INDUSTRIAL EE IN THE MALAYSIAN
MANUFACTURING SECTOR
(IEEMMS Project)
2
PROJECT OBJECTIVE
“To promote energy efficiency improvements
in the Malaysian manufacturing sector
through the implementation of National
Energy Management Standard and
application of System Optimization”.
3
FUNDING AGENCY
Global Environment Facility (GEF)
IMPLEMENTING AGENCY
UNIDO
EXECUTING AGENCY
MITI; SME Corp
PARTNERS
KeTTHA, NRE, ST, EPU, SIRIM, FMM, MIDA,
Dept of STANDARDS
4
Component Outcome
1. Development of a
national industrial
energy efficiency policy
and plans
Enhanced regulatory framework
facilitating increased implementation
of EE in the industrial sector
2. Awareness creation on
energy management and
systems optimization
Widespread awareness among SMEs
and larger industries of the benefits of
energy efficiency; strong interest by
industry (and other sectors
participating in EnMS, such as
institutional and government) in energy
management, systems optimization as
well as energy efficient equipment and
services in general.
5
3. Energy management
systems
A cadre of highly specialized energy
management experts from the public and
private sectors is available as a long-term
technical resource to industry and the
country.
4. Systems optimization A cadre of highly specialized systems
optimization experts from the public and
private sectors is available as a long-term
technical resource to industry and the
country.
5. Access to finance for
industrial EE improvement
SMEs and larger industries have
coordinated access to increased technical
and financial assistance for implementing
energy efficiency projects, including
system optimization
6
Energy Management System
(EnMS)
Capacity Building
7
The Three Components
½ day Awareness
Seminar2 day USER
Training
EXPERT
Training
Target group:
Top management
Objective:
To buy in EnMS, System Optimization (SO) and project technical assistance
Target group:
Management repr., energy managers and other personnel of enterprises
Objective:
Enable to start develop and implement EnMS
Target group:
EE consultants, ESCOs, ISO 14001 experts and others
Objective:
Equip to provide EnMS dev. & impl. TA and training to enterprises
8
2-Days User
Training Preparation
Expert
Module 1
Expert
Module 2
Expert
Module 3
Expert
Exam
Outputs:
1. EnMS
Expert
Selection
2. EnMS Tools
provided
Outputs:
1. EnMS core
team members
identified
2. EnMS self-
assessment
3. Factory
selection
Outputs:
1. Participant
trained in-depth
on EnMS Planning
2. EnMS
supporting tools
provided
Outputs:
1. Participant is
trained in-depth
on EnMS Checking
& Mgmt Review
2. EnMS
supporting tools
provided
Outputs:
Qualification as
an Energy
Management
System Expert
1 month 3 Days
11/7 - 13/7
5
mths
hs
3 Days
10/12 - 12/12
3 Days
24/4-26/4/13
4
mths
3-4
mths
TIME
Outputs:
1. Energy Policy
2. Significant Energy Uses
3. Baseline
3. Energy Performance
Indicator
5. Action Plans
Outputs:
1. Training delivered &
attended
2. Operations and controls
improved.
3. EE projects/measures
implemented
4. Energy & Costs Savings
Outputs:
1. Energy Performance
checked, verified and
reported.
2. Energy performance
reviewed by top
management.
3. Decisions for next period
Outputs:
1. Participant
trained in-depth on
EnMS
Implementation &
Operation
2. EnMS supporting
tools provided
EnMS – ISO 50001 Expert Program
9
Systems Optimization
Capacity Building
10
UNIDO System Optimization Capacity Building Programme
(Pumps, Fans, Air Compressors and Steam)
2 day USER
Training1/2 day VENDOR
Training
EXPERT
Training
Target group:
Enterprises staff and energy service
providers
Objective:
Enable basic SO measures develop and
implement
Target group:
Local equipment vendors, suppliers, etc
Objective:
Generate support and
synergies for project.
Support reshaping of
service offerings.
Target group:
EE consultants, service providers, experts,
factory representatives and others
Objective:
Enable to provide TA for SO dev. & impl. and train
enterprises
11
12
Benefits to Factories:
Receive assessment/report with complete set of data collected (FOC)
Great opportunity to harness potential savings measured without cost/investment in terms of expert consultation and accurate state of the art measurements (measurement tools/equipment will be provided during the training/assessment)
UNIDO has engaged world renowned International Experts for the program and their knowledge and expertise is to be shared with local engineers at the selected plant.
All cost related to the assessment will be borne by UNIDO.
13
Steel Industry in UNIDO IEE Portfolio
Egypt Ecuador
South Africa
Russian Federation
Philippines
Malaysia
Al Ezz Dekheila (EZDK)
Long and flat steel products
Capacity: 5.8 mio tons per year
Production: 3 mio tons/year
Arcelormittal Saldanha Works
Hot Rolled Coil
Capacity: 1.2 mio tons/year
Production: 1.2 mio tons/year
NOVACERO
Bars, rods and solid sections of
iron and steel
Production: 100,000 tons/year
Steel Asia
Steel reinforcing bars
Production: > 1 mio tons/year
UMMC – Steel
Rolled steel
Production: ̴ 1 mio tons/year
CSC Steel
Arcelormittal Vanderbijlpark
HRC & cold rolled & coated products
Employees: 4,500
Pag-asa Steel Works
Steel reinforcing bars
Employees: > 200
Iran
Sabah Steel
Amsteel Mills, Antara Steel Mills,
Southern Steel and Pewaja Steel
Oxin Steel
Esfahan Steel
COREX
DR-Plant
Steel shop
Mills
RHF Electricity demand : 160 MW
Manpower: 548 permanent employees
Sales output: 1,2 million ton HRC/annum
Arcelormittal
Saldanha Works
Energy Efficiency Achievements 2011
Energy Management System Implemented
No. of Projects/Measures 11
Total Capital Investment (USD) 0
2011 Gross Financial Savings (USD) 9,076,000
Overall Payback Period (in years) 0
2011 Energy Savings (GWh) 79.95
Adjustments/optimization of
production operation, energy
systems optimization, fuels
switching, etc..... driven by EnMS!
Energy Savings 2011-2014
460 GWh
South Africa IEE Project
14
Arcelormittal
Saldanha Works
South Africa IEE Project
15
Post-Combustion Cooling Radial
Fans System Optimization
Cost Savings (2011) R 262,000
Energy Savings (2011) 622 MWh
Cost of Project 0
Kg CO2 Savings 596 tons CO2
Energy performance improvement measures
Water Cooling System Optimization
Cost Savings (2011) R 1,371,680
Energy Savings (2011) 2,839 MWh
Cost of Project 0
Kg CO2 Savings 2,719 tons CO2
LPG Consumption Optimization
Cost Savings (2011) R 52,000,000
Energy Savings (2011) 62,005 MWh
Cost of Project 0
Kg CO2 Savings 14,881 tons CO2
Ladle Heating Station system optimization
Compressed-air Systems optimization
Increased EE awareness
Etc.
Al Ezz Dekheila
Steel Company
Egypt IEE Project
16
ID Energy Performance Improvement Opportunity
1 Installation of new Dry Rollers
2
Enhancing thermal insulation through:
- Using first class refractories (ceramic fibers & cast)
- Renewable of all hoppers along the tunnel furnace
- Exchange all damaged expansion joints of comustion air ducts
3 Calibration of Gas & Air valves and flowmeters
4 Gases Leak Detector
5
Maintain standard Air/Fuel ratio during natural gas burning
the reheating furnace to ensure complete combustion of the
natural gas.
6Keeping good insolation of the reheating furnace body in
order to eliminate any heat dissipation from the furnace body.
Energy Efficiency Achievements 2014
Annual Energy Savings (GWh) ̴ 167
Financial Savings (USD) 7,860,400
Total Implement. Cost (USD) 5,633,300
Overall Payback Period (month) < 9
Egypt - Benchmarking of Iron and Steel Sector
17
Benchmarking study based
on data collected from
participating companies
Companies that participated
in the benchmarking exercise
account for 76% of Egyptian
production
Egypt - Benchmarking of Iron and Steel Sector
18
19
CSC Steel Sdn Bhd- first iron and steel in Malaysia obtained ISO 50001:2011 (EnMS) certification in
Malaysia.
Implemented Energy Saving Measures Air conditioning systems (more efficient operation of chillers, reset air condition room temperature, installation of
self closing doors and use of window shades or solar films)
Lighting system (Use automatic timers for switches, switch off main power of application when not in use, switch
off computer when not in use, use of energy efficient lamps and use natural lights and LEDs
Motors, belts, drives (Variable speed drives and correct sizing)
Fans and pumps (sizing, throttling and variable speed control)
Waste Heat Recovery Systems (Stack flue temperature and leakage reduction)
Compressed Air System (Correct pressure setting, leakage and proper piping design)
Earth hour (promote awareness)
Heat recovery at Color Coating Line (CCL)
Water Pump Improvement
Results Achieved – Estimated savings of RM240,000/year
Program involved: EnMS Expert Program (Round 2), Compressed Air System Expert Program
(Round 2), Pump Expert System (Round 2) and Steam Systems Expert Program
Malaysian Case Studies
20
Steel Industries Sabah Sdn Bhd was founded in 1993. The Company's line of business includes the operation of
blast furnaces and steel mills.
Implemented Energy Saving Measures Tempcore Supply Pump (installation of VSD) – reduce consumption by 5%
Air Compressor (Leakage rectification and system upgrade) – reduce consumption by 5%
High Bay LED and office light replacement – reduce consumption by 50%
Awareness training
Program involved: EnMS Expert Program (Round 2) & Systems Optimization User Trainings
Malaysian Case Studies