INDONESIA Power Transmission Dev FEMP (Eng)
-
Upload
cempaka-kaulika -
Category
Documents
-
view
222 -
download
0
Transcript of INDONESIA Power Transmission Dev FEMP (Eng)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
1/56
INDONESIA
POWER TRANSMISSION DEVELOPMENT PROJECTENVIRONMENTAL MANAGEMENT PLAN (EMP)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
2/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
LIST OF CONTENT
Section I : IntroductionSection II : Structure Of Environmental Management Plan (EMP)Section III : Mitigation and Monitoring PlansAnnex A : Brief Description of PLN Emergency Preparedness and
Response Procedures for Electric Power Substation
Annex B : PLN Worker Health and Safety Plan for Electric PowerSubstations
Annex C : Institutional Arrangements for Environmental ManagementAnnex D : Reporting ResponsibilitiesAnnex E : Supplementary Of EMPAnnex F : Result of Public ConsultationAnnex G : Clipping Of Public Consultation
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
3/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
SECTION I
INTRODUCTION
The project will consist of two main components and several subcomponents as follows :
COMPONENT 1: JAVA-BALI SYSTEM
SubcomponentA: Expand existing 500/150 kV Substation
Depok (West Java) add 1 transformer bay
Pedan (Central Java) add 1 transformer bayKrian (East Java) add 1 transformer bay
Balaraja (West Java) add 1 transformer bay
The expansions will all take place within the existing plant fence. There will be no land
acquisition, and mostly civil works to accommodate installation of the new equipment.
SubcomponentB: Construction of a new 150/20 kV Substation (Millineum)
The substation will be built on vacant land already owned by PLN. The land is
unproductive within an industrial park hosting a variety of industries (iron and steel mill,
food processing etc.). The substation will expedite power service to these industries.
SubcomponentC: Upgrade 150/20 kV Substations
Twenty two (22) substations will be upgraded by adding one (1) transformer bay, except
Sragen substation by adding two (2) transformer bays.
The expansions will all take place within the existing plant fence. There will be no land
i iti d tl i il k t d t th i t ll ti f th
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
4/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
SubcomponentB: Upgrade 150/20 kV Substations
Ten (10) substations will be upgraded by adding one (1) transformer bay.
The expansions will all take place within the existing plant fence. There will be no land
acquisition, and mostly civil works to accommodate the installation of the new
equipment.
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
5/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
SECTION II
STRUCTURE OF ENVIRONMENTAL MANAGEMENT PLAN (EMP)
In a generic sense, the environmental issues of several of the project subcomponents are
similar, and rather than present repetitive and identical mitigation and monitoring plans, single
generic plans for each of these types of projects will be presented.
Furthermore, since all subcomponents will be owned by PLN, the EMP aspects of: institutionalarrangements, occupational health and safety, and emergency preparedness and response
systems are established by corporate policy and will be the same for all of the subcomponents.
However, each subcomponent is unique in the sense that: (a) it is situated at its own unique
location, (b) public consultations would involve different affected groups, and (c) the outcome of
the public consultation may present special environmental or social issues.
As a result, the FEMP will assume the following format:
II.1 PROJECT DESCRIPTION
Very brief description of the nature of the investment and the physical location of the project site
(surrounding land use, nearest population centers, any areas of ecological or cultural interest,
rivers or lakes) for:
COMPONENT 1: JAVA-BALI SYSTEM
SubcomponentA:
1 D k S b t ti (W t J )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
6/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
SubcomponentB:
1. Millineum Substation (West Java)
It is located in Millenium Industrial Estate, Panongan, Tangerang. The location is
surrounded by steel industries. Nearest local residents about 3 km.
SubcomponentC:
1. Simpang Lima Substation
It is located in Gajah Mada Road, Semarang, Central Java. The location is surrounded bycommercial area and office.
2. Pati Substation
It is located on Panglima Sudirman Road, Pati, Central Java. The location is surrounded by
garden. Nearest local residents about 500 m.
3. Jekulo SubstationIt is located on Kudus-Pati Road, Tenggeles, Mejobo, Central Java. The location is
surrounded by home industry. Nearest local residents about 50 m.
4. Beringin Substation
It is located on Patimura Road km 1.2, Salatiga, Central Java. The location is surrounded
by residential. Nearest local residents about 50 m.
5. Pekalongan Substation
It is located on Urip Sumoharjo Road, Pekalongan, Central Java. The location is
surrounded by home industry (Batik) and residential. Nearest local residents about 50 m
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
7/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
7. Pandean Lamper Substation
It is located on Unta Raya Road, Semarang, Central Java. The location is surrounded by
commercial area and office.
8. Lomanis Substation
It is located on MT Haryono Road, Cilacap, Central Java. The location is surrounded by rice
farm and residential. Nearest local residents about 50 m
9. Kentungan Substation
It is located on Kaliurang Road Km.7, Yogyakarta, Central Java. The location is surrounded
by residential and rice farm. Nearest local residents about 50 m.
10. Tambak Lorok Substation
It is located in Semarang, Central Java. The location is near Tanjung Emas harbour.
Nearest local residents about 2 km.
11. Wonosobo Substation
It is located on Tumenggung Joyonegoro Road, Tawang sari, Wonosobo, Central Java. The
location is surrounded by tobacco garden. Nearest local residents about 500 m.
12. Klaten Substation
It is located on Gumulan village, Klaten, Central Java. The location is surrounded by rice
farm. Nearest local residents about 2 km
13. Solo Baru Substation
It is located in Sukoharjo, Surakarta, Central Java. The location is surrounded by private
d d id ti l N t l l id t b t 1 k
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
8/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
16. Ungaran Substation
It is located on Jendral Sudirman Road Km 23 Ungaran, Central Java. The location is
surrounded by big industry (food and beverage) and residential. Nearest local residents
about 300 m
17. Sanggrahan Substation
It is located on Sanggrahan, Magelang, Central Java. The location is surrounded by garden
and residential. Nearest local residents about 100 m
18. Gombong Substation
It is located on Puring Kalitengah Road, Gombong, Central Java. The location is
surrounded by garden and residential. Nearest local residents about 100 m
19. Majenang Substation
It is located on Majenang Road, Central Java. The location is surrounded by woodplantation, rubber garden and home industry (furniture). Nearest local residents about 100
m
20. Blora Substation
It is located on Gatot Subroto Road, Blora, Central Java. The location is surrounded by
garden and residential. Nearest local residents about 100 m
21. Bumiayu SubstationIt is located in Pegojenang village, Bumiayu, Brebes, Central Java. The location is
surrounded by garden and residential. Nearest local residents about 100 m
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
9/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
COMPONENT 2: SUMATRA SYSTEM
SubcomponentA:
1. 275 kV Lahat Substation
Land for extension of Lahat substation is on the coffee plantations that are owned by the
local community. It is located in South Sumatra Province, Lahat Regency, Pagar Agung
Sub District. The development of the 275 KV Lahat Main Substations is part of the
expansion of the existing LahatMain Substation that will require land in the width of + 3,1 hain a coffee, rubber and fruit plantation area owned by the community. Aside from the Main
Substation building land for the relocation line outside the existing Main Substation land for
4 electric towers with a area of @ 900m2 is also required. Two towers at the exsisting
location of main substation and the other two outside.
2. 275 kV Lubuk Linggau Substation
Lubuk Linggau substation is located in South Sumatra Province, Musi Rawas Regency,Lubuk Linggau West Sub District. The development of the 275 KV LubukMain Substations
is part of the expansion of the existing LubukMain Substation that will be built on an empty
lot that is available in the existing power station area. Land needed to be acquired is the
electric tower land for 3 electric towers with a area of @ 900m2 for the line relocation. The
area surrounding the Main Substation is an empty lot over grown with underbrush. It is
located quite far from the settlement areas.
3. Bangko Substation
Bangko substation is located in Jambi Province, Merangin Regency, Bangko Sub District.
The development of the 275 KV Bangko Main Substations is part of the expansion of the
S
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
10/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
available in the existing power station area. Land needed to be acquired is the electric tower
land for 3 electric towers with a area of @ 900m2 for the line relocation. The area
surrounding the Main Substation is an empty lot over grown with underbrush.
SubcomponentB:
1. Baturaja SubstationIt is located in Baturaja District, South Sumatra. The location is surrounded by garden and
residential. Nearest local residents about 100 m
2. Pagar Alam Substation
It is located in Pagar Alam District, South Sumatra. The location is surrounded by tea,
coffee plantation and residential. Nearest local residents about 500 m
3. 150 kV Lahat Substation
It is located in Pagar Agung, Lahat, South Sumatra. The location is surrounded by garden
and residential. Nearest local residents about 100 m
4. Prabumulih Substation
It is located in Prabumulih District, South Sumatra. The location is near oil refinery and gas
area which is 10 km from the substation. Nearest local residents about 500 m.
5. 150 kV Lubuk Linggau Substation
Lubuk Linggau substation is located in South Sumatra Province, Musi Rawas Regency,
L b k Li W t S b Di t i t Th di th M i S b t ti i t l t
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
11/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
9. PIP Substation
It is located in West Sumatra Province. The location is near industrial area. Nearest local
residents about 1 km.
10. Padang Luar Substation
It is located in Padang Luar District, West Sumatra Province. The location is near garden
and residential. Nearest local residents about 100 m.
II.2 PUBLIC CONSULTATION
Announcement Consultation Affected
Groups
Attending
Environment/
Social Issues
RaisedCOMPONENT 1 Media Date Location Date
Subcomponent A
Depok February12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
PedanFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
KrianFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Balaraja February12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Subcomponent B
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
12/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
12th,2010
12th,2010
12th,2010
12th, 2010 12th, 2010 2010
SecangFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Pandean LamperFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
LomanisFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th
,2010
KentunganFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Tambak LorokFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Wonosobo
February
12th,2010
February
12th,2010
February
12th,2010
February12th, 2010
February12th, 2010
February 12th
,2010
KlatenFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Solo BaruFebruary12th,2010
February12th,2010
February12th,2010
February12th, 2010
February12th, 2010
February 12th,2010
Semanu
February
12th,2010
February
12th,2010
February
12th,2010
February12th, 2010 February12th, 2010 February 12th
,2010
Sragen (2
t f )
February12th,
February12th,
February12th,
February12th 2010
February12th 2010
February 12th,2010
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
13/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
12th,2010
12th,2010
12th,2010
12th, 2010 12th, 2010 2010
COMPONENT 2 Media Date Location Date
Subcomponent A
275 kV Lahat
Informal consultation was conducted on January
21st-22nd 2010. The affected groups consist of 14
families who own the land, 8 were available for
consultation. While the informal consultation tookplace with other local residences from the
surrounding area. Questionnair were presented to
the people and discussed with PLN
representatives.
Local
residences
and land
owners
- Electro
magnetics
radiation issue
- Thedamage of
entrance road
will disturb
transportation
to grave yard
location.
275 kV LubukLinggau
February08th, 2010
February08th, 2010
February08th,2010
February08th,2010
February08th, 2010
February 08th,2010
BangkoFebruary08th, 2010
February08th, 2010
February08th,2010
February08th,2010
February08th, 2010
February 08th,2010
Muara BungoFebruary08th, 2010
February08th, 2010
February08th,2010
February08th,2010
February08th, 2010
February 08th,2010
Kiliranjo February08th, 2010
February08th, 2010
February08th,2010
February08th,2010
February08th, 2010
February 08th,2010
Subcomponent B (10)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
14/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
2010 2010
PIPFebruary08th, 2010
February08th, 2010
February08th,2010
February08th,2010
February08th, 2010
February 08th,2010
PayakumbuhFebruary08th, 2010
February08th, 2010
February08th,2010
February08th,2010
February08th, 2010
February 08th,2010
Padang LuarFebruary
08th
, 2010
February
08th
, 2010
February08th,2010
February08th,2010
February
08th
, 2010
February 08th,
2010
Any Environment/Social Issues raised would be included in the Supplementary EMPs for the
individual Subcomponents (see Annex D).
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
15/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
SECTION III MITIGATION AND MONITORING PLANS
GENERIC MITIGATION and MONITORING PLAN 1 (No Land Acquisition, Existing Substation Site)COMPONENT 1: JAVA-BALI SYSTEM
SubcomponentA: Depok Substation (West Java)
Pedan Substation (Central Java)
Krian Substation (East Java)
Balaraja Substation (West Java)
SubcomponentC: Twenty two (22) substation upgrades
COMPONENT 2: SUMATRA SYSTEM
SubcomponentB: Ten (10) substation upgrades
MITIGATION PLAN
Environment
impactMitigation actions Costs Responsible Start End
During construction
Dust The construction site will be sprinkled with water,
especially for hot, dry and windy conditions.
Minor, Included
in construction
contract
Construction
Contractor,
PT.PLN
PIKITRING
In the
beginning of
construction
After completion
of construction
Audible noise Construction activities will be performed only during
normal working hours (from 8 a.m. till 6 p.m.). If
construction activities have to be performed before
or after the specified time limits, the local society
must be notified about it at least one week in
advance.
No cost Construction
Contractor
PT.PLN
PIKITRING
In the
beginning of
construction
After completion
of construction
Environmental Management Plan (EMP) Page 15
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
16/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Non-toxic solid
wastes (metal,
packing and
used equipment,
etc.)
To be removed by license contract to places
specially allocated for landfills, approved by local
authorities
Minor, Included
in construction
contract
Construction
Contractor
PT.PLN
PIKITRING
In the
beginning of
construction
After completion
of construction
PCB
(polychlorinated
biphenyls)
Tender documents shall prohibit procurement of
equipment containing PCB
No cost,
Included in
construction
contract
Construction
Contractor
PT.PLN
PIKITRING
After
equipment is
delivered
After all
equipment is
delivered
Oil spill or leaks
fromconstruction
equipment
Repair leaking vehicles or do not permit on work site
Contaminated soils will be removed and disposed to
sites approved by local authorities
Oil sorbents will be kept on-site to contain any spills
Minor, Included
in constructioncontract
Construction
ContractorPT.PLN
PIKITRING
In the
beginning ofconstruction
After completion
of construction
Worker safety
from existing
electromagnetic
fields
Worker hours will be limited in accordance with
WHO exposure limits:
EMF Intensity (kV/M) Admissible exposure time
(min)
Up to 5 No limits5-10 Up to 180
10-20 Up to 30
20-25 Up to 10
>25 Prohibited
Warning signs to be placed at areas of high
electric/magnetic field strength
Minor, Included
in construction
contract
Construction
Contractor
PT.PLN
PIKITRING
In the
beginning of
construction
After completion
of construction
Environmental Management Plan (EMP) Page 16
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
17/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
During Operation
Audible noise Bidding documents specify noise level for
transformer and the cooling fan standard below 76
dBA
Minor, Included
in Operation
Cost
PLN P3B Java
Bali and PLN
P3B Sumatra
(operation and
maintenance
unit)
During
o
p
e
r
a
ti
o
n
Continuous
EMF All high voltage equipment will be wire-fenced or
placed in enclosures. Max EMF intensity allowed
outside the protected area will be 5 kV/m.
For security reasons the following stationary
protection will be used:
shielding-sheds over the disconnector operating
mechanisms,
circuit breaker control cubicles,
terminal boxes;
shielding-sheds over walkways of routine
inspection
Warning signs in areas of high electric/magnetic
field strength
Minor, Included
in Operation
Cost
PLN P3B JB
and PLN P3B S
During
operation
Continuous
Environmental Management Plan (EMP) Page 17
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
18/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Prevent soil and
ground water
contamination
as a result of oil
leak
Installation of oil collectors, made in compliance with
standard design solutions of precast concrete and
reinforced concrete elements, the bottom monolith
reinforced concrete slab made of sulfate-resistant
cement. Improved damp proof shall be done
underneath the slab.
Minor, Included
in Operation
Cost
PLN P3B JB
and PLN P3B S
During
operation
Continuous
Fire prevention Grass at substation territory shall be mowed;
mowed grass shall be removed from the territory of
a substation. Plants shall not be removed by
pesticides
Minor, Included
in Operation
Cost
PLN P3B JB
and PLN P3B S
During
operation
Continuous
Solid wastes Solid wastes shall be transported to special disposalplaces, approved by local government authorities.
Minor, Includedin Operation
Cost
PLN P3B JBand PLN P3B S
Duringoperation
Continuous
Emergency
Preparedness
and Response
See Annex A: PLN Emergency Preparedness and
Response Plan for Electric Power Substations
Minor, Included
in Operation
Cost
PLN P3B JB
and PLN P3B S
During
operation
Continuous
Worker Health
and Safety
See Annex B: PLN Worker Health and Safety Plan
for Electric Power Substations
Included in
Operation Cost
PLN P3B JB
and PLN P3B S
During
operation
Continuous
MONITORING PLAN
Environmental Management Plan (EMP) Page 18
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
19/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
During construction
Dust Daily
inspection
Construction
site and
access road
Visual inspection Daily Included
in
construct
ion
contract
Construction
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
Audible noise dB() Construction
site and
access road
Measurements to
be done under the
contract withspecialized
company holding
a license and
owing a certified
laboratory.
Monthly or if there
are complaints
Included
in
construction
contract
Construction
Contractor
PT.PLNPIKITRING
The
beginning of
construction
The end of
construction
Non-toxic solid
wastes (metal,
packing and
used
equipment, etc.)
Clarification
of
Contractors
license
expirationdate
Prior to
access to
construction
site
Visual inspection Prior to granting
access to
construction site
Included
in
construct
ion
contract
Construction
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
PCB
(polychlorinated
biphenyl)
Invoice for
equipment
At delivery
site
Visual inspection When equipment
has been delivered
Included
in
construct
ion
contract
Construction
Contractor
PT.PLN
PIKITRING
Arrival of
equipment
Arrival of
equipment
Environmental Management Plan (EMP) Page 19
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
20/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
Oil spill or leaks
from
construction
equipment
Vehicles
inspected for
leaks
Contaminate
d soil
removed
Sorbents
stored on-site
On-Site Visual Weekly or if there
are complaints
Included
in
construct
ion
contract
Construction
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
Worker safety
from existing
electromagnetic
fields
Worker
exposure
limits
followed
On-Site Visual Weekly Included
in
construct
ion
contract
Construction
Contractor
PT.PLN
PIKITRING
The
beginning of
construction
The end of
construction
During operation
Audible noise
dbA 2 meters
fromequipment
Noise meter Semi anually or If
there arecomplaints
Included
inOperatio
n Cost
PLN P3B JB,
PLN P3B S
Start of
operation
Continuous
Usage of ear
protectors by
the
personnel
Control of
workers at
substation
site
Visual Semi anually Included
in
Operatio
n Cost
PLN P3B JB,
PLN P3B S
Start of
operation
Continuous
Environmental Management Plan (EMP) Page 20
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
21/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
EMF Electric and
Magnetic
Field
intensity
In the area of
operation
and at the
fence
Electro meter and
Gauss meter
Semi anually Included
in
Operatio
n Cost
PLN P3B JB,
PLN P3B S
Start of
operation
Continuous
Prevent soil and
ground water
contamination
as a result of oilleak
Oil stains Over the
surface and
underneath
the oilcontaining
equipment
Possible leaks will
be inspected
visually
daily Included
in
Operatio
n Cost
PLN P3B JB,
PLN P3B S
Start of
operation
Continuous
Fire prevention Formation of
intensive
plant cover
At substation
site
Visual Approximately
monthly (depending
on rainfall
conditions)
Included
in
Operatio
n Cost
PLN P3B JB,
PLN P3B S
During
operation
Continuous
Solid wastes The storage
area
At substation
site
Visual Daily Included
in
Operatio
n Cost
PLN P3B JB,
PLN P3B S
During
operation
Continuous
Emergency
Preparedness
and Response
Requirement
s of
Emergency
Preparednes
s and
Response
Plan
At substation
site
Visual As required by Plan Included
in
Operatio
n Cost
PLN P3B JB,
PLN P3B S
During
operation
Continuous
Environmental Management Plan (EMP) Page 21
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
22/56
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
23/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
MITIGATION and MONITORING PLAN 2 (Land Acquisition, Adjacent to Existing Substation Site)
COMPONENT 2: SUMATRA SYSTEM
SubcomponentA: Lahat
Lubuk Linggau
Bangko
Muara Bungo
Kiliranjao
MITIGATION PLAN
Environment
impactMitigation actions Costs Responsible Start End
During construction
Environmental Management Plan (EMP) Page 23
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
24/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Land acquisition Land acquisition will be implemented prior to
construction. The RAP is there to guide the
implementation: the consultation with the assets
owners is to be done, compensation will refer to the
market price and negotiated forms and value.
Physical construction will not be done until after the
land acquisition (compensation payment) is finished
To be
d
e
t
e
r
m
i
n
ed
a
c
c
o
r
d
i
n
gI
n
d
o
n
e
s
i
PT. PLN Pikitring
SBS
Consultation Pre
construction
Environmental Management Plan (EMP) Page 24
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
25/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Soil erosion on
the substation
territory
Prepare drainage channel in order to avoid flood in
rainy day.
All vegetation will be removed mechanically or
manually no pesticides will be used.
included inc
o
n
s
tr
u
c
ti
o
n
c
o
n
tr
a
c
t
Construction
Contractor PT.
PLN Pikitring
SBS
In the
beginning of
construction
After
completion of
construction
Dust The construction site will be sprinkled with water,
especially for hot, dry and windy conditions.
included in
constructioncontract
Construction
Contractor PT.PLN Pikitring
SBS
In the
beginning ofconstruction
After
completion ofconstruction
Environmental Management Plan (EMP) Page 25
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
26/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Audible noise Construction activities will be performed only during
normal working hours (from 8 a.m. till 6 p.m.). If
construction activities have to be performed before
or after the specified time limits, the local society
must be notified about it at least one week in
advance.
No cost Construction
Contractor PT.
PLN Pikitring
SBS
In the
beginning of
construction
After
completion of
construction
Accidental Find
of Culturally
Significant
Artifacts
All construction activity works shall be suspended
until found artifact is inspected by provincial office of
Ministry of Tourism and Culture and official
permission to continue works is issued.
included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
beginning of
construction
After
completion of
construction
Non-toxic solid
wastes (metal,
packing and
used equipment,
etc.)
To be removed to places specially allocated for
landfills, approved by local authorities
Minor, Included
in construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
beginning of
construction
After
completion of
construction
PCB
(polychlorinated
biphenyls)
Tender documents shall prohibit procurement of
equipment containing PCB
No cost,
Included in
construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
After
equipment is
delivered
After all
equipment is
delivered
Oil spill or leaks
from
construction
equipment
Repair leaking vehicles or do not permit on work site
Contaminated soils will be removed and disposed to
sites approved by local authorities
Oil sorbents will be kept on-site to contain any spills
Minor, Included
in construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
beginning of
construction
After
completion of
construction
Environmental Management Plan (EMP) Page 26
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
27/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Worker safety
from existing
electromagnetic
fields
Worker hours will be limited in accordance with
WHO exposure limits:
EMF Intensity (kV/M) Admissible exposure time
(min)
Up to 5 No limits
5-10 Up to 180
10-20 Up to 30
20-25 Up to 10
>25 Prohibited
Warning signs to be placed at areas of high
electric/magnetic field strength
Minor, Included
in construction
contract
Construction
Contractor PT.
PLN Pikitring
SBS
In the
beginning of
construction
After
completion of
construction
During Operation
Audible noise Bidding documents specify noise level for
transformer and the cooling fan standard below 76
dBA
Minor, Included
in Operation
Cost
PLN P3B SDuring
o
p
e
r
ati
o
n
Continuous
Environmental Management Plan (EMP) Page 27
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
28/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
EMF All high voltage equipment will be wire-fenced or
placed in enclosures. Max EMF intensity allowed
outside the protected area will be 5 kV/m.
For security reasons the following stationary
protection will be used:
shielding-sheds over the disconnector operating
mechanisms,
circuit breaker control cubicles,
terminal boxes;
shielding-sheds over walkways of routineinspection
Warning signs in areas of high electric/magnetic
field strength
Minor, Included
in Operation
Cost
PLN P3B S During
operation
Continuous
Prevent soil and
ground water
contamination as
a result of oil
leak
Installation of oil collectors, made in compliance with
standard design solutions of precast concrete and
reinforced concrete elements, the bottom monolith
reinforced concrete slab made of sulfate-resistant
cement. Improved damp proof shall be done
underneath the slab.
Included in
Operation Cost
PLN P3B S During
operation
Continuous
Fire prevention Grass at substation territory shall be mowed;
mowed grass shall be removed from the territory of
a substation. Plants shall not be removed by
pesticides
Included in
Operation Cost
PLN P3B S During
operation
Continuous
Solid wastes Solid wastes shall be transported to special disposal
places, approved by local government authorities.
Included in
Operation Cost
PLN P3B S During
operation
Continuous
Environmental Management Plan (EMP) Page 28
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
29/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Emergency
Preparedness
and Response
See Annex A: PLN Emergency Preparedness and
Response Plan for Electric Power Substations
Included in
Operation Cost
PLN P3B S During
operation
Continuous
Worker Health
and Safety
See Annex B: PLN Worker Health and Safety Plan
for Electric Power Substations
Included in
Operation Cost
PLN P3B S During
operation
Continuous
MONITORING PLAN
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
During Construction
Land acquisition Monitoring will be done during the implementation of the landacquisition (LARAP)Monitoring will be conducted at all sites where land acquisition andassets compensation take place, at every stage of LARAPimplementation (consultation, inventory, negotiation, etc.)The method is to see the conformity of the implementation with theLARAP: consultation process, compensation scheme, certification,handling mechanism, etc. as provided in the LARAP document.
minorPLN Pikitring
SB
S
an
d
independent
team
Consultation 6 (six) month
after the
LARAP
implementation
.
Soil erosion on
the substation
territory
Evidence of
soil errosion
Substation
site
Visual inspection Daily, during rainy
day
Included
in
construct
ion
contract
Construction
Contractor
PLN Pikitring
SBS
The beginning
of
construction
The end of
construction
Environmental Management Plan (EMP) Page 29
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
30/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
Dust Daily
inspection
Construction
site and
access road
Visual inspection Daily Included
in
construct
ion
contract
Construction
Contractor
PLN Pikitring
SBS
The beginning
of
construction
The end of
construction
Audible noise dB() Construction
site and
access road
Measurements to
be done under the
contract with
specialized
company holdinga license and
owing a certified
laboratory.
Monthly or if there
are complaints
Included
in
construct
ion
contract
Construction
Contractor
PLN Pikitring
SBS
The beginning
of
construction
The end of
construction
Accidental Find
of Culturally
Significant
Artifacts
Evidence of
artifacts
Construction
site
Visual inspection Something is found Included
in
construct
ion
contract
Construction
Contractor
PLN Pikitring
SBS
The beginning
of
construction
The end of
construction
Non-toxic solid
wastes (metal,packing and
used
equipment, etc.)
Clarification
ofContractors
license
expiration
date
Prior to
access toconstruction
site
Visual inspection Prior to granting
access toconstruction site
Included
inconstruct
ion
contract
Construction
ContractorPLN Pikitring
SBS
The beginning
ofconstruction
The end of
construction
Environmental Management Plan (EMP) Page 30
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
31/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
PCB
(polychlorinated
biphenyl)
Invoice for
equipment
At delivery
site
Visual inspection When equipment
has been delivered
Included
in
construct
ion
contract
Construction
Contractor
PLN Pikitring
SBS
Arrival of
equipment
Arrival of
equipment
Oil spill or leaks
from
construction
equipment
Vehicles
inspected for
leaks
Contaminated soil
removed
Sorbents
stored on-
site
On-Site Visual Weekly or if there
are complaints
Included
in
construct
ion
contract
Construction
Contractor
PLN Pikitring
SBS
The beginning
of
construction
The end of
construction
Worker safety
from existing
electromagnetic
fields
Worker
exposure
limits
followed
On-Site Visual Weekly Included
in
construct
ioncontract
Construction
Contractor
PLN Pikitring
SBS
The beginning
of
construction
The end of
construction
During Operation
dbA 2 meters
from
equipment
Noise meter Semi anually or If
there are
complaints
Included
in
Operatio
n Cost
PLN P3B S Start of
operation
Continuous
Environmental Management Plan (EMP) Page 31
PT P N (P )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
32/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
Audible noise Usage of ear
protectors by
the
personnel
Control of
workers at
substation
site
Visual Weekly Included
in
Operatio
n Cost
PLN P3B S Start of
operation
Continuous
EMF Electric and
Magnetic
Field
intensity
In the area of
operation
and at the
fence
Electro meter and
Gauss meter
Semi anually Included
in
Operatio
n Cost
PLN P3B S Start of
operation
Continuous
Prevent soil and
ground water
contamination
as a result of oil
leak
Oil stains Over the
surface and
underneath
the oil
containing
equipment
Possible leaks will
be inspected
visually
daily Included
in
Operatio
n Cost
PLN P3B S Start of
operation
Continuous
Fire prevention Formation of
intensive
plant cover
At substation
site
Visual Approximately
monthly (depending
on rainfall
conditions)
Included
in
Operatio
n Cost
PLN P3B S During
operation
Continuous
Solid wastes Prevent soil
contaminatio
n
At substation
site
Visual Daily Included
in
Operatio
n Cost
PLN P3B S During
operation
Continuous
Environmental Management Plan (EMP) Page 32
PT PLN (P )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
33/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
Emergency
Preparedness
and Response
Requirement
s of
Emergency
Preparednes
s and
Response
Plan
At substation
site
Visual As required by Plan Included
in
Operatio
n Cost
PLN P3B S During
operation
Continuous
Worker Health
and Safety
Requirement
s of Worker
Health and
Safety Plan
At substation
site
Visual As required by Plan Included
in
Operatio
n Cost
PLN P3B S During
operation
Continuous
Environmental Management Plan (EMP) Page 33
PT PLN (P )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
34/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
GENERIC MITIGATION and MONITORING PLAN 3 (No Land Acquisition, New Site)
COMPONENT 1: JAVA-BALI SYSTEM
SubcomponentB: Millineum Substation
MITIGATION PLAN
Environment
impactMitigation actions Costs Responsible Start End
During Construction
Land use on the
substation
territory
Remove any fertile soil layer and store it in the
isolated area under plastic cover to prevent erosion
and protect from surface waters. After construction
is complete the fertile soil layer will be placed back
to its original location and original vegetation will be
restored.
All vegetation will be removed mechanically or
manually no pesticides will be used.
Minor, Included
i
n
c
o
n
s
tr
u
c
ti
o
n
c
on
tr
a
c
t
Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
Environmental Management Plan (EMP) Page 34
PT PLN (P )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
35/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Dust The construction site will be sprinkled with water,
especially for hot, dry and windy conditions.
Minor, Included
in construction
contract
Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
Audible noise Construction activities will be performed only during
normal working hours (from 8 a.m. till 6 p.m.). If
construction activities have to be performed before
or after the specified time limits, the local society
must be notified about it at least one week in
advance.
No cost Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
Accidental Find
of Culturally
Significant
Artifacts
All construction activity works shall be suspended
until found artifact is inspected by proper authorities
and official permission to continue works is issued.
Minor, Included
in construction
contract
Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
Non-toxic solid
wastes (metal,
packing and
used equipment,
etc.)
To be removed by license contract to places
specially allocated for landfills, approved by local
authorities
Minor, Included
in construction
contract
Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
PCB
(polychlorinatedbiphenyls)
Tender documents shall prohibit procurement of
equipment containing PCB
No cost,
Included inconstruction
contract
Construction
ContractorPT. PLN Pikitring
JBN
After
equipment isdelivered
After all
equipment isdelivered
Oil spill or leaks
from
construction
equipment
Repair leaking vehicles or do not permit on work site
Contaminated soils will be removed and disposed to
sites approved by local authorities
Oil sorbents will be kept on-site to contain any spills
Minor, Included
in construction
contract
Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
Environmental Management Plan (EMP) Page 35
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
36/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Worker safety
from existing
electromagnetic
fields
Worker hours will be limited in accordance with
WHO exposure limits:
EMF Intensity (kV/M) Admissible exposure time
(min)
Up to 5 No limits
5-10 Up to 180
10-20 Up to 30
20-25 Up to 10
>25 Prohibited
Warning signs to be placed at areas of high
electric/magnetic field strength
Minor, Included
in construction
contract
Construction
Contractor
PT. PLN Pikitring
JBN
In the
beginning of
construction
After completion
of construction
During operation
Environmental Management Plan (EMP) Page 36
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
37/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Audible noise Bidding documents specify noise level for
transformer and the cooling fan standard below 76
dBA
Minor, Included
in Operation
Cost
PLN P3B JB
Duringo
p
e
r
a
ti
o
n
Continuous
EMF All high voltage equipment will be wire-fenced or
placed in enclosures. Max EMF intensity allowed
outside the protected area will be 5 kV/m.
For security reasons the following stationary
protection will be used:
shielding-sheds over the disconnector operating
mechanisms,
circuit breaker control cubicles,
terminal boxes;
shielding-sheds over walkways of routine
inspection
Warning signs in areas of high electric/magnetic
field strength
Minor, Included
in Operation
Cost
PLN P3B JB During
operation
Continuous
Environmental Management Plan (EMP) Page 37
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
38/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impactMitigation actions Costs Responsible Start End
Prevent soil and
ground water
contamination as
a result of oil
leak
Installation of oil collectors, made in compliance with
standard design solutions of precast concrete and
reinforced concrete elements, the bottom monolith
reinforced concrete slab made of sulfate-resistant
cement. Improved damp proof shall be done
underneath the slab.
Minor, Included
in Operation
Cost
PLN P3B JB During
operation
Continuous
Fire prevention Grass at substation territory shall be mowed;
mowed grass shall be removed from the territory of
a substation. Plants shall not be removed by
pesticides
Minor, Included
in Operation
Cost
PLN P3B JB During
operation
Continuous
Solid wastes Solid wastes shall be transported to special disposal
places, approved by local government authorities.
Minor, Included
in Operation
Cost
PLN P3B JB During
operation
Continuous
Emergency
Preparedness
and Response
See Annex A: PLN Emergency Preparedness and
Response Plan for Electric Power Substations
Minor, Included
in Operation
Cost
PLN P3B JB During
operation
Continuous
Worker Health
and Safety
See Annex B: PLN Worker Health and Safety Plan
for Electric Power Substations
Minor, Included
in Operation
Cost
PLN P3B JB During
operation
Continuous
MONITORING PLAN
Environmental Management Plan (EMP) Page 38
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
39/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
During ConstructionLand use on the
substation
territory
Methods and
place of
fertile soil
storage
Fertile soil
storage
areas
Visual inspection Weekly, during site
preparation
Minor,
Included
in
construct
ion
contract
Construction
Contractor
PT. PLN
Pikitring JBN
The beginning
of
construction
The end of
construction
Dust Daily
inspection
Construction
site and
access road
Visual inspection Daily Minor,
Included
in
construct
ion
contract
Construction
Contractor
PT. PLN
Pikitring JBN
The beginning
of
construction
The end of
construction
Audible noise dB() Construction
site and
access road
Measurements to
be done under the
contract with
specialized
company holding
a license and
owing a certifiedlaboratory.
Monthly or if there
are complaints
Minor,
Included
in
construct
ion
contract
Construction
Contractor
PT. PLN
Pikitring JBN
The beginning
of
construction
The end of
construction
Non-toxic solid
wastes (metal,
packing and
used
equipment, etc.)
Clarification
of
Contractors
license
expiration
date
Prior to
access to
construction
site
Visual inspection Prior to granting
access to
construction site
Minor,
Included
in
construct
ion
contract
Construction
Contractor
PT. PLN
Pikitring JBN
The beginning
of
construction
The end of
construction
Environmental Management Plan (EMP) Page 39
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
40/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
PCB(polychlorinated
biphenyl)
Invoice forequipment
At deliverysite
Visual inspection When equipmenthas been delivered
Minor,Included
in
construct
ion
contract
ConstructionContractor
PT. PLN
Pikitring JBN
Arrival ofequipment
Arrival ofequipment
Oil spill or leaks
from
construction
equipment
Vehicles
inspected for
leaks
Contaminate
d soil
removed
Sorbents
stored on-
site
On-Site Visual Weekly or if there
are complaints
Minor,
Included
in
construct
ion
contract
Construction
Contractor
PT. PLN
Pikitring JBN
The beginning
of
construction
The end of
construction
Worker safety
from existing
electromagneticfields
Worker
exposure
limitsfollowed
On-Site Visual Weekly Minor,
Included
inconstruct
ion
contract
Construction
Contractor
PT. PLNPikitring JBN
The beginning
of
construction
The end of
construction
Environmental Management Plan (EMP) Page 40
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
41/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
During Operation
Audible noise dbA 2 meters
from
equipment
Noise meter Semi anually or If
there are
complaints
Included
in
Operatio
n Cost
PLN P3B JB Start of
operation
Continuous
Usage of ear
protectors bythe
personnel
Control of
workers atsubstation
site
Visual Semi anually Included
inOperatio
n Cost
PLN P3B JB Start of
operation
Continuous
EMF Electric and
Magnetic
Field
intensity
In the area of
operation
and at the
fence
Electrometer and
Gauss meter
Once after
substation
commissioning to
verify the
compliance with the
design parameters
Included
in
Operatio
n Cost
PLN P3B JB Once, in the
beginning of
operation
Continuous
Prevent soil and
ground water
contamination
as a result of oil
leak
Oil stains Over the
surface and
underneath
the oil
containing
equipment
Possible leaks will
be inspected
visually
daily Included
in
Operatio
n Cost
PLN P3B JB Start of
operation
Continuous
Environmental Management Plan (EMP) Page 41
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
42/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
Fire prevention Formation ofintensive
plant cover
At substationsite
Visual Approximatelymonthly (depending
on rainfall
conditions)
Includedin
Operatio
n Cost
PLN P3B JB Duringoperation
Continuous
Solid wastes The storage
area
At substation
site
Visual Daily Included
in
Operatio
n Cost
PLN P3B JB During
operation
Continuous
Emergency
Preparedness
and Response
Requirement
s of
Emergency
Preparednes
s and
Response
Plan
At substation
site
Visual As required by Plan Included
in
Operatio
n Cost
PLN P3B JB During
operation
Continuous
Worker Health
and Safety
Requirement
s of Worker
Health and
Safety Plan
At substation
site
Visual As required by Plan Included
in
Operatio
n Cost
PLN P3B JB During
operation
Continuous
Environmental Management Plan (EMP) Page 42
PT PLN (P )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
43/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX A: BRIEF DESCRIPTION OF PLN EMERGENCY PREPAREDNESS AND
RESPONSE PROCEDURES FOR ELECTRIC POWER SUBSTATIONS
- Pro-SMK3-009_Tanggap Darurat Kebakaran ( Fire Emergency Respons )
This procedure consists of action required fire emergency respons, explosives or any
emergency situation, and serious injury to workers in company operation.
- Pro-SMK3-011_Informasi Keadaan Darurat (Emergency Situation Information)This procedure consists of potential emergency situation that may happen in PLN
operation and maintenance unit. The following information should be always in notice
board at the substation, emergency and first aid officer name, contact phone number,
emergency ecvacuation map.
- Pro-SMK3-012_Keadaan Darurat (Emergency Situation)
This procedure consists of Fire, Explosion, Bomb Threat, suspect package, Hazardousmaterial spill/toxic emissions, threat of riot, motor vehicle accident, and other hazard.
- Pro-SMK3-005_Pelatihan dan Kompetensi (Training and Competence)
This procedure describe the responsibility of administration and Human Resource
Department to implement the procedure : to assess capacity and training needs as well
as the guidance to train the operational staffs.
- Pro-SMK3-001_Identifikasi Bahaya (Hazards Identification)
This procedure describe how to identify hazards, risk assessment including how to
manage risk as result of activities, product and services.
PT PLN (P )
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
44/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
This procedure describe the technical and administrative information on fire fighying
equipment require for all employee in particular to relevant personel related to
procurement and maintenace.
- Pro-SMK3-014_Penyelidikan Kecelakaan (accident Investigation)
This procedure consist of reporting procedure during incidents, accidents, and
occupational sickness to the PLN stafs, contractor and visitor.
- Pro-SMK3-015_Pelaporan Bahaya (Hazard Reporting)Hazard report aplies to reporting to any health and safety issues except for worker
injury. This procedure applies to all stafs and contractors.
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
45/56
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
46/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
This procedure is to manage all aspects related to hazardous material including safe
handling, storage and transportation of hazardous materials.
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
47/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX C: INSTITUTIONAL ARRANGEMENTS FOR ENVIRONMENTAL MANAGEMENT
Action Institutional Responsibility
Monitoring Data Collection
Construction
Operation
Construction Contractor /PT.PLN (Persero)PIKITRING
Operation (from Monitoring Plan by PLNP3B JB and P3B S)
Data Analysis
Construction
Operation
Construction Contractor , PT.PLN(Persero) PIKITRING
Operation PT.PLN (P3B JB and P3B S)
Environmental Report Preparation
Construction
Operation
Construction Contractor / PT.PLN(Persero) PIKITRING
Operation PT.PLN (P3B JB and P3B S)
Environmental Report Receipt/Frequency (Who receives report/how often)
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
48/56
PT PLN (Persero)Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Note : Monitoring the implementation of the document Environmental Management Plan
(EMP) will be conducted by environmental staff in the unit responsible for activities
related to ( PT.PLN PIKITRING and PT. PLN P3B ) with the budget by PT.PLN Persero).
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
49/56
( )Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX D REPORTING RESPONSIBILITIES
Environmental Management Plan (EMP) Page 49
Report Type Primary Report Secondary Report Tertiary ReportBy To Frequency By To Frequency By To Frequency
Siteenvironmentmanagement
Contractor PLNPikitring
Once beforeconstructionbegin andmonthlythereafter
- - - - - -
Environmentperformancemonitoring
duringconstruction
Environmentstaff ofPikitring
PLNPikitring
Monthly PLNPikitring
PLN PlanningDept/Environ-ment
Dept
Six-monthly
PLNPlanning
Dept
WB Six-monthly
Environmentperformancemonitoringduringoperation
EnvironmentStaff of P3B
P3B Six-monthly P3B PLN EnvironmentDept
Annually - - -
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
50/56
( )Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX E SUPPLEMENTARY EMP
275 KV LAHAT SUBSTATION SUPPLEMENTARY MITIGATION PLAN
Environmentimpact
Mitigation actions Costs Responsible Start End
During Construction
The damage of
entrance road
will disturb
transportation to
grave yard
location.
Maintain the existing road so not to disturb the grave
yard site
Include in
Construction
Cost
Construction
contractor PT.
PLN Pikitring
SBS
In Beginning
of
construction
In end of
construction
MONITORING PLAN
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
During Construction
The damage of
entrance road
will disturb
transportation to
grave yard
location.
Local
complains
Project site Communication
with local people
Continuous Include
in
Construc
tion Cost
Construction
contractor
PT. PLN
Pikitring SBS
In Beginning
of
construction
In end of
construction
Environmental Management Plan (EMP) Page 50
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
51/56
( )Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
MILLENIUM SUBSTATION SUPPLEMENTARY MITIGATION PLAN
Environment
impactMitigation actions Costs Responsible Start End
During Construction
MONITORING PLAN
Environment
impact
Monitoring
parameter
Place of
monitoringMonitoring
method
Monitoring
scheduleCost Responsible Start End
During Construction
Environmental Management Plan (EMP) Page 51
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
52/56
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX F
RESULT OF PUBLIC CONSULTATION
1. Public consultation for the Lahat substation conducted by informal consultations on the date of 21 to 22 January 2010 inapproximately the location of the Lahat substation, precisely Pagar Agung Village, District Lahat, South Sumatra.
Consultation conducted by distributing questionnaires and asked to answer 8 of 14 pemilk project-affected land and the
residents around the site. FAQ sheets distributed to participants and discussed with representatives of PLN. Existing
environmental issues in the community during the consultation is the problem of electric and magnetic fields from
transmission towers and so when the construction does not damage the existing road so as not to disturb the grave yard.
The response from the responsible dissemination PT.PLN PIKITRING SBS: In the construction of the Lahat main substation
there is no tower that was built for the relocation of the path, will pass through the residential population and to answer the
second environment issue , the construction contract documents construction and electricity transmission networks main
substation mentioned that any damage caused by the development / construction activities during the responsibility will be the
third party (contractor) including roads to the project site, so if any damage will be repaired by the contractor as before.
2. Public consultation for the Millennium substation performed by Formal Consultation (Socialization) held on January 29, 2010
at the Millennium Industrial Estate between representatives of PLN, Developer and Tenant Millennium Industrial Estate.
Socialization is done by asking the opinion about the construction of the Millennium Master relay to the Millennium Industrial
Estate Tenant and residents in the surrounding region. There are no environmental issues in the implementation of the relay
location due to socialization Mother Millennium is located in the Industrial Estate. Participants expect the development of
socialization Main substation implemented immediately to support productivity and electricity factory and surrounding areas
area.
Environmental Management Plan (EMP) Page 52
PT PLN (Persero)
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
53/56
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
ANNEX G
CLIPPING OF PUBLIC CONSULTATION
Sriwijaya POST, February 8th 2010
Environmental Management Plan (EMP) Page 53
PT PLN (Persero)Jl T j Bl k M 1/135 K b B J k t 12160
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
54/56
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
Suara Merdeka, February 11th 2010
Environmental Management Plan (EMP) Page 54
PT PLN (Persero)Jl T j Bl k M 1/135 K b B J k t 12160
-
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
55/56
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
http://www.pln-pikitringsbs.co.id/index.php?option=com_content&view=category&layout=blog&id=2&Itemid=3
Environmental Management Plan (EMP) Page 55
PT PLN (Persero)Jl T j Bl k M 1/135 K b B J k t 12160
http://www.pln-pikitringsbs.co.id/index.php?option=com_content&view=category&layout=blog&id=2&Itemid=3http://www.pln-pikitringsbs.co.id/index.php?option=com_content&view=category&layout=blog&id=2&Itemid=3 -
8/6/2019 INDONESIA Power Transmission Dev FEMP (Eng)
56/56
Jl. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta 12160Telp. (021) 7251234, 7250550, 7261875,7261122, 7262234Fax. (021) 7221330, Kotak Pos 4322/KBB
http://www.plnpijbn.co.id/home.php?mod=newsdetail&id=403
Environmental Management Plan (EMP) Page 56
http://www.plnpijbn.co.id/home.php?mod=newsdetail&id=403http://www.plnpijbn.co.id/home.php?mod=newsdetail&id=403