INFINITE POSSIBILITIES BOUNDLESS INNOVATION -...
Transcript of INFINITE POSSIBILITIES BOUNDLESS INNOVATION -...
INFINITE POSSIBILITIES BOUNDLESS INNOVATIONOur vision is to transform the building and construction industry by promoting the use of cost-effective, mission-critical steel structure solutions to solve our clients’ problems with innovation and commitment.
1
Vision• To be the preferred
steel structure contractor to clients in Asia
Mission• To promote the use
of steel design and construction methods
Values• Innovation• Commitment• Can-do spirit
Steel Buildings & Structures• Design and build
high rise steel buildings and complex steel structures
Steel Fabrication• Fabrication of steel
components for building projects and on customer orders
Buildings A&A • Buildings alteration
and additions work for existing buildings
Premium Fitting Out Works• Premium hospitality • Luxury retail fitting out • Top class
office renovation• Architectural
spiral steel stairs
Founded in 2005, Goldwave Steel Structure Engineering Limited (“Goldwave”) is a Hong Kong based engineering contractor specialized in steel buildings and structures. The company acts as a specialist steel contractor for all kinds of steel structure.
OURCOMPANY
Expertise• Specialized in steel
and steel Only• Expertise
accumulated through years of project experience
Processes• Client-oriented
end-to-end solution from concept design to erection
Resources• In-house structure
engineers• In-house project
management team• In-house
fabrication team• Nippon Steel &
Sumikin Bussan Corporation as strategic partner
OUR VMV OUR SPECIALTIES OUR STRENGTHS
2
Challenges faced by the construction industry in hong kong
Costs
• High land costs drives up property costs and interest costs for developers
• Site worker shortage drives up labour costs and thus construction costs
Time
• Time is money because of high land costs
• Shortest possible time to completion and to go-to-market
Space
• Floor space is money• Maximizing usable floor space to
improve efficiency
Site
Murray Road
Graham St (Site C)
King Lam St
Middle Road
Cheung Shun St
Price
$23.2b
$11b
$7.8b
$4.7b
$4.0b
$psf
$50k
$8.0k
$7.8k
$13.8K
$7.5k
How do Goldwave’s Steel Solutions address the challenges?
Create Value
• Less on-site labour costs• Lighter building structure
resulting in less extensive foundation and thus cost savings in substructure
• Sustainable structure• Steel is multi-cyclable• Quicker to go-to-market• Faster investment payback
Save Time
• Shorter time for Foundation• Shorter construction time per floor• Shorter overall project time
Generate Space
• Smaller and less structural columns yielding more floor space
• Future-proofing — clear space created by a steel structure increases flexibility in the usage of a building
SteelReinforcedConcretevs
• Lighter foundation required• 1-2 days per floor faster to complete
construction of one floor (Approx. 75 days of construction time
saved for a 200m building)• Additional rental income for shorter
construction time and extra floor space created more than compensate the slightly higher costs of steel structure
3
TURN IMPOSSIBLETOPOSSIBLE
Steel frame tower construction at the composite building at 45-47 Pottinger Street, Central, Hong Kong
The site was considered not buildable using traditional building methods because of site constraints. Goldwave provided a workable steel frame solution which overcome the challenges of geographical complexity as the site is located on a slope, low capacity foundation had been built and tiny site area provided very limited storage for building materials. The 24 storey building structure of 135,970 square feet gross floor area was completed in 14 months. The building itself won an award from the Amercian Institute of Architects.
4
Redevelopment of the multi-storey carpark into a 20 storey Ginza-style commercial complex of gross floor area 339,709 square feet at 15 Middle Road, Tsimshatsui, Hong Kong
The developer selected Goldwave’s steel structure solution over traditional concrete solutions offered by others because we can complete the project faster and generate more floor area with steel structure design — translating into value-added economic benefits.
CREATE CLIENT VALUESTHROUGHINNOVATION
5
Goldwave is one of the most respected steel structure engineering, fabrication, project and construction management company in Hong Kong. Our biggest asset is our people. We employ teams of talented, creative and motivated engineers, project management professionals, fabrication and welding experts who add value to our business. Along with our clients, we continue to deliver landmark projects.
EXPERIENCE & SKILLS
Technical expertise • In house Registered Structural Engineer• In house China National Class I Registered Structural Team• CSWIP Certified Welding Experts• Civil Engineering Team
Design and Engineering• New building steel structure design and engineering• Steel structure analysis and re-engineering
Project Management• Steel structure of high rise building and composite building • Building addition and alteration• Piling and foundation• Fitting out • Safety, Health and Environmental
Fabrication capacity • Steel structure for high rise building• Steel structure for mega podium and temporary work• Steel bridge and tower• Mega roof truss for sport center and Skyline for
commercial complex• Architecture spiral stair cases (multi-storey)• Steel structure modular retail booth• Sheet piles
6
7
Goldwave is not merely a steel specialist and contractor but a value engineering and end-to-end solution provider.
The business prides itself on leading investment in latest Building Information Modelling (BIM) technology to digitize and optimize steel structural design 3D modelling and shop detailing is conducted in-house for every project to develop costs effective and mission-critical solutions.
What client’s benefits from our BIM solutions?
• Enabling 3-D visualization of every stage in project development
• Provide a digial platform to optimize the construction methods and sequeneces; and to enhance coordination of multiple parties in a project
• Improving design efficiency and preventing typical design flaws (e.g. geometric conflicts analyses) in the outset
• Improving effciency and accuracy of cost estimation by automating the generation of bills of quantities
• Integrating design changes with costing update
• Potentially shortening construction timeline by identifying and resolving potential problems at design stage
7
Employing BIM to digitize and optimize steel structural design that makes design revision and cost estimation efficiently
BUILDING INFORMATION MODELLING (BIM)
8
1. Registered General Building Contractor
2. Approved Specialist for Structural Steelwork and Piling
3. Registered Specialist Contractor in Foundation
4. Welders qualified in accordance with EN287-1:2004, JIS Z 3801:1997, JIS Z 3841:1997
CERTIFICATION AND TEAM’S QUALIFICATION
FEATURED PROJECTSSteel Building Structure
New World Centre, Tsim Sha Tsui Fabrication and installation of H2 Tower Steel Stanchions Client: New World Construction Limited600 Tons (2015 – 2016)
Qian Hai, PRC / 45-storey Mixed Use Commercial DevelopmentStructural design, fabrication and erection of steel frame Client: HHC construction Co. Ltd.GFA 119,500 sqm 12,000 T (est. Q3 2019 to 2020)
Tai Wai Station Property DevelopmentFabrication and installation of temp. and permanent steel structure Client: Hip Seng Construction Co., Ltd.GFA 57,142 sqm 15,000 Tons (2017 – 2019)
704-730 King’s Road Office Development, North PointFabrication and installation of structural steel stanchionsClient: New World Construction Limited Completed (2016 – 2017)
45 Pottinger Street, Central / 24 Storey commercial complexStructural design, fabrication and installation of steel frame Client: Henderson Land Development Ltd.GFA 12,635 sqm 1,350 Tons (2016 – 2017)
15 Middle Road, TST / 20-storey commercial complexStructural design, fabrication and erection of steel frameClient: Henderson Land Development Ltd.GFA 42,000 sqm 6,500T (2017 – 2018)
9
Hong Kong – Zhuhai – Macau Bridge (HK Section)Fabrication of sheet piles for Cellular StructureMain Contractor: China Harbour EngineeringTons 5,100 Tons (2012)
MTRC Shatin to Central Link – Contract 1113Fabrication and installation of dog housesMain Contractor: Kaden ConstructionCompleted: 2013
The University of Hong Kong (New Auditorium at Chong Yuet Ming Amenities Centre)Structural design, fabrication and installation of steel frame Main Contractor: Woon Lee Construction Ltd.400 Tons (2014)
FEATURED PROJECTSNew Build
23-29 Stanley Street, Central Structural steelwork for steel frame at roof Supply and installationMain contractor: Wecon limited (2016 – 2017)
Pak Kong Golf Driving Range, Sai Kung Fabrication and installation of steel towers Client: New World Construction Limited 550 Tons (2013 – 2016)
10
Cartier, 1 Peking Road Structural A&A work at G-L/FClient: Ultra Remix (China) Ltd.Dec 2017 – May 2018
FEATURED PROJECTSBuildings Additional and Alteration
Equipment Maintenance WorkshopReconstruction of canopy Client: HAECOFeb – Apr 2018
Phase I, II, III of Cathy Pacific at HKIA The Lounge and The WingA&A, structural steelClient: Legend Interiors2010 – 2012
MCL Ap Lei Chau CinemaAddition and alteration works Client: Parks Decoration & Engineering Ltd. 2015 – 2016
Hong Kong Polytechnic UniversityBuilder’s works for replacement of Air-Cooled Chiller Plant Client: Young’s Engineering Co. Ltd.Sept 2016 – present 2018
Miramar Commercial Building, Tsim Sha TsuiSupply and install steel frame support for Air-Conditioning Plant at R/FClient: Far East Engineering Limited2013 – 201411
Chow Tai Fook Jewellery Retail stores renovation over 30 stores in HK, Macau and overseas
New World Dynamic, Taikoo ShingOffice Renovation
GIA Central Office Office Renovation
FEATURED PROJECTSPremium Fitting Out — Hospitality, retail and office renovation
Chow Tai Fook Jewellery Outdoor signage Retail stores renovation over 30 stores in HK, Macau and overseas
Phase I, II, III of Cathy Pacific at HKIA The LoungeA&A, structural steel Client: Legend Interiors2010 – 2012
12
Apple Store, Nanjing, China1st Signature Steel Spiral Staircase Fabrication and installationMain Contractor: Permasteelisa
MCL Cinema, Tsueng Kwan OMega Pose Free Steel Spiral StaircaseFabrication and installationClient: Parks Decoration & Engineering Ltd.
Rolex Shop, HK International Airport Post Free Steel Spiral Staircase Fabrication and installationMain Contractor: Permasteelisa
Space Saving Steel Spiral StaircaseModular fabrication and installationCompleted within 2 weeks from fabrication to installation
FEATURED PROJECTSArchitectural Steel Application
13
Furnished Modular UnitFood and Drink StoreObservatory Wheel, Central
Architectural steel structure workExhibition booth of international trade show
1st Kinetic Façade in Hong Kong (Patent pending)H Code, 45 Pottinger Street, Central
14
FEATURED PROJECTSArchitectural Steel Application
Automatic Blasting Machine
Factory Entrance CNC Flame Cutting Machine
CNC Pipe Profile Cutting Machine Factory Fabrication
Milling Machine
15
FABRICATION FACILITIES
Mega Roof Truss Crank Beams
Steel Beams Steel Columns
Customized Box Section Steel Stanchions
PRODUCTION
16
QUALITY ASSURANCE
Quality assurance is a fundamental element across all of our operations. The continuous investment of new facilities, procedures, rigid control by our expert team and our In-house JIS certified welders are integrated into our quality assurance system from initial enquiry through design, value engineering, materials ordering, fabrication to on-site erection.
17
Goldwave commits to implementing and maintaining an in-house health and safety management system in full compliance of related legislations and codes of practice.
We and our package subcontractors are fully engaged in executing our health and safety management policy, ensuring all of our staff are fully understand and comply with this policy.
Appropriate training is provided to all levels of staff before commence of work to ascertain all stakeholders are competent to safeguard their own health and safety at work as well as the others.
We seek for continual improvement by keeping abreast with the efficiency and effectiveness of the health and safety management system and reviews the same periodically based on the feedbacks from all levels of employees.
Goldwave will contribute its greatest effort to prevent accident and ill health.
SAFETY AND HEALTH POLICY
18
Office address:
Goldwave Steel Structure Engineering Limited
Room 2802-08 28/F Enterprise Square Two
3 Sheung Yuet Road
Kowloon Bay, Kowloon
Hong Kong
www.goldwave.hk
T+ (852) 2489 8919
F+ (852) 2487 8919
ENQUIRIES
15 M
idd
le R
oad
Co
mm
erc
ial D
evelo
pm
ent
June, 2018