Industrial Site Location
Transcript of Industrial Site Location
^
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO,USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, OrdnanceSurvey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMapcontributors, and the GIS User Community
LegendBlount County Limits
Alcoa City Limits
Industrial Site Location
p
PELLISSIPPI PKWY (I-140)
FUTURE RELOCATED ALCOA HWY(US HWY 129)
(1)(2)(3)
(3)
PROPOSED BUILDING
(1) (2)
UP
GCAR36
SWITCHGEAR1-W123
FIRE PUMPROOM1-W126
TRUCKERS'LOUNGE1-W127
SWITCHGEARMSD
1-W160
EMERGENCYSERVICES
1-W161
STAIR J1-W163
UTILITY1-W164
MHESHAFT D1-W165
STORAGE1-W166
WOMEN1-W152
BREAKROOM1-W150
SWITCHGEARMSA
1-W155 POD LIFTSHAFT C1-W121
MEN1-W151
JANITOR1-W122
EMERGENCYSERVICES1-W124
STAIR B1-W105
EMERGENCYSERVICES1-W156
STAIR D1-W125
DEMARC1-W182
ALTERNATE MDF / MSC /DEMARC
JAN.1-W154
STAIR H1-W153
RECRUITING1-171
TRAININGROOM1-141
LOSSPREVENTION
1-153
HOTELOFFICE1-152
HR OPENAREA1-144
IDF1-145
HRMANAGER
1-146
GMCONFERENCE
1-143
FIRST DAYTRAINING
1-103
SECURITY1-102
VESTIBULE1-101
CLOSET1-101A
LOCKERS1-106
BREAKROOM1-107
VENDING1-108
V.STORAGE
1-110
VENDING1-109
JANITOR1-111
WOMEN1-112 MEN
1-113
CORRIDOR1-114
MEN1-115
MEN1-116
WOMEN1-117
WOMEN1-118 JANITOR
1-119
TOILET1-132
MEETING1-147
VESTIBULE1-170
WOMEN1-175
ELEC /TELECOM
1-178
RECRUITINGOFFICE1-180
ELECTRICAL1-179
RECRUITINGMANAGER
1-172
BREAKROOM1-173
MEN1-174
JANITOR1-176
INTERVIEWROOM1-181
AMWELLWAITING
1-130
NEWMOTHERS
1-139AMWELL1-131
TELEMED1-136
GENERALMANAGER
1-155 CONTROLLER1-154
CAREERCHOICE
CLASSROOM1-104
ABLUTION2
1-120
ABLUTION1
1-121
LOBBY1-122
FAITH1-123
SMOKERSCANOPY
G-506
HOTELOFFICE1-148
HOTELOFFICE1-149
MEETING1-151
STORAGE1-105
CORRIDOR1-156
UTILITY1-W103
ELEV #11-W104
CORRIDOR1-138
OPENAREA1-142
TRAININGROOM1-140
WELLNESS1-137
STAIR A1-W102
OBSERV 11-135
OBSERV 21-134
STORAGE1-133
MDF1-W184
MSC1-W183
UTILITY1-125
LOWVOLTAGE
1-124
COST ESTIMATE SUMMARYRoute:
Project Type of Work:County:Length: 0.96 MilesDate:Estimate Type:
DESCRIPTION LOCAL STATE FEDERAL TOTAL0% 100% 0%
Construction Items$0 $322,000 $0 $322,000$0 $1,630,000 $0 $1,630,000$0 $0 $0 $0$0 $165,000 $0 $165,000$0 $0 $0 $0$0 $0 $0 $0$0 $0 $0 $0$0 $250,000 $0 $250,000$0 $0 $0 $0$0 $2,650,000 $0 $2,650,000$0 $0 $0 $0$0 $25,400 $0 $25,400$0 $0 $0 $0$0 $63,500 $0 $63,500$0 $5,100 $0 $5,100$0 $15,500 $0 $15,500$0 $108,000 $0 $108,000
Mobilization 5% $0 $262,000 $0 $262,000Other Items 10% $0 $550,000 $0 $550,000Const. Contingency 30% $0 $1,810,000 $0 $1,810,000 Const. Eng. & Inspec. 10% $0 $786,000 $0 $786,000
$0 $8,640,000 $0 $8,640,000Interchanges & Unique Intersections
Roundabouts $0 $0 $0 $0Interchanges $0 $0 $0 $0
Right-of-Way & Utilties LOCAL STATE FEDERAL TOTAL50% 50% 0%
Right-of-Way $2,400,000 $2,400,000 $0 $4,800,000 Utilities $865,000 $865,000 $0 $1,730,000Preliminary & Construction Engineering and Inspection Prelim. Eng. 9% $0 $772,000 $0 $772,000
$3,265,000 $12,635,000 $0 $ 15,900,000
Project Pearl - Singleton Station Road
Total Project Cost (2020)
Earthwork
October 2, 2020
Removal Items
Structures
Guardrail
Maintenance of Traffic
Widen to 3 Lane Rural Ditch, 6' Full Depth ShouldersIncludes new tie in for Singleton Station and Future Bridge App. EW
Pavement Markings
Description:
Signing
Construction-NewBlount
Concept
Construction Estimate
Asphalt Paving
Rip-Rap or Slope Protection
Clearing and GrubbingSeeding & Sodding
Appurtenances
FencingSignalization & Lighting
Concrete PavementDrainage
Railroad Crossing