Industrial Application of Two Stage Industrial Application of Two Stage Dry Pulverized Coal Gasification Dry Pulverized Coal Gasification Dry Pulverized Coal Gasification Dry Pulverized Coal Gasification Technology Technology Technology Technology Huaneng Huaneng Clean Energy Research Institute Clean Energy Research Institute Huaneng Huaneng Clean Energy Research Institute Clean Energy Research Institute Nov 2012 Nov. 2012

Transcript of Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project...

Page 1: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Industrial Application of Two Stage Industrial Application of Two Stage

Dry Pulverized Coal GasificationDry Pulverized Coal GasificationDry Pulverized Coal Gasification Dry Pulverized Coal Gasification

TechnologyTechnologyTechnologyTechnology

HuanengHuaneng Clean Energy Research InstituteClean Energy Research InstituteHuanengHuaneng Clean Energy Research InstituteClean Energy Research Institute

Nov 2012Nov. 2012

Page 2: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

ChiChi HH GGChina China HuanengHuaneng GroupGroup

The Largest Independent Power Company In China, No.2 in the

world.

Clean Energy Research Institute(HNCERI)Clean Energy Research Institute(HNCERI)Clean Energy Research Institute(HNCERI)Clean Energy Research Institute(HNCERI)Research on clean coal power generation

and renewable generation technologyand renewable generation technology.

Thermal Power Research Institute(TPRI)Thermal Power Research Institute(TPRI)A principal and leading research institute

in the field of thermal power engineering.Dr. Xu Shisen

President of HNCERI

Scientist of Gasification

Page 3: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

15 years efforts on coal gasification technology15 years efforts on coal gasification technology

•• The first stage—Theoretical Research and Simulation (1993~1997);

• Th d t B h S l E i t• The second stage—Bench Scale Experiments

(1997~2001);

• Th hi d Pil S l E i• The third stage—Pilot Scale Experiments

(2001~2005);

•• The fourth stage—Industrialization

(2006~);

Page 4: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Coal gasification and IGCCCoal gasification and IGCC

Pilot Scale:Pilot Scale: 36t/d(10MWth) ,2005

B h S l 0 7t/d 1998Bench Scale: 0.7t/d,1998Commercial Scale:1000t/d~2000t/d,2012

Page 5: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Gasifier Type:• Entrained flow• D f d• Dry feed• Pure oxygen• Water wall • Pressure: ~4.0MPa• Two Stages Reaction• Cold syngas efficiency: >81%Cold syngas efficiency: >81%• CO+H2>90%• Carbon conversion>99%•• Syngas cooler and quencher

Configuration of HCERI Two-stage Entrained Flow Gasifier

Page 6: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Syngas Cooler ProcessSyngas Cooler Process(SGC) Syngas Quencher Process

(SGQ)

Page 7: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG GreenGen ProjectCHNG GreenGen Project

Page 8: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

GreenGen Ltd CoGreenGen Ltd., Co.

The First IGCC Power Plant in China China Huaneng Group, Holding Company,

financial contribution 52%

China Datang Group 6%

China Huadian Corporation 6% China Huadian Corporation 6%

China Guodian Corporation 6%

China Power Investment Corporation 6% China Power Investment Corporation 6%

Shenhua Group 6%

St t D l t & I t t C 6% State Development & Investment Co. 6%

China Coal Group 6%

Peabody Energy USA 6%

Page 9: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG Green Gen ProjectCHNG Green Gen Project

Page 10: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG Green Gen Project

Design Points

CHNG Green Gen Project

Design Points

• SGC Process

• Gasifier Capacity: 2000t/d;

• Pressure: 3.0 MPa;;

• Entrained gas: N2

• Effective syngas flow(CO+H2+CH4): 137 600Nm3/h;• Effective syngas flow(CO+H2+CH4): 137,600Nm /h;

• Cold gas efficiency:83%;

• Eff ti t(CO+H +CH ) 91%• Effective component(CO+H2+CH4): 91%;

• Net Power: 250MW;

Page 11: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG Green Gen Project

Commissioning and Operation

CHNG Green Gen Project

• Apr.16th; 17h; Active Shutdown

• May 9th; 70h; Pulverized Coal Fill Filter LeakageMay 9th; 70h; Pulverized Coal Fill Filter Leakage

• May 27th; 31h; Misoperation

• Jun 9th; 27h; Syngas Pipe Leakage• Jun.9th; 27h; Syngas Pipe Leakage

• Jun.25th; 96h; Misoperation

J l 10th 16h Ai S t U it F lt• Jul.10th; 16h; Air Separator Unit Faults

• Jul.16th; 77h; Muffle Burn Out

• Agu.8th; 22h; Whole Plant Cooling Water Pipe Burst

• Agu.29th; 175h; Active Shutdown

Page 12: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG Green Gen Project

C O

CHNG Green Gen Project

Commissioning and Operation

• Gasification Unit Commissioning Work Finished• Gasification Unit Commissioning Work Finished

• Technological Process Proved

• Two Stage Gasification Experiment Finished• Two Stage Gasification Experiment Finished

• Different Kinds of Coal Tested

• Chinese Equipment and Instrument

• Technology Improvement

Page 13: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

GreengenGreengen GasifierGasifierStart TransportationStart Transportation

2929thth S 2010S 2010on 29on 29thth Sep. 2010Sep. 2010

Page 14: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG Green Gen Project

Performance Index (Shenhua bituminous)

CHNG Green Gen Project

Performance Index (Shenhua bituminous)

• Cold Gas Efficiency: 84.1%

• Oxygen consumptions: 303 Nm3/1000Nm3 CO+H2

• Coal consumptions: 580 kg/1000Nm3 CO+H2

• Syngas compositions: CO2<2%

• Steam produced: 150t/h

Page 15: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Key PointKey Point

Effects of The Second Stage Gasification

• The Second stage Coal Input Rate 5~6%• The Second stage Coal Input Rate 5 6%

• Total Carbine Reaction Rate >99%

• Cold Gas Efficiency Improved: 0 5 1%• Cold Gas Efficiency Improved: 0.5~1%

• Coal consumptions deceased: 4~8 kg/1000Nm3 Effective syngas

(CO H2)(CO+H2)

• Oxygen consumptions deceased : 10~20 kg/1000Nm3 Effective

(CO H2)syngas (CO+H2)

• Syngas temperature deceased:100~200 ℃

Page 16: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

CHNG Green Gen Project

Next Work

CHNG Green Gen Project

Next Work

• Gas Turbine Commissioning

• Whole Plant 72+24h Operation Acceptance Test

• Operation Optimization

Page 17: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Shili M th l P j tShilin Methanol Project

Page 18: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Shili M th l P j tShilin Methanol Project

Page 19: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Shili M th l P j t

Design Points

Shilin Methanol Project

Design Points

• SGQ ProcessG ifi C it 1000t/d• Gasifier Capacity: 1000t/d;

• Pressure: 4.0 MPa;

• Entrained gas: CO2Entrained gas: CO2

• Effective syngas flow(CO+H2): 71500Nm3/h;

• Cold gas efficiency:82%;

• Effective component(CO+H2) of dry syngas: 91%

• Methanol production: 300,000 t/a;

Page 20: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Shili M th l P j tCommissioning and Operation

Shilin Methanol Project

• Agu.9th; 1h; Misoperation

• Agu.27th; 22h; Pump FaultAgu.27th; 22h; Pump Fault

• Agu.29th; 43h; Instrument Wrong Signal

• Sep 15th; 15h; Misoperation• Sep.15th; 15h; Misoperation

• Sep.20th; 124h; Misoperation

S 28th 624h Still O ti• Sep.28th; 624h; Still Operating

Page 21: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Wh ?Why run so easy?

• Experience in Greengen Project

• System Simple

Page 22: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Shili M th l P j t

Performance Index(Shenhua bituminous)

Shilin Methanol Project

Performance Index(Shenhua bituminous)

• Cold Gas Efficiency: 83%

• Carbine Reaction Rate >99%

• Oxygen consumptions: 313 Nm3/1000Nm3 CO+H2

• Coal consumptions: 551 kg/1000Nm3 CO+H2

• Steam produced: 50t/h

Page 23: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

GasifierGasifier Arrives Arrives ShilinShilin Site Site on 20on 20thth Jul. 2010Jul. 2010

Page 24: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Shili M th l P j t

Next Work

Shilin Methanol Project

Next Work

• Operation Optimization

• Gasify lignite

Page 25: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

SGC & SGQSGC & SGQ

The Advantage of SGCThe Advantage of SGC

• Total Heat Recovery, Produce More Steam

• Lower Operation Cost

• Lower Water Consumption

The Advantage of SGQ

• Simple System

L I t t• Lower Investment

• Higher Operation Reliability

Page 26: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

C l iConclusions

• Realized Long Period Operation in Both Industrialized Units.

• Two Stage Gasification Technology Improved Gasification

Efficiency ,Deceased Coal and Oxygen Consumption.

• One Step Forward comparing with One Stage Gasification.

• SGC Process Low Operation Cost• SGC Process Low Operation Cost

• SGQ Process Low Investment

• Chinese Design, Equipment , Installation in Both Project.

Page 27: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

I F tIn Future

• Large scale Gasifier.

• Gasifier adaptability to Coal .

• Technology Improvement

Page 28: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Thank you for your attention !y y

Page 29: Industrial application of two stage gasification · 2016. 1. 25. · CHNG Green Gen Project Performance Index (Shenhua bituminous) CHNG Green Gen Project Performance Index (• Cold

Questions?

Contact: Guangyu Li

Director of GreenGen Department

Huaneng Clean Energy Research InstituteHuaneng Clean Energy Research Institute

Email:[email protected]

Phone: +8613572296264