Gedling Bouncy Castle Hire – Inflatable Slide Risk Assessment
Gedling Bouncy Castle Hire trading under Live 9 Events LTD – Company No. 10862044
Hazard
Who might be harmed?
Existing Control Measures New Control Measures
Risk
(1-5)
1 Low – 5 High
Harm
(1-5)
1 Low – 5 High
Likelihood
(1-5)
1 Low – 5 High
Tripping over anchorage
points/spare equipment/electrical
cable
All
All anchor points used as per manufacturer’s instructions and spare
equipment leads etc. either stowed/erected safely.
In event of large number of participants attending, additional
safety fencing erected. Where possible electrical cables do not cross
any public pathway. If unavoidable cable erected overhead or covered
using cable run/tape.
1 1 1
Neck or Back Injury
Users of Equipment
Adult supervision at all times and follow rules provided in terms and
conditions
Client to show users safety cartoons supplied. 2 5 1
Falls from heights,
Jumping of front of the unit.
Users of Equipment
Adult supervision at all times and follow rules provided in terms and conditions. Safety mats supplied as
standard.
Do not allow children to climb walls or beams. Client to show children safety
cartoons supplied. 1 4 2
Equipment or Inflatable/s Bed to
become a wet surface Users of Equipment Vacate users of equipment once
inflatable becomes wet
Adhere to safety information provided in safety book in terms of rain during
hire of equipment/inflatable/s. 1 2 2
Adverse weather conditions including High wind speeds &
sudden gusts (19mph or over)
Users of Equipment
No use of equipment/inflatable/s in winds or gusts over 19mph, item to be
switched off in heavy rain Wind anemometer left with client to
check wind every 30 minutes Dependant of
weather Dependant of
weather Dependant of
weather
Gedling Bouncy Castle Hire – Inflatable Slide Risk Assessment
Gedling Bouncy Castle Hire trading under Live 9 Events LTD – Company No. 10862044
Over enthusiastic participants or larger participants colliding
with smaller participants or
aggressive behaviour
Users of Equipment Adult supervision at all times and follow rules of user limitations
At an event of fencing or trained operators to be hired in.
Participants put into groups of similar size/age. Further information listed in
Safety Book, which is supplied on every hire.
1 1 1
All other injuries including injuries
caused by other users, injuries caused by
misbehaviour and not following rules.
Users of Equipment Adult supervision at all times and follow rules provided in terms and
conditions
Adult supervision responsible to put rules in place, all rules in the safety
book supplied must be followed. 2 2 2
Choking Users of Equipment No food or drink to be taken on
equipment/inflatable/s. Adult supervisor responsible to put rules in place, all rules in the safety
book supplied must be followed. 3 4 2
Other localised risks:
1.
2.
3.
4.
The above information is based on manufacturers criteria and experience from extensive use of the equipment Any other action required: If manned event ensure that operators follow all “Staff Information Pack & Safety Guide” as supplied. Risk assessment carried out by: ..................................... Date: ....../....../...... Signature: .....................................