Infrastructure Development in Batam
Indonesia Infrastructure Investment Forum
Seoul, 20-21 September 2017
BATAM •on the western side of Indonesia, facing the Singapore Strait and 20 Km distance from Singapore
Location
•65.019,5 Km2
Free Trade and Free Port Zone Area
•1.1 million people (2016)
Population
•4.3% (2016)
Economy Growth
Our Facilities
Airport & Seaport Road & Bridges
6 road bridges connecting Batam Island to Tonton, Nipah, Setoko, Rempang, Galang and Galang Baru islands
Length of Road Built 1.676,78 Km
Our Facilities Reservoir & WWTP
9 unit reservoir with volume
109.696.400 m2 and capacity 4.102
l/sec
Existing WWTP with capacity 33 l/sec and new WWTP with
capacity 230 l/sec
Industrial Waste Management
Area of 19,7 Ha
Gas & Electricity
ICT
Total Capacity : 538,95 MW Peak Load : 473 MW
Infrastructure Opportunities
Investment in Batam
SEAPORTS a. Batu Ampar Container Port b. Tanjung Sauh Transhipment Terminal of Kabil Port
LIGHT RAIL TRANSIT (LRT) BATAM
Batam e-Government (Phase-2)
Expansion of Passenger Terminal
HANG NADIM INTERNATIONAL AIRPORT
Batam Sewerage System (Phase-2)
Sea Water Reverse Osmosis Batam
Development and Management of
BP Batam Hospital
Batam Industrial Waste Treatment
Batu Ampar Container Port LOCATION: Batam Island
1. North pier about 970 meters long (650 meter was built in 2015 and 300 meter was built in 1991).
2. East pier about 250 meters long (built in 1978)
3. South pier about 450 meters long (build in 1991).
4. Reclaimed land about 2 hectare
5. Total area of land ready for Container Yard about 10 hectare located at the northern side of the port directly behind the old north pier.
6. Depht of the port is varied from 4 meter to 13 meter.
• U Shape harbor widht 250 meter • Currently served both container and loose cargo • Loading and unloading capacity 6 boxes per hour • There are warehouses and tank farms on the northern
side of the port which need to be dismantle
BATU AMPAR PORT EXPANSION PLAN
Batu Ampar Port Expansion Plan for South , East, and Old North Berth Investor task in Operate South
Berth which include:
• Dredging Channel
• Revitalization wharf fin reinforce
old Berth
• Provide HMC , Crane Stacker,
Fork Lift
• Rebuild and Leveling Container .
• Building, Warehouse, Offices.
Extend lenght of North pier by a further 350 meter
Install modern container handling equipments to increase load/unloading
capacity to 30 boxes per hour.
Deepened the port to 13 meter through out the entire area.
Srenghten existing South and East pier as well as the old North pier.
Old Berth Revitalisation
The port will be offered to investor under a Joint – Operation scheme.
Period of the concession is between 30-50 years.
Because existing South Pier is already operating for the past 30 years and has been generating revenues, BIFZA will require the choosen investor to pay annual rent to compenstate for loss of income due to the transfer of the operation from BIFZA to Investor.
Investor is expected to invest in the construction of the North pier extension of 300 meter, expansion of existing container yard by another 20 hectare and construction additional pier on the south side if the volume waranted, deepened the port to a depth of around 13 m, and install relevant and required equipments and systems to support an efficient modern and dependable container handling and general port operation with a capacity to handle 30 boxes of container per hour.
Up front payment of Rp 400 billion to compenstate BIFZA for the construction and land reclaimation of the North pier extension project completed in 2015.
Revenue Sharing with Fixed and Variable based on proposal
PROPOSED JOINT – OPERATION SCHEME
Proposed structure
BTO
Joint Operation up to 50 years or when targeted IRR is acheived
Investor to manage the port
during the concession
period
BP Batam will only provide oversight to
ensure investor meets all KPI and
SLA
Our Expectation Up front payment to reimburse the construction cost of the new north
pier and land reclaimed of Rp.
400 billion
Annual payment to compenstate
income from existing faciities
(amount tbd)
Revenue sharing (percentage
subject to highest bid)
Sector: Sea Port Sub-Sector: Transhipment Port
Estimated Project Cost: USD 952.6 Million
Government Contracting Agency : BIFZA Contact Person : Mr. Horman Pudinaung [email protected] (62-778) 469782 / (62) 811692995 Estimated Concession Period : max 50 years
Implementation Schedule (ETA): 1. Preparation : 2016 (OBC & FBC) 2. LARAP, Land Acquisition & Tender for
SPC : 2018 3. Construction : 2019 4. Operation : 2022
Financial Feasibility: IRR : 12,45 % FIRR : NPV : USD 378,05 million
Indicative Government Support & Guarantee: Land use for commercial and housing as compensation by Government
LOCATION MAP/PROJECT
PICTURE Indicative Project Structure
Tanjung Sauh Transhipment Terminal of Kabil Port LOCATION: Tanjung Sauh Island
Business Opportunity: Transaction adviser/bidder/financier Project Status: Ready to offer
Interested Investor(s): • PT Pelindo-II • CMA-CGM-France Task of Investor: • Dredging : 600.000 m3 • Quay/Berth : 2.300 m • Backup area/Container yard : 138 Ha • Gantry Crane : 20 unit; RMGC : 60 unit • Heat Truck : 100 unit; Trailer : 100 unit
Description : The project is to develop the transhipment container terminal located in Indonesia, Singapore and Malaysia (IMS-GT) within Sijori Growth Triangle and designated to handle transhipment containers of having capacity of more than 7.0 million TEUs.
Hang Nadim Batam Aeromaritropolis
Hang Nadim Airports Advantages compare with other airports: • Hang Nadim Airport has a large dedicated area of 1762
Hectares • Only 20% of the alocated land that already used, make it easy
to develop with a new concept • State owned land status under the BP Batam. • The aviation market at Hang Nadim Airport already
established well, with the growth over 10% per year • Batam status as a Free Trade Zone Area.
Sector: Mass Transportation Sub-Sector: Rail Based Trains
Estimated Project Cost: USD 956.92 Million
Government Contracting Agency : BIFZA Contact Person : Mr. Horman Pudinaung [email protected] (62-778) 469782 / (62) 811692995 Estimated Concession Period : max 75 years
Implementation Schedule (ETA): 1. Preparation : 2016 (OBC & FBC) 2. LARAP, Land Acquisition & Tender for
SPC : 2018 3. Construction : 2019 4. Operation : 2022
Indicative Government Support & Guarantee: TOD and demand risk guaranteed by Government
LOCATION MAP/PROJECT
PICTURE Indicative Project Structure
Light Rail Transit Batam LOCATION: Batam Island
Business Opportunity: Transaction adviser/bidder/financier Project Status: Ready to offer
Task of Investor: • Line I : Batam Centre – TanjungUncang
• LRT Train =4 unit
• LRT Line = 27.54 km
• LRT Station= 19 station
• Line II : Batu Ampar – HNIA
• LRT Train = 4 unit
• LRT Line = 27.93 km
• LRT Station = 25 station
Description : To provide a safe, fast and convenience public mass transportation in Batam that will be connecting Batam Centre to Tanjung Uncang via Muka Kuning and from Batu Ampar to Hang Nadim International Airport.
Financial Feasibility: IRR : section-1 = 15,34 % section-2 = 16,57 % FIRR : 2,65 billion USD NPV : 11,74 billion USD
Description : The project is to improve outpatient and inpatient services in BP Batam hospital, which is also a referral hospital in Batam.
Sector: Health Sub-Sector: Hospital
Implementation Schedule (ETA): 1. Preparation : 2016 (Master Plan) 2. 1st Phase : 350 Beds completed 2018 with
cardioserebrovascular centre. 3. 2nd Phase : Hostel for Family of patients (2019) 4. 3rd Phase : Maternal, Pediatric and Cancer
Centre 2020
Estimated project cost (until 2021) : USD $ 22.6 million Estimated Revenue: US $ 10 million per year
LOCATION MAP/PROJECT
PICTURE
BP Batam Hospital LOCATION: Batam Island
Only 4 Hospital for Type B (Specialist Service Hospital) in Batam BIFZA Hospital share 14% from number of total beds in Batam Target: 30% market share of Batam
Investment Opportunities • Providing medical equipments such as: MRI, CT
Scan, Cath Lab, With profit sharing scheme • Management Consulting • Tele medicine
Description : To protect water quality by improving environmental infrastructure and wastewater facilities and improve public health, reduce epidemic in Batam and also increase tourists and investment according to improvement in environmental quality.
Sector: Environment Sub-Sector: Sewerage System
Estimated Project Cost: USD 157.27 Million
Government Contracting Agency : BIFZA Contact Person : Mr. Horman Pudinaung [email protected] (62-778) 469782 / (62) 811692995 Estimated Concession Period : max 50 years
Implementation Schedule (ETA): 1. Preparation : 2015 (Master Plan) 2. LARAP, Land Acquisition & Tender for
SPC : 2019 3. Construction : 2020 4. Operation : 2023
Financial Feasibility: IRR : N/A FIRR : N/A NPV : N/A
Indicative Government Support & Guarantee: N/A
LOCATION MAP/PROJECT
PICTURE Indicative Project Structure
Batam Sewerage System (Phase-2) LOCATION: Batam Island
Business Opportunity: Transaction adviser/bidder/financier Project Status: under preparation
Investor(s) : N/A
Financier : N/A
Sector: Environment Sub-Sector: Industrial Waste Treatment
Estimated Project Cost: N/A
Government Contracting Agency : BIFZA Contact Person : Mr. Horman Pudinaung [email protected] (62-778) 469782 / (62) 811692995 Estimated Concession Period : max 50 years
Implementation Schedule (ETA): 1. Preparation : 2018 2. LARAP, Land Acquisition & Tender for
SPC : 2019 3. Construction : 2020 4. Operation : 2023
Financial Feasibility: IRR : N/A FIRR : N/A NPV : N/A
Indicative Government Support & Guarantee: N/A
LOCATION MAP/PROJECT
PICTURE Indicative Project Structure
Batam Industrial Waste Treatment LOCATION: Batam Island
Business Opportunity: Transaction adviser/bidder/financier Project Status: under preparation
Investor(s) : N/A
Financier : N/A
Sector: Water Sub-Sector: Sea water reverse osmosis
Estimated Project Cost: N/A
Government Contracting Agency : BIFZA Contact Person : Mr. Horman Pudinaung [email protected] (62-778) 469782 / (62) 811692995 Estimated Concession Period : max 50 years
Implementation Schedule (ETA): 1. Preparation : 2018 2. LARAP, Land Acquisition & Tender for
SPC : 2019 3. Construction : 2020 4. Operation : 2023
Financial Feasibility: IRR : N/A FIRR : N/A NPV : N/A
Indicative Government Support & Guarantee: N/A
LOCATION MAP/PROJECT
PICTURE Indicative Project Structure
Sea Water Reverse Osmosis LOCATION: Batam Island
Business Opportunity: Transaction adviser/bidder/financier Project Status: Already tender but still available for financing/ ready to offer/ under preparation :
Investor(s) : N/A
Financier : N/A
Sector: Information Technology (IT) Sub-Sector: e-Government
Estimated Project Cost: USD 86 Million
Government Contracting Agency : BIFZA Contact Person : Mr. Horman Pudinang [email protected] (62-778) 469782 / (62) 811692995 Estimated Concession Period : max 50 years
Implementation Schedule (ETA): 1. Preparation : 2018 2. LARAP, Land Acquisition & Tender for
SPC : 2019 3. Construction : 2020 4. Operation : 2023
Financial Feasibility: IRR : N/A FIRR : N/A NPV : N/A
Indicative Government Support & Guarantee: N/A
LOCATION MAP/PROJECT
PICTURE Indicative Project Structure
Batam e-Government (Phase-2) LOCATION: Batam Island
Business Opportunity: Transaction adviser/bidder/financier Project Status: under preparation
Investor(s) : N/A
Financier : N/A
Description : Batam e-Government phase-2 aims to develop Batam Single Window, application and system based on cloud technology.