Informal Meeting with FPSC Staff 2015 Hurricane Season Preparation March 18, 2015.
-
Upload
edwin-berry -
Category
Documents
-
view
213 -
download
0
description
3 Continue to Strengthen the Infrastructure Distribution Hardening Infrastructure Communication Communication Organization Restoration Continue 3-prong approach –EWL CIF projects/critical poles –Incremental Community projects –EWL design guidelines Storm flood/surge – Downtown Miami vaults