INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE
-
Upload
allegra-hatfield -
Category
Documents
-
view
27 -
download
0
description
Transcript of INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE
![Page 1: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/1.jpg)
INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADESERVICING REGIONAL BULK TRADE
Dr António Matos: Chairman, MozambiqueDr António Matos: Chairman, Mozambique
![Page 2: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/2.jpg)
THE SADC TRANSPORT CORRIDORS
THE MAPUTO CORRIDORTHE MAPUTO CORRIDOR
![Page 3: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/3.jpg)
THE MAPUTO CORRIDOR
Road distance – 581kms Road distance – 581kms Rail distance – 590kmsRail distance – 590kms
![Page 4: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/4.jpg)
WHAT IS THE MAPUTO CORRIDOR LOGISTICS INITIATIVE?
KEY ECONOMIC DRIVERS
What are the economic drivers on the What are the economic drivers on the corridor?corridor?
•Investment in key transport infrastructure Investment in key transport infrastructure (road, rail, border post, port and terminals)(road, rail, border post, port and terminals)
•Shorter distances to the port Shorter distances to the port of Maputoof Maputo
•Proximity of Indian and Far East markets to Proximity of Indian and Far East markets to Port MaputoPort Maputo
•A vastly improved trade facilitation A vastly improved trade facilitation environment environment (SARS Rollout and SeW in (SARS Rollout and SeW in Mozambique)Mozambique)
•Regional integration imperatives Regional integration imperatives at at continental and REC level which favour continental and REC level which favour corridor development corridor development
![Page 5: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/5.jpg)
INVESTMENT IN INFRASTRUCTUREINVESTMENT IN INFRASTRUCTURE
R4,5 billion invested since 2000 R4,5 billion invested since 2000
R3 billion in the next 15 yearsR3 billion in the next 15 years
Build-Operate-Transfer Build-Operate-Transfer agreementagreement
TRAC N4 Toll RouteTRAC N4 Toll Route
The first tolled cross border road on the continentThe first tolled cross border road on the continent
![Page 6: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/6.jpg)
WHY THE ANOMALY
![Page 7: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/7.jpg)
WHY THE ANOMALY
![Page 8: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/8.jpg)
INVESTMENT IN RAIL INFRASTRUCTUREINVESTMENT IN RAIL INFRASTRUCTURE
RAILRAIL$200 million $200 million on the rehabilitation of the on the rehabilitation of the
Ressano Garcia Line since 2006Ressano Garcia Line since 2006
CFM will invest CFM will invest $240 million in the next three $240 million in the next three yearsyears on on
• Upgrading and modernization of the lineUpgrading and modernization of the line• Doubling of the lineDoubling of the line• ElectrificationElectrification• Increasing capacity of the bridgesIncreasing capacity of the bridges• Improving signalling and Improving signalling and
telecommunicationstelecommunications
![Page 9: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/9.jpg)
![Page 10: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/10.jpg)
![Page 11: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/11.jpg)
![Page 12: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/12.jpg)
INVESTMENT IN RAIL INFRASTRUCTUREINVESTMENT IN RAIL INFRASTRUCTURE
Joint Operations Centre Established to Joint Operations Centre Established to enhance Collaborationenhance Collaboration
![Page 13: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/13.jpg)
THE LEBOMBO/RESSANO GARCIA THE LEBOMBO/RESSANO GARCIA BORDER POSTBORDER POST
December 2005 peak periodDecember 2005 peak period
Congestion prior to June 2010Congestion prior to June 2010
![Page 14: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/14.jpg)
12 hour operation12 hour operation Severe CongestionSevere Congestion Substantial delaysSubstantial delays InefficienciesInefficiencies Added logistics Added logistics
costscosts
Ressano Garcia
Lebombo
Cars
, to
uri
st,
rail
pass
en
gers
Pedes
tria
ns
Frei
ght,
car
go
Pedestrians
Cars, to
urist,
rail
passe
ngers
Freight, cargo
![Page 15: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/15.jpg)
Lebombo/Ressano Garcia Border PostLebombo/Ressano Garcia Border Post
1998– 29 000 tons through border post - 1998– 29 000 tons through border post - 2007 – 2.25million tons 2007 – 2.25million tons
In the 2 years between 2005 and 2007In the 2 years between 2005 and 2007•43% increase in passengers43% increase in passengers•73% increase in cars and busses 73% increase in cars and busses •65% increase in the total number of vehicles that crossed 65% increase in the total number of vehicles that crossed the borderthe border•1,1 million passengers in Dec 2007 alone1,1 million passengers in Dec 2007 alone•Design capacity maximum 8000 per dayDesign capacity maximum 8000 per day
Freight Bypass Road Opened June 2010Freight Bypass Road Opened June 2010
![Page 16: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/16.jpg)
![Page 17: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/17.jpg)
Ressano Garcia
Lebombo
Cars
, tou
rist,
pass
enge
rs
Pede
stria
ns
Frei
ght,
carg
oPedestrians
Cars, tourist, passengers
Freight, cargo
FREI
GH
T BY
PASS
RO
AD O
PEN
ED JU
NE
2010
CLE
ARIN
G K
M4
FREI
GH
T BY
PASS
RO
AD O
PEN
ED JU
NE
2010
CLE
ARIN
G K
M4
DED
ICAT
ED P
EDES
TRIA
N C
LEAR
ING
FAC
ILIT
YD
EDIC
ATED
PED
ESTR
IAN
CLE
ARIN
G F
ACIL
ITY
18 hour 18 hour operation operation
24 hours at peak 24 hours at peak periodsperiods
![Page 18: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/18.jpg)
TRADE FACILITATION IMPROVEMENTSTRADE FACILITATION IMPROVEMENTS
• SARS Customs ModernisationSARS Customs Modernisation – Increases – Increases Electronic Interface and speed of document Electronic Interface and speed of document clearanceclearance
• Single Electronic Window Single Electronic Window implemented late implemented late 2012 in Mozambique2012 in Mozambique
• Significant Significant amendments to Transit Customs amendments to Transit Customs legislationlegislation in Mozambique currently being in Mozambique currently being finalisedfinalised
• Challenges exist in the SeW arena, but are Challenges exist in the SeW arena, but are being ironed out in partnership with all the being ironed out in partnership with all the role-playersrole-players
![Page 19: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/19.jpg)
ONE OF THE MOST EFFICIENT CORRIDORS ON THE CONTINENT
Between Between 400 and 600 bulk trucks per day 400 and 600 bulk trucks per day through LRGthrough LRG
In excess of In excess of 1000 trucks per day 1000 trucks per day into the port of into the port of MaputoMaputo
Clearing time between 4 and 8 Clearing time between 4 and 8 mins due to mins due to improved EDI and SeW efficienciesimproved EDI and SeW efficiencies
Some C&F agents have it down to between 2 and Some C&F agents have it down to between 2 and 3 mins3 mins
Time and motion study by one MCLI member Time and motion study by one MCLI member 5½ 5½ hours from RG to port, offload and back to RGhours from RG to port, offload and back to RG
![Page 20: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/20.jpg)
Shareholding since Shareholding since
20082008
Shareholding since Shareholding since
20082008
49 %51 %
PORT MAPUTOPORT MAPUTO
![Page 21: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/21.jpg)
![Page 22: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/22.jpg)
![Page 23: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/23.jpg)
INVESTMENT IN PORT MAPUTO
PORT AND TERMINALSPORT AND TERMINALS
$475 million $475 million investment from 2003 to investment from 2003 to September 2013:September 2013:
- - dredgingdredging of channel from -11m to -14m of channel from -11m to -14m-expansion of Matola coal expansion of Matola coal terminal from 7,3 mt terminal from 7,3 mt to 20 mtto 20 mt-expansion of container terminal expansion of container terminal from 150 000k from 150 000k TEU’s to 400 000 TEU’s TEU’s to 400 000 TEU’s -bulk terminal in bulk terminal in Maputo main port from 2 m to Maputo main port from 2 m to 8 m tons8 m tons- - berth rehabilitaberth rehabilitationtion- - general infrastructuregeneral infrastructure - rail sidings, roads, - rail sidings, roads, - - operating equipmentoperating equipment, new tug boats and , new tug boats and pilot boats pilot boats - - human capital human capital investment investment
![Page 24: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/24.jpg)
![Page 25: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/25.jpg)
![Page 26: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/26.jpg)
2003 – SUBSIDENCE AND WRECKAGE AT BERTH 162003 – SUBSIDENCE AND WRECKAGE AT BERTH 16
![Page 27: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/27.jpg)
2004 - INTERNAL RAIL NETWORK UPGRADED TO INTERNATIONAL2004 - INTERNAL RAIL NETWORK UPGRADED TO INTERNATIONAL
STANDARDSSTANDARDS
![Page 28: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/28.jpg)
![Page 29: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/29.jpg)
![Page 30: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/30.jpg)
![Page 31: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/31.jpg)
![Page 32: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/32.jpg)
![Page 33: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/33.jpg)
![Page 34: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/34.jpg)
THE MAPUTO CORRIDOR
• Efficient corridors have a significant impact on Efficient corridors have a significant impact on the the competitiveness of local business and competitiveness of local business and regional economiesregional economies
• Can provide a measure Can provide a measure of predictability, of predictability, reliability and efficiency reliability and efficiency crucial to trade and crucial to trade and logistics supply chains logistics supply chains
• Key to providing Key to providing access to marketsaccess to markets. . • Ability to Ability to address the issues affecting trade address the issues affecting trade in a in a
transport corridor approach has given a transport corridor approach has given a significant level of comfort to users and has significant level of comfort to users and has resulted in significant economic growth in this resulted in significant economic growth in this region.region.
![Page 35: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/35.jpg)
ESSENTIAL ELEMENTS FOR CORRIDORS
√√good infrastructure, good infrastructure, √ √ good systems and procedures, good systems and procedures, √√ good informationgood information√√ institutional mechanism to be the institutional mechanism to be the facilitator and interfacefacilitator and interface√ √ cooperation between the public and cooperation between the public and private sector to ensure sustainable private sector to ensure sustainable success.success.
DESPITE THE CHALLENGES, THE DESPITE THE CHALLENGES, THE MAPUTO MAPUTO CORRIDOR TICKS CORRIDOR TICKS ALL THESE BOXES ALL THESE BOXES
![Page 36: INFRASTRUCTURE DEVELOPMENT SERVICING REGIONAL BULK TRADE](https://reader036.fdocuments.us/reader036/viewer/2022062721/568135f2550346895d9d6251/html5/thumbnails/36.jpg)
THANK YOU
+27 13 755 +27 13 755 60256025
+27 83 555 +27 83 555 60256025
[email protected]@mcli.co.zawww.mcli.co.zawww.mcli.co.za