Infra

16
2 1 July 2010 – 30 June 2011

description

Maguindanao Infrastractor

Transcript of Infra

Page 1: Infra

2

1 July 2010 – 30 June 2011

Page 2: Infra

3

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011

TYPE OF PROJECT: CONSTRUCTION OF COVERED COURT IMPLEMENTING PROCEDURE: BY ADMINISTRATION

IMPLEMENTING AGENCY: PROVINCIAL GOV’T OF MAGUINDANAO

IMPLEMENTING AGENCY: 20m X 30m

PROJECT

LOCATION

PROJECT

COST

IMPLEMENTING DATE

PERCENTAGE

ACCOM-

PLISHED

REMARKS

START

ACCOM-

PLISHED

1 Buluan 3,900,000.00 Feb.7,2011 On going- 47.83%

2 South Upi 4,200,000.00 Feb.7,2011 April 2011 100% COMPLETED

3 Datu Odin

Sinsuat

3,900,000.00 Feb.7,2011 June 2011 100% COMPLETED

4 Datu Blah

Sinsuat

3,900,000.00 Feb.7,2011 June 2011 100% COMPLETED

5 Datu Paglas 3,900,000.00 Feb.7,2011 April 2011 100% COMPLETED

6 Gen. SKP 3,900,000.00 Mar 10,2011 On going- 74.72%

7 Datu

Montawal

4,000,000.00 Mar 10,2011 On going- 11.25%

8 Parang 4,000,000.00 Apr 11,2011 On going- 84.82%

9 Guindulunga

n

4,200,000.00 Mar 10,2011 On going- 46.16%

10 Sultan sa

Barongis

4,200,000.00 Mar 10,2011 On going- 23.08%

11 Pandag 3,900,000.00 Feb.7,2011 On going- 84.82%

12 Mangudadatu 3,900,000.00 Feb.7,2011 On going- 31.84%

13 Ampatuan 3,900,000.00 Feb.7,2011 On going- 31.84%

Page 3: Infra

4

GUINDULUNGAN, MAGUINDANAO DATU ODIN SINSUAT, MAGUINDANAO

COVERED COURT AT PANDAG,

MAGUINDANAO

SOUTH UPI, MAGUINDANAO

COVERED COURT AT DATU MONTAWAL,

MAGUINDANAO

COVERED COURT AT BULUAN,

MAGUINDANAO

Page 4: Infra

5

COVERED COURT AT PARANG,

MAGUINDANAO

COVERED COURT AT SSB, MAGUINDANAO

COVERED COURT AT GEN. SKP,

MAGUINDANAO

Page 5: Infra

6

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011

TYPE OF PROJECT: MULTI-PURPOSE BUILDING IMPLEMENTING PROCEDURE: BY ADMINISTRATION IMPLEMENTING AGENCY: PROVINCIAL GOVERNMENT OF

MAGUINDANAO

PROJECT

TITLE

PROJECT

LOCATION DIMENSION

PROJECT

COST

IMPLEMENTING

DATE

#

ACCOM-

PLISHED

REMARKS

START ACCOM-

PLISHED

1 Const. of

Eight (8)

Units

Prov'l.

Satellite

Office

Buluan 7.0m x 30m 3,500000.0

0

Jun.

15,

2010

Dec.

2010

100% COMPLE

TED

2 Constructi

on of Four

(4) Units

Comfort

Rooms

Buluan 4.0m x 10m 1283596.2

6

Jun.

15,

2010

Dec.

2010

100% COMPLE

TED

3 Constructi

on of

Multi-

purpose

Bldg. -

Shrine

Hall

Buluan - 939,947.20 Oct.

20,201

0

On

going-

COMPLE

TED

4 Repair of

Comelec

Office

Buluan - 189,,408.7

5

Oct.

2010

Nov.

2010

100% COMPLE

TED

5 Renovatio

n of Rural

Health

Unit

Building

Buluan - 728,227.51 Nov.

27,

2010

Jan.

2011

100% COMPLE

TED

6 Const. of

Rajah

Buayan -

Silongan

Peace

Center

Buluan - 4,500,000.

00

Dec. 5,

2010

On

going-

7 Constructi

on of

Training

Center

Buluan - 3,000,000.

00

Jan.13,

2011

On

going-

8 Constructi

on of

Paglat - 1,170,000.

00

Feb.10,

2011

On

going-

90.83

Page 6: Infra

7

Justice

Hall

9 Constructi

on of

open

Shade at

Gov.

Office

Buluan -

400,000.00

Jun 15,

2010

Jul.

2011

100% COMPLE

TED

10 Constructi

on of

Justice

Hall

Buluan

- 1,170,000.

00

Feb.10,

2011

On

going-

90.83

COMMELEC OFFICE AT BULUAN, MAGUINDANAO

COMFORT ROOM AT BULUAN, MAGUINDANAO

TRAINING CENTER AT BULUAN,

MAGUINDANA

Page 7: Infra

8

MULTI-PUPOSE BUILDING AT BULUAN,

MAGUINDANAO

JUSTICE HALL AT DATU PAGLAS,

MAGUINDANAO

PEACE CENTER AT BULUAN,

MAGUINDANAO

OPEN SHADE AT GOVERNOR'S OFFICE,

BULUAN MAGUINDANAO

Page 8: Infra

9

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011

TYPE OF PROJECT: FARM TO MARKET ROAD (FMR) IMPLEMENTING PROCEDURE: BY ADMINISTRATION

IMPLEMENTING AGENCY: PROVINCIAL GOV’T OF MAGUINDANAO

PROJECT

TITLE

PROJECT

LOCATION

DIMEN-

SION

PROJECT

COST

IMPLEMENTING DATE

#

ACCOM-

PLISHED

REMARKS

DATE START DATE

ACCOMP-LISHED

1 Repair of

Mapayag

Farm to

Market

Road

Talitay 6.50 6, 430,

000.00

June 20,

2010

100% COMPLETED

2 Repair of

Tumbao -

Talitay

Farm to

Market

Road

Mangudad

atu

7.50 6, 650,

000.00

July 26,

2010

100% COMPLETED

3 Repair of

Buluan

Farm to

Market

Road

Buluan 9.50 8, 990,

000.00

July 27,

2010

100% COMPLETED

4 Repair of

Paitan -

Banaba

Farm to

Market

Road

Datu

Abdullah

Sangki

3.80 3, 300,

000.00

Aug. 28,

2010

100% COMPLETED

5 Repair of

Satan

Farm to

Market

Road

Datu

Unsay

1.50

1, 300,

000.00

Sept. 18,

2010

100% COMPLETED

6 Reapir of

Pandag

Farm to

Market

Road

Pandag 1.00 1, 000,

000.00

Oct. 11,

2010

100% COMPLETED

7 Repair of

Salman

Farm to

Market

Road

Ampatuan 3.60 4, 500,

000.00

Oct. 18,

2010

100% COMPLETED

8 Constructi

on of

Bagan-

Guindu-

lungan

7.00 4, 166,

000.00

Dec. 21,

2010

100% COMPLETED

Page 9: Infra

10

Kateman

FMR

9 Repair of

Badak -

Makainis

Farm to

Market

Road

GEN. SKP 3.00 3, 000,

000.00

Sept. 2010 100% COMPLETED

10 Repair of

Tumaginti

ng -

Indatuan

FMR

Northern

Kabunta-

lan

3.40 5, 000,

000.00

Sept. 2010 100% COMPLETED

11 Repair of

South Upi

FMR

South UPI 3.40 2, 500,

000.00

Sept. 2010 100% COMPLETED

12 Repair of

Lao-Lao -

Panosolen

FMR

GEN. SKP 3.125 3, 000,

000.00

Sept. 2010 100% COMPLETED

13 Repair of

Pandag

Farm to

Market

Road

Pandag 3.50 3, 400,

000.00

Sept. 2010 100% COMPLETED

14 Repair of

South Upi

Farm tyo

Market

Road

South Upi 3.80 3, 800,

000.00

Sept. 2010 100% COMPLETED

15 Const. of

Poblacion

Kauran -

Sitio

Tinago

FMR

Ampatuan 0.834 1, 500,

000.00

Sept. 2010 100% COMPLETED

16 Const. of

Poblacion

Kauran -

Kilantan

Spring

FMR

Ampatuan 0.460 700,

000.00

Sept. 2010 100% COMPLETED

Page 10: Infra

11

DINGANEN, BULDON

Page 11: Infra

12

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011

TYPE OF PROJECT: ROADS IMPLEMENTING PROCEDURE: BY ADMINISTRATION IMPLEMENTING AGENCY: PROVINCIAL GOV’T OF MAGUINDANAO

PROJECT

TITLE

PROJECT

LOCATION

DIM

EN-

SION

PROJECT

COST

IMPLEMENTING

DATE

#

ACCOM-

PLISHED

REMARKS

DATE START

ACCOM-PLISHED

1 Const. of

Initian -

Paitan

Provincial

Road

Mangudadatu 8.00 4, 284, 000.00 July 22,

2010

100% COMPLETED

2 Upgrading

of Alip-

Limpoyon

Provincial

Road

Datu Paglas 8.16 7,400,000.00 Aug. 16,

2010

100% COMPLETED

3 Repair of

Ganta -

Tumbao -

Taviran

Prov'l. Road

Mother

Kabuntalan

3.00

2, 600, 000.00 Sept. 20,

2010

100% COMPLETED

4 Constructio

n of Kalian

Road

Mangudadatu 4.20 4, 100, 000.00 Sept.

2010

100% COMPLETED

5 Repair of

Nuyo -

Dinganen

Provincial

Road

Buldon 6.00 6, 000, 000.00 Sept.

2010

100% COMPLETED

6 Upgrading

of Rancho-

Quirino

Boundary

Road

Mangudadatu 5.10

0

3,800,000.00 Sept.

2010

100% COMPLETED

7 Repair of

Mercedes -

Lamin

Road

Barira 4.50 4, 500, 000.00 Feb.

2011

100% COMPLETED

8 Repair of

Mariga

Lupa Road

Parang 1.50 1, 500, 000.00 Feb.

2011

100% COMPLETED

9 Repair of

Landasan

Road

Parang 1.00 1, 500, 000.00 Feb.

2011

100% COMPLETED

10 Rehabilitati

on of

Parang-

Buldon

Prov'l. Road

Buldon 6.00 6, 000, 000.00 Feb.

2011

100% COMPLETED

Page 12: Infra

13

BRGY. LANDASAN, PARANG

BRGY. LANDASAN, PARANG

Page 13: Infra

14

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011

TIME OF PROJECT: PERIMETER FENCE AND STRUCTURAL

LANDMARKS IMPLEMENTING PROCEDURE: BY ADMINISTRATION IMPLEMENTING AGENCY: PROVINCIAL GOV’T OF MAGUINDANAO

DIMENSION: 80m X 200m

PROJECT

TITLE

PROJECT

LOCATION

PROJECT

COST

IMPLEMENTING

DATE

#

ACCOMPLI

SHED

REMARKS

START

ACCOMPLISHE

D

1 Const. of

Prov’l

Satellite

Office

Perimeter

Fence

Buluan 3,158,531.

45

Dec. 21,

2010

Dec.

2010

100% COMPLETED

2 Const.

Buluan

Mosque

Perimeter

Fence

Buluan 1,650,000.

00

Jan. 17,

2011

Dec.

2010

100% COMPLETED

3 Const. of

Mun.

Boundary

Structural

Landmark

Datu Saudi

Ampatuan,

Datu

Salibo

1,519,551.

60

Jan. 16,

2011

On

going-

4 Const.

Buluan

Mosque

Perimeter

Fence

Datu Saudi

Ampatuan,

Guindulun

gan

1,519,551.

60

Jan. 16,

2011

On

going-

PERIMETER FENCE AT PROVINCIAL SATELLITE

OFFICE, BULUAN, MAGUINDANAO

PERIMETER FENCE AT BULUAN MOSQUE,

BULUAN MAGUINDANAO

Page 14: Infra

15

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011 TYPE OF PROJECT: REPAIR OF SCHOOL BUILDING/HOSPITAL & HOUSING

PROJECT IMPLEMENTING PROCEDURE: BY ADMINISTRATION

IMPLEMENTING AGENCY: PROVINCIAL GOVERNMENT OF MAGUINDANAO

PROJECT

TITLE

PROJECT

LOCA-

TION

DIMEN-

SION

PROJECT

COST

IMPLEMENTING

DATE

#

ACCOMP

-LISHED REMARKS

START ACCOM-PLISHED

1 Rerpair of

School

Building

Buluan

National

High

School

- - 100% COMPLETED

2 Repair of

Wooden

Bleacher

Luminpg

Elem.

School

Buluan

- 515,000.00 Jan. 20,

2011

100% COMPLETED

3 Repair of

Erap/Digs

Hospital

Parang - 3,637,059.00 Jan. 16,

2011

100% COMPLETED

4 Const. of

10-Units

Housing

Projects

Datu

Odin

Sinsuat

5m X5m

5 Const. of

10-Units

Housing

Projects

Buldon 5m X5m

6 Const. of

10-Units

Housing

Projects

Pandag 5m X5m

Page 15: Infra

16

REPAIR OF WOODEN BLEACHER, BULUAN,

MAGUINDANAO

HOUSING PROJECTS AT PANDAG,

MAGUINADANAO

HOUSING PROJECT AT DATUODIN SINSUAT,

MAGUINADANAO

HOUSING PROJECTS AT BULUAN,

MAGUINADANAO

Page 16: Infra

17

LIST OF INFRASTRUCTURE PROJECTS CY 2010-2011 TYPE OF PROJECT: STREET LIGHTS

IMPLEMENTING PROCEDURE: BY ADMINISTRATION

IMPLEMENTING AGENCY: PROVINCIAL GOVERNMENT OF MAGUINDANAO

PROJECT

TITLE

PROJECT

LOCATIO

N

PROJECT

COST

IMPLEMENTING

DATE

#

ACCOMP

LISHED

REMARKS

START

ACCOMPLIS

HED

1 Installation

of 20-units

Street Lights

Parang 200,000.0

0

2 Installation

of 20-units

Street Lights

Datu

Paglas

200,000.0

0

3 Installation

of 20-units

Street Lights

Pandag 200,000.0

0

4 Installation

of 20-units

Street Lights

Paglat 200,000.0

0

100% COMPLETED

5 Installation

of 20-units

Street Lights

Sultan

Kudarat

3,381,500

.00

6 Installation

of 20-units

Street Lights

Sultan

Kudarat

93,000.00 Oct.

28,2011