INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my...

11
DONG TAM INDUSTRIAL ZONE JOINT STOCK COMPANY Address: Thuan Dao Industrial Park, Ben Luc Town, Ben Luc District, Long An Province Tel: (84-272) 363 1518 - Ext: 111, 113, 168, 105 Email: [email protected] Web: www.thuandao.com Hotline: (+84) 909.82 1368 - (+84) 935.82 1368 Contribution for community INDUSTRIAL PARK INDUSTRIAL PARK

Transcript of INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my...

Page 1: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

DONG TAM INDUSTRIAL ZONE JOINT STOCK COMPANYAddress: Thuan Dao Industrial Park,

Ben Luc Town, Ben Luc District, Long An ProvinceTel: (84-272) 363 1518 - Ext: 111, 113, 168, 105

Email: [email protected]: www.thuandao.com

Hotline: (+84) 909.82 1368 - (+84) 935.82 1368

Contribution for community

INDUSTRIAL PARK

INDUSTRIAL PARK

Page 2: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

Investor:

DONG TAM INDUSTRIAL ZONE JOINT STOCK COMPANY

Address : Thuan Dao Industrial Park, Ben Luc Town, Ben Luc District, Long An ProvinceTel : (84-272) 363 1518 Fax : (84–272) 363 1519 Email : [email protected] Web : www.thuandao.com

BUSINESS SCOPEIndustrial land for leaseReady-built factoryWarehouse, Bonded warehouse

AREASTotal area: 763 haPhase 1: 113 ha (100% occupied - 2009)Phase 2: 189 ha (95% occupied – 2017)Phase 3: 461 ha (Expected to put into operation in 2020).

INDUSTRIAL PARK

03

Page 3: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

Distance (km)

18 kmPHU MY HUNG RESIDENTIAL AREA

0.5 kmBOURBON PORT

20 kmTAN AN CITY

21 kmCENTER OF HO CHI MINH CITY

25 kmTAN SON NHATINTERNATIONAL AIR PORT

28 kmLONG ANINTERNATIONAL PORT

35 kmLONG THANH NTERNATIONAL AIR PORT

65 kmVIETNAM – CAMBDIA BORDER

42 kmCAT LAI PORT

75 km

30 minutes

3 minutes

30 minutes

45 minutes

50 minutes

40 minutes

45 minutes

90 minutes

60 minutes

120 minutesCAI MEP PORT

Time(minute)

TAY NINH PROVINCE

LONG ANPROVINCE

BEN TREPROVINCE

TIEN GIANGPROVINCE

BINH DUONGPROVINCE

DONG NAIPROVINCE

BA RIA - VUNG TAUPROVINCE

TRANG BANG

DI AN

CU CHI

THU THUA

CAN GIO

RICE MARKET

PHU MY

TRANG BOM

BA RIA

VINH BINH

TAN HOA

GO CONG

DUC HUE

Belt road no. 4

Belt

road

no. 3

Belt

road

no. 2

Hanoi Hig

hway

Vo Van Kiet

Nguyen Van Linh

National road no.51

National Road 1A

National road no.62

National road no.51

National ro

ad no.50

National road no.13

National road no.50

MY PHUOC

MY THO

TAN AN

VUNG TAU

BEN TRE

BEN LUC – LONG THANH Highway

Phu My bridge

HCMC – LONG THANH – DAU DAY Highway

BEN LUC

TAN SON NHAT INTERNATIONAL AIR PORT

THU DAU MOT

LONG THANHINTERNATIONAL AIR PORT

NATIONAL ROAD

MAIN NATIONAL ROAD

HIGHWAY

NEW HIGHWAY

COUNTRY ROAD/PROVINCIAL ROAD

BELT ROAD

HCMC – TRUNG LUONG – CAN THOHIGHWAY

BEN LUC - LONG THANHHIGHWAY

BIEN HOA - VUNG TAUHIGHWAY

Distance from THUAN DAO IP to:

CENTER

PORT NATIONAL ROAD 1A

BIEN HOA

TO CAMBODIA

SOAI RAP RIVER

LONG TAU RIVER

GO TO D

A LAT

GO TO THE NORTH

National Road no.22

GO TO MOC HOA

GO TO CAN THO

GO TO MEKONG DELTA AREA

Provincial road 830LONG AN INTERNATIONAL PORT

Prov

inci

al ro

ad 8

30

Prov

inci

al ro

ad 8

30

Provincial road 25B

GO TO CAN THO

Dong Nai River

REGIONAL MAP

05

Page 4: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

THUAN DAO INDUSTRIAL PARK‘S MASTER PLAN

07

Page 5: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

THUAN DAO INDUSTRIAL PARK’S DETAILED PLAN

LON

G CA

NG

– LON

G D

INH

STREET

PROVIN

CIAL RO

AD

16 

ROAD 11 

ROAD 10 

ROAD 9 

ROA

D 15 RO

AD

14 ROA

D 1 RO

AD

13 ROA

D 12 

BC141,42

Parking area

Channel, canal

Leased land

Land for lease 2014 - 2017

LOT AREA (ha)

Land for administration center

Land for power supply station

Land for water supply station

Land for waste water treatment plant

Landfill

Land for commercial service

123456

Land for future projects

Residential area

Land for fuel station

Mansion houses

Canteen

Worker hostels

789

101112

100% OCCUPIED

CURRENTLY LEASING

EXPECTED IN 2020

THUAN DAO IP: 113 ha

EXPANDING PHASE 01: 189 ha

EXPANDING PHASE 02: 461 ha

09

Page 6: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

Distance (km)

18 kmPHU MY HUNG RESIDENTIAL AREA

0.5 kmBOURBON PORT

20 kmTAN AN CITY

21 kmCENTER OF HO CHI MINH CITY

25 kmTAN SON NHATINTERNATIONAL AIR PORT

28 kmLONG ANINTERNATIONAL PORT

35 kmLONG THANH NTERNATIONAL AIR PORT

65 kmVIETNAM – CAMBDIA BORDER

42 kmCAT LAI PORT

75 km

30 minutes

3 minutes

30 minutes

45 minutes

50 minutes

40 minutes

45 minutes

90 minutes

60 minutes

120 minutesCAI MEP PORT

Time(minute)

TAY NINH PROVINCE

LONG ANPROVINCE

BEN TREPROVINCE

TIEN GIANGPROVINCE

BINH DUONGPROVINCE

DONG NAIPROVINCE

BA RIA - VUNG TAUPROVINCE

TRANG BANG

DI AN

CU CHI

THU THUA

CAN GIO

RICE MARKET

PHU MY

TRANG BOM

BA RIA

VINH BINH

TAN HOA

GO CONG

DUC HUE

Belt road no. 4

Belt

road

no. 3

Belt r

oad n

o. 2

Hanoi Hig

hway

Vo Van Kiet

Nguyen Van Linh

National road no.51

National Road 1A

National road no.62

National road no.51

National ro

ad no.50

National road no.13

National road no.50

MY PHUOC

MY THO

TAN AN

VUNG TAU

BEN TRE

BEN LUC – LONG THANH Highway

Phu My bridge

HCMC – LONG THANH – DAU DAY Highway

BEN LUC

TAN SON NHAT INTERNATIONAL AIR PORT

THU DAU MOT

LONG THANHINTERNATIONAL AIR PORT

NATIONAL ROAD

MAIN NATIONAL ROAD

HIGHWAY

NEW HIGHWAY

COUNTRY ROAD/PROVINCIAL ROAD

BELT ROAD

HCMC – TRUNG LUONG – CAN THOHIGHWAY

BEN LUC - LONG THANHHIGHWAY

BIEN HOA - VUNG TAUHIGHWAY

Distance from THUAN DAO IP to:

CENTER

PORT NATIONAL ROAD 1A

BIEN HOA

TO CAMBODIA

SOAI RAP RIVER

LONG TAU RIVER

GO TO D

A LAT

GO TO THE NORTH

National Road no.22

GO TO MOC HOA

GO TO CAN THO

GO TO MEKONG DELTA AREA

Provincial road 830LONG AN INTERNATIONAL PORT

Prov

inci

al ro

ad 8

30

Prov

inci

al ro

ad 8

30

Provincial road 25B

GO TO CAN THO

Dong Nai River

“ONE-STOP” SERVICEDONG TAM BRAND NAME

LARGE AVAILABLE WORKFORCELONG TERM LAND LEASE

VALUE – ADDED SERVICESCONVENIENT TRAFFIC

REASONS INVESTORS SHOULD CHOOSETHUAN DAOINDUSTRIAL PARK

TAX INCENTIVE FOR CORPORATE INCOME

CONVENTIONAL INDUSTRY

Tax rate for conventional industry corporate income is 20%

HIGH-TECH INDUSTRY

Tax rate for high-tech industry corporate income is 10% for the first 15 years

for first 02 years

for first 04years

Reduced by 50% for next 04 years

Reduced by 50% for next 09 years

Tax Fee

Tax Fee

Tax rate

Tax rate

0%

0%

50%

50%

11

Page 7: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

DIRECTION TO THUAN DAO IP

INVESTMENT INSTRUCTION

Within 15 working days

Within 07 working days

Within 07 working days

Within 20 working days

Within 20 working days

Within 30 working days

BUSINESS REGISTRATION (domestic company)INVESTMENT REGISTRATION (foreign company)

CONSTRUCTION LICENSE

LAND LEASE CONTRACT

LAND HANDOVER

HANDOVER OF LANDUSE RIGHT CERTIFICATE

CONSTRUCTION COMPLETIONPROCEDURE

CERTIFICATE OF OWNERSHIP

DURATIONTENANT AGREES TO RENT LAND

28 k

m

LONG AN INT’L PORT

BOURBON PORT PHU MY HUNG URBAN AREA

18 k

m

0.5

km

HO CHI MINH CITY CENTER

TAN SON NHAT INT’L AIRPORT CAT LAI PORTLONG THANH INT’L AIRPORT

42 k

m

21 k

m

35 k

m25 k

m

INDUSTRIAL PARK

13

Page 8: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

Projects ofDYEING AND GARMENT

Projects of POWER CABLE PRODUCTION

Projects ofBUILDING MATERIALS PRODUCTION

Projects ofMINERAL EXPLORATION, EXPLOITATION

Projects ofMECHANICS AND PLATING

Projects of NON-HAZARDOUS INDUSTRIAL WASTE

TREATMENT AND DISPOSAL

Projects of SPARE PARTS AND ACCESSORIES FOR

MOTOR VEHICLES AND MOTOR VEHICLES (Electric car, motorcycle and car )

Projects of TIMBER PROCESSING, GLASSWARE

AND CERAMIC PRODUCTION

Projects of CHEMICAL FERTILIZER

AND PLANT PROTECTION

Projects of FOOD PROCESSING

Projects of CHEMICALS, PHARMACEUTICALS AND

Projects of AGRICULTURAL PRODUCT PROCESSING

Projects of PAPER AND STATIONERIES PRODUCTION

Projects of FOOD PROCESSING FOR CATTLE, POULTRY

AND FISHERY

Projects of LPG/CNG DISTRIBUTION

AND EXTRACTION STATION

WELCOMES THE FOLLOWING INDUSTRIES

INDUSTRIAL PARK

15

Page 9: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

Taking Steps To A Greener Future

INVESTORS IN THUAN DAO IP

17

Page 10: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

TUNGTEX

INVESTORS IN THUAN DAO IP

19

Page 11: INDUSTRIAL PARK · tan hoa go cong duc hue. 4. 3 . 2 ay n kiet n linh.51 oad 1a.62.51.50.13.50 my phuoc my tho tan an vung tau ben tre ben luc – long thanh highway phu my bridge

PICTURE OF INFRASTRUCTURE IN THUAN DAO IP

21