Infoasasas

download Infoasasas

If you can't read please download the document

description

sdgdfgdgg

Transcript of Infoasasas

foreign component cost = 13,227,187,216.26local component cost = 101,334,202.31total abc cost = 609,258,191.49contract amount : 8,500,066,055.73 (loan)local currency portion ---- php 78,932,912.72total in peso = 411,561,000.00feb 2013 --- 1,077.47 Korean won to US dollars (average rate calculation)researh monthly average - x-rates.com: 1 KRW = 0.000919 KRWbased on contract: 1 KRW = 0.000928 usdderivation of exchange rate...contract price consists of:EDCF loan component - foreign cost component denominated in korean wonGOP counterpart - local cost componentall taxes duties and levies on goods in the phil. shall be part of contract cost local currency portionELECTRICAL:plans needed that should be to-scalefrom small scale submittedaeronautical ground lighting layoutsingle line diagramelectrical main equipment arrangementpower house, power layoutpower house grounding layoutals center line barrette foundationrunway edge lights installation detail-inset typerunway edge lights and taxiway edge lights installation detailrunway threshold lights foundation