Indonesian-German Renewables ForumPV Hybrid Systems
16-20 September 2013, Jakarta
Ingo Meyer I VP Sales & Marketingb+w Electronics Systems GmbH & Co. KG
Oberhausen, Germany
![Page 2: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/2.jpg)
page 2 April 24, 2023
PV-Hybrid DC Power Solutions For Unstable Grids On Wireless Sites
![Page 3: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/3.jpg)
page 3
Established in 1980
Central design and manufacturing in Oberhausen
Production of power systems opened in 1992
Nokia OEM partner for power units since 1992
Delivered over 100.000 power distribution units since 1992
Delivered over 70.000 systems since 1992
Quality Standards: ISO 9001:2000, ISO 14001Up to maximum 1.000 Systems per month
April 24, 2023
b+w Experience
![Page 4: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/4.jpg)
page 4
Headquarters, Oberhausen
April 24, 2023
b+w Experience
![Page 5: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/5.jpg)
page 5
*Source: Capgemini, Telecom, Media & Entertainment
Operating costs of tower infrastructure, like diesel generators, air-conditioning equipment, and security and site rentals, form a significant portion of nearly 60% of site expenses.*
60%of site expenses
April 24, 2023
Situation On Telecom Wireless Sites
![Page 6: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/6.jpg)
page 6
Source: Money Week 2012 4 17
Oil prices have been on everyone's mind, having spiked 141% over the last 3 years.
USD 141%
April 24, 2023
Oil Prices Go Up
![Page 7: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/7.jpg)
page 7 April 24, 2023
Green Field Site Solution: With SolarCube Low Energy Passively Cooled Outdoor Cabinet
![Page 8: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/8.jpg)
page 8
Shelter, Brazil SolarCube, Brazil
April 24, 2023
Case Study Brazil: SolarCube Vs. Shelter 87% savings
![Page 9: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/9.jpg)
page 9 April 24, 2023
Case Study Brazil: SolarCube Vs. Shelter 87% savings
![Page 10: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/10.jpg)
page 10
OPEX calculation from EADS shows a 87% energy saving with SolarCube vs. a Shelter.
87%energy saving
April 24, 2023
Case Study Brazil: SolarCube Vs. Shelter 87% savings
![Page 11: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/11.jpg)
page 11 April 24, 2023
Green Field Off Grid Site Solution: SolarCube + HybridCube Independent DC Power Supply
DC SolarCube plus HybridCubeSolar power and battery backup Supplemented with standby DC generator
Off grid wireless sites
![Page 12: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/12.jpg)
page 12
The b+w HybridCube is a compact independent off grid DC power supply system for outdoor telecom equipment utilising solar panels, diesel generator and batteries.
April 24, 2023
HybridCube Independent DC Power Supply
![Page 13: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/13.jpg)
page 13 April 24, 2023
Break Even Expected At 2 Years
![Page 14: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/14.jpg)
page 14
Conventional Shelters with DG Sets SolarCube Low EnergyPassively Cooled Outdoor Cabinet
HybridCube Hybrid PowerIndependentDC PowerSupply
April 24, 2023
Our Solution For A Typical Green Field Telecom Tower Infrastructure
![Page 15: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/15.jpg)
page 15 April 24, 2023
The Customer Benefits
b+w will help to improve your life for a better future.Let‘s get started.
![Page 16: Indonesian-German Renewables Forum PV Hybrid Systems 16-20 September 2013, Jakarta](https://reader035.fdocuments.us/reader035/viewer/2022062816/5681561a550346895dc3d720/html5/thumbnails/16.jpg)
page 16 April 24, 2023
Contact: Ingo MeyerVP Sales & Marketing
b+w Electronic Systems GmbH & Co. KGZur Eisenhuette 11
D-46047 OberhausenMobile: +49 163 2626675
Mail to: [email protected]