US 1 Augusta Rd 1.557 $0.00US 321 S Church St 0.500 $0.00US 321 Savannah Hwy 0.380 $0.00
P036773 3.660 $254,263.10SC 692 E 5Th St 0.140 $254,263.10SC 692 Redmond Mill Rd 3.520 $0.00
P036774 15.340 $475,004.40S‐ 70 Two Notch Rd 2.840 $0.00S‐ 243 Nazareth Rd 2.990 $475,004.40S‐ 278 Calks Ferry Rd 6.740 $0.00S‐ 77 Two Notch Rd 2.770 $0.00
P036898 4.120 $1,836,512.28US 1 W Columbia Ave 2.140 $1,836,512.28US 1 E Columbia Ave 1.980 $0.00
Rural Road Safety 33.400 $18,896,771.57P037069 20.000 $12,785,761.37
US 178 Fairview Rd 18.146 $12,785,761.37US 178 Main St 0.850 $0.00US 178 S Pine St 0.440 $0.00US 178 Steedman Rd 0.564 $0.00
P037070 13.400 $6,111,010.20SC 302 Edmund Hwy 7.910 $0.00SC 302 Pine St 5.490 $6,111,010.20
Interstate Upgrade 11.100 $34,374,330.75P027003 11.100 $34,374,330.75
I‐ 20 11.100 $34,374,330.75
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 34 of 50
![Page 35: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/35.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Marion 10.469 $4,473,229.72Pavements 10.469 $4,473,229.72P032405 1.850 $2,273,914.22
US 501 N Highway 501 0.002 $2,273,914.22US 501 S Highway 501 1.848 $0.00
P033584 2.740 $891,739.88S‐ 19 Bluff Rd 2.740 $891,739.88
P033627 1.450 $359,210.15US 76 E Highway 76 1.450 $359,210.15
P033635 3.080 $684,696.49SC 41 S Highway 41 1.430 $684,696.49US 501 BUS N Highway 501 Bus 1.650 $0.00
P033643 1.349 $263,668.98S‐ 25 Wahee Rd 1.349 $263,668.98
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 35 of 50
![Page 36: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/36.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Marlboro 11.820 $3,917,260.39Pavements 11.820 $3,917,260.39P032406 2.460 $1,940,016.45
SC 38 Hwy 38 Byp S 0.210 $0.00SC 38 Hwy 38 S 2.250 $1,940,016.45
P033585 1.840 $636,101.54S‐ 50 Zion Rd 1.840 $636,101.54
P033628 1.100 $470,135.66US 1 Hwy 9 W 1.100 $470,135.66
P033636 5.780 $743,284.13US 15 Hwy 15‐401 W 5.780 $743,284.13
P033644 0.640 $127,722.61S‐ 564 Polston Rd 0.640 $127,722.61
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 36 of 50
![Page 37: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/37.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Mccormick 8.740 $1,832,890.22Pavements 8.740 $1,832,890.22P030825 1.530 $16,732.50
US 221 Clarks Hii Hwy 0.456 $16,732.50US 221 Clarks Hill Hwy 1.074 $0.00
P032453 1.500 $765,412.82SC 28 Hwy 28 N 1.500 $765,412.82
P032454 0.970 $374,495.36S‐ 11 S Main St 0.970 $374,495.36
P036793 3.920 $531,748.24SC 28 Hwy 28 S 3.920 $531,748.24
P036796 0.820 $144,501.30S‐ 22 Whitetown Rd 0.820 $144,501.30
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 37 of 50
![Page 38: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/38.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Newberry 21.560 $4,110,250.48Pavements 21.560 $4,110,250.48P032456 3.700 $2,077,135.82
US 176 Us176 3.677 $2,077,135.82US 176 0.023 $0.00
P032457 3.100 $1,380,933.00S‐ 38 Jollystreet Rd 3.100 $1,380,933.00
P036825 8.310 $29,263.58SC 34 Sc34 3.740 $29,263.58SC 391 Sc391 4.570 $0.00
P036826 3.170 $12,724.71S‐ 15 Dreher Island Rd 1.160 $12,724.71S‐ 571 Amicks Landing Rd 0.110 $0.00S‐ 571 State Park Rd 1.900 $0.00
P036827 2.150 $269,730.29S‐ 28 Broad River Rd 2.150 $269,730.29
P036830 1.130 $340,463.08SC 34 Dixie Byp 0.022 $0.00SC 34 Dixie Dr 1.080 $340,463.08SC 34 0.028 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 38 of 50
![Page 39: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/39.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Oconee 35.920 $6,803,275.28Pavements 21.720 $6,739,543.88P030145 1.030 $590,492.48
S‐ 155 E South 2Nd St 0.580 $590,492.48S‐ 610 Daniel Ave 0.450 $0.00
P032304 8.440 $596,454.64SC 182 Oakway Rd 3.730 $596,454.64SC 59 Tokeena Rd 4.697 $0.00SC 59 S Oak St 0.013 $0.00
P032308 1.710 $1,588,449.93US 76 Byp 123 1.710 $1,588,449.93
P032415 3.470 $1,940,717.46US 123 Toccoa Hwy 3.470 $1,940,717.46
P032455 0.950 $1,346,816.52S‐ 63 W South 4Th St 0.950 $1,346,816.52
P033658 4.660 $319,874.63S‐ 65 J P Stevens Rd 0.080 $0.00S‐ 65 Martin Creek Rd 3.040 $0.00S‐ 21 Friendship Rd 1.540 $319,874.63
P033664 1.460 $356,738.22US 76 Clemson Blvd 1.460 $356,738.22
Rural Road Safety 14.200 $63,731.40P037078 14.200 $63,731.40
SC 24 West Oak Hwy 14.200 $63,731.40
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 39 of 50
![Page 40: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/40.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Orangeburg 66.440 $20,732,944.04Pavements 32.710 $9,551,632.91P031747 1.260 $493,798.57
SC 6 Old Number Six Hwy 1.260 $493,798.57
P032057 4.060 $1,299,034.54SC 4 Neeses Hwy 4.060 $1,299,034.54
P036815 4.750 $2,366,240.85US 301 Five Chop Rd 4.750 $2,366,240.85
P036816 10.470 $2,689,213.85SC 3 BUS Springfield Rd 0.280 $2,689,213.85SC 4 Neeses Hwy 5.740 $0.00SC 4 Springfield Rd 0.120 $0.00SC 4 Surrey Race Rd 4.330 $0.00
P036908 0.410 $491,160.94US 15 Five Chop Rd 0.410 $491,160.94
P036911 3.120 $1,375,335.66S‐ 205 Bennett St 0.460 $1,375,335.66S‐ 224 Ellis Ave 1.130 $0.00S‐ 224 Gibson St 0.260 $0.00S‐ 25 Boulevard St 1.270 $0.00
P037048 1.650 $139,218.87SC 6 Old Number Six Hwy 1.650 $139,218.87
P037058 2.330 $354,115.64US 321 Savannah Hwy 2.330 $354,115.64
P037063 4.660 $343,513.99S‐ 104 Dawson St 3.770 $343,513.99S‐ 1091 Brookside Dr 0.350 $0.00S‐ 904 Pinehill Rd 0.170 $0.00S‐ 905 Brookside Dr 0.370 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 40 of 50
![Page 41: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/41.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Rural Road Safety 33.730 $11,181,311.13P030486 4.390 $425,565.88
US 78 0.010 $0.00US 78 Dorange Rd 4.380 $425,565.88
P031747 1.260 $90,968.07SC 6 Old Number Six Hwy 1.260 $90,968.07
P032057 4.060 $241,176.57SC 4 Neeses Hwy 4.060 $241,176.57
P036815 4.750 $342,935.20US 301 Five Chop Rd 4.750 $342,935.20
P036816 10.470 $735,686.24SC 3 BUS Springfield Rd 0.280 $735,686.24SC 4 Neeses Hwy 5.740 $0.00SC 4 Springfield Rd 0.120 $0.00SC 4 Surrey Race Rd 4.330 $0.00
P037220 8.800 $9,344,979.17US 301 Five Chop Rd 8.800 $9,344,979.17
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 41 of 50
![Page 42: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/42.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Pickens 22.050 $4,459,284.35Pavements 22.050 $4,459,284.35P032416 2.000 $2,468,410.56
US 123 Calhoun Mem Hwy 2.000 $2,468,410.56
P032500 2.130 $1,235,528.33S‐ 160 Old Magnolia Rd 0.187 $1,235,528.33S‐ 160 Jones Mill Rd 1.943 $0.00
P034690 2.600 $176,573.80US 123 Calhoun Mem Hwy 2.600 $176,573.80
P034692 0.740 $199,855.46SC 135 N A St 0.670 $199,855.46SC 135 Dacusville Hwy 0.070 $0.00
P034693 11.950 $83,055.00SC 133 Mt Olivet Rd 2.170 $83,055.00SC 133 Crowe Creek Rd 9.780 $0.00
P034703 2.630 $295,861.20S‐ 18 Eighteen Mile Rd 0.266 $295,861.20S‐ 18 Church St 1.344 $0.00S‐ 91 White Oak Rd 1.020 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 42 of 50
![Page 43: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/43.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Richland 38.924 $12,588,684.98Pavements 25.304 $12,228,684.98P030326 4.800 $1,933,477.04
S‐ 32 R Stoudemayer Rd 1.500 $0.00S‐ 234 Freshly Mill Rd 3.300 $1,933,477.04
P030531 0.860 $153,720.00S‐ 3017 Mount View Rd 0.860 $153,720.00
P033673 2.861 $2,102,289.05US 321 Clarendon St 0.040 $0.00US 321 Fairfield Rd 2.352 $0.00SC 12 SPR Forest Dr 0.387 $2,102,289.05SC 12 SPR Strom Thurmond Blvd 0.082 $0.00
P033674 3.413 $2,322,044.91S‐ 31 Bush River Rd 1.200 $0.00S‐ 54 Heins Rd 0.830 $0.00S‐ 73 Colonial Dr 0.343 $0.00S‐ 3048 Columbiana Dr 1.040 $2,322,044.91
P033683 2.060 $2,005,634.56US 76 Garners Ferry Rd 2.060 $2,005,634.56
P036769 0.860 $817,541.12US 1 Two Notch Rd 0.380 $817,541.12US 21 CON Blossom St 0.480 $0.00
P036770 5.170 $1,013,980.96SC 12 Percival Rd 5.170 $1,013,980.96
P036771 3.590 $803,238.02S‐ 129 Kennerly Rd 2.600 $803,238.02S‐ 217 Kennerly Rd 0.990 $0.00
P036899 1.690 $1,076,759.32US 321 Fairfield Rd 1.690 $1,076,759.32
Rural Road Safety 13.620 $360,000.00P036809 13.620 $360,000.00
US 76 Garners Ferry Rd 10.951 $360,000.00US 76 Hill St 2.240 $0.00US 76 0.429 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 43 of 50
![Page 44: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/44.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Saluda 25.960 $7,283,427.46Pavements 16.960 $6,434,558.47P030304 3.470 $1,565,781.12
S‐ 25 Spann Rd 1.300 $0.00S‐ 107 Pencreek Rd 2.170 $1,565,781.12
P031956 2.910 $1,287,933.95SC 121 Newberry Hwy 2.910 $1,287,933.95
P032503 4.690 $2,051,333.09SC 121 Newberry Hwy 4.690 $2,051,333.09
P032504 2.030 $975,018.16S‐ 25 Spann Rd 2.030 $975,018.16
P036823 2.600 $470,075.50US 378 Columbia Hwy 1.460 $0.00US 378 Travis Av 0.160 $0.00US 378 Travis Hwy 0.980 $470,075.50
P036824 1.260 $84,416.65S‐ 136 Emory Rd 0.365 $84,416.65S‐ 136 Ivory Key Rd 0.895 $0.00
Rural Road Safety 9.000 $848,868.99P031956 2.910 $261,021.01
SC 121 Newberry Hwy 2.910 $261,021.01
P032503 4.690 $442,896.49SC 121 Newberry Hwy 4.690 $442,896.49
P032001 1.400 $144,951.49SC 121 Newberry Hwy 1.400 $144,951.49
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 44 of 50
![Page 45: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/45.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Spartanburg 33.630 $10,999,493.05Pavements 33.630 $10,999,493.05P032353 2.150 $2,073,013.95
US 176 S Pine St 2.150 $2,073,013.95
P032356 4.550 $4,772,863.59SC 101 Highway 101 S 0.840 $4,772,863.59SC 9 Boiling Springs Rd 1.110 $0.00US 176 CO2 N Church St 0.210 $0.00US 221 Chesnee Hwy 2.390 $0.00
P032470 3.880 $2,357,990.42S‐ 45 Old Pacolet Rd 1.821 $0.00S‐ 45 White Plains Rd 0.079 $0.00S‐ 222 Howell Rd 1.980 $2,357,990.42
P033602 3.850 $368,122.93SC 295 Southport Rd 3.850 $368,122.93
P033617 7.750 $617,718.30SC 11 Highway 11 1.110 $617,718.30SC 11 Highway 11 W 6.479 $0.00SC 11 W Cherokee St 0.161 $0.00
P033655 2.500 $136,457.67SC 295 W Blackstock Rd 1.500 $136,457.67SC 295 E Blackstock Rd 1.000 $0.00
P033659 8.950 $673,326.19S‐ 65 New Cut Rd 2.950 $0.00S‐ 190 Mountain View Rd 1.550 $673,326.19S‐ 74 Riveroak Rd 4.450 $0.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 45 of 50
![Page 46: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/46.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Sumter 47.742 $6,561,415.90Pavements 21.940 $5,600,605.44P033679 8.600 $2,428,871.18
US 76 Broad St 8.600 $2,428,871.18
P033680 3.670 $1,606,914.46S‐ 514 Edgehill Rd 1.290 $1,606,914.46S‐ 81 W Brewington Rd 1.650 $0.00S‐ 94 Britton Rd 0.730 $0.00
P036778 4.340 $709,589.79US 76 Broad St 4.340 $709,589.79
P036779 1.990 $414,389.49US 378 Myrtle Beach Hwy 1.990 $414,389.49
P036780 0.970 $420,840.52S‐ 1074 E Wesmark Blvd 0.400 $420,840.52S‐ 1074 W Wesmark Blvd 0.570 $0.00
P037295 2.370 $20,000.00SC 53 Narrow Paved Rd 2.370 $20,000.00
Rural Road Safety 25.802 $960,810.46P033679 4.300 $206,946.89
US 76 Broad St 4.300 $206,946.89
P036778 4.340 $543,863.57US 76 Broad St 4.340 $543,863.57
P036852 7.800 $160,000.00US 76 Broad St 7.800 $160,000.00
P037062 9.362 $50,000.00US 521 Camden Hwy 6.260 $0.00US 521 Thomas Sumter Hwy 3.102 $50,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 46 of 50
![Page 47: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/47.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Union 13.300 $4,634,839.14Pavements 13.300 $4,634,839.14P030054 1.420 $937,333.19
S‐ 137 Rice Av Ex 1.420 $937,333.19
P032480 1.560 $268,556.73SC 9 Jonesville Lockhart Hwy 1.560 $268,556.73
P032487 1.850 $206,134.56S‐ 39 Linersville Rd 1.850 $206,134.56
P032506 1.310 $267,646.00SC 9 Jonesville Lockhart Hwy 1.310 $267,646.00
P033600 2.940 $1,201,973.02US 176 Furman L Fendley Hwy 2.940 $1,201,973.02
P033652 2.720 $986,615.67S‐ 13 Pea Ridge Hwy 2.720 $986,615.67
P034720 1.500 $766,579.97US 176 Furman L Fendley Hwy 1.500 $766,579.97
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 47 of 50
![Page 48: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/48.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Williamsburg 21.740 $7,447,661.56Pavements 21.740 $7,447,661.56P031967 3.720 $1,741,628.68
US 521 Us 521 Hwy 3.720 $1,741,628.68
P031984 1.620 $971,530.56US 521 Us 521 Hwy 1.620 $971,530.56
P032407 4.240 $2,293,404.63US 521 Us 521 Hwy 4.240 $2,293,404.63
P033586 3.020 $1,155,719.39S‐ 52 Roper Woods Rd 3.020 $1,155,719.39
P033629 2.950 $350,997.87US 378 0.459 $0.00US 378 Turbeville Hwy 1.421 $350,997.87US 52 Williamsburg County Hwy N 1.070 $0.00
P033637 3.840 $578,918.42SC 261 Hemingway Hwy 3.840 $578,918.42
P033645 2.350 $355,462.01S‐ 24 Nesmith Rd 2.350 $355,462.01
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 48 of 50
![Page 49: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/49.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
York 25.150 $10,722,847.79Pavements 22.110 $10,622,847.79P030048 0.970 $660,301.82
SC 324 Mcfarland Rd 0.970 $660,301.82
P030055 2.620 $1,262,017.43S‐ 32 Cameron Rd 0.710 $1,262,017.43S‐ 724 Marshall Rd 1.910 $0.00
P032476 3.400 $1,292,550.86SC 161 Old York Rd 3.400 $1,292,550.86
P032481 3.960 $1,497,153.91SC 161 Old York Rd 3.960 $1,497,153.91
P032488 3.420 $757,927.48S‐ 100 Harris St 0.590 $757,927.48S‐ 64 Lincoln Rd 2.830 $0.00
P033601 3.790 $3,106,815.92US 21 Anderson Rd S 3.790 $3,106,815.92
P033620 0.640 $762,868.40US 21 Anderson Rd S 0.640 $762,868.40
P033653 3.310 $1,283,211.97S‐ 1172 Park Place Rd 1.030 $1,283,211.97S‐ 1451 Billy Wilson Rd 1.190 $0.00S‐ 334 Carson Rd 1.090 $0.00
Rural Road Safety 3.040 $100,000.00P037077 3.040 $100,000.00
SC 72 Saluda Rd 3.040 $100,000.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.
Page 49 of 50
![Page 50: Infrastructure Maintenance Trust Fund June30 Project List.pdf · Infrastructure Maintenance Trust Fund Aiken 39.340 $10,600,657.80 Pavements 28.340 $7,316,457.65 P032512 13.390 $3,798,777.45](https://reader031.fdocuments.us/reader031/viewer/2022040214/5ec51732bc3561407b1c7d06/html5/thumbnails/50.jpg)
Road Number Road Number Road Name Mileage Committed
Road Committed Values are Grouped by Project
Project Commitments as of June 30, 2018
Infrastructure Maintenance Trust Fund
Statewide 0.000 $1,585,000.00Grand Total 1,578.116 $442,751,580.00
IMTF Road List to be updated on a periodic basis as additional Projects are committed.