Inter-Office Memorandum
To : El-Wastani Fields General Managers.
C.C. : El-Wastani Fields Maintenance Manager.
From : Maintenance General Manager.
Subject : Air Dryer for Inert Gas system
Date : August 4, 2015 Total no. of
pages (1)
Reference to the above mentioned subject; please be informed that air
dryer for inert gas system has a problem and not working with proper way
Based on above, you are kindly requested to form a committee from
(Electrical, Instrument, mechanical, Process) departments as below with
coordinator Eng. Ahmed Refaat to investigate and check the all inert gas
system and prepare scope of work for final decision to solve the inert gas
problems
1- Eng. Abd Allah Anwar Mechanical Department
2- Eng. Wael Fouad Mechanical Department
3- Eng. Hitham Eid Instrument Department
4- Eng. Hashim Ali Instrument Department
5- Eng. Ahmed Mesbah Process Department
6- Eng. Mohamed Ghalab Process Department
7- Eng. Amr Gouda Electrical Department
8- Eng. Ashraf Amin Electrical Department
Maintenance General Manager