Indofil Industries
-
Upload
prabhjot-bakshi -
Category
Documents
-
view
505 -
download
6
Transcript of Indofil Industries
CHAPTER 1
General Information
Background of the company:
In 1962 the company started as a subsidiary of a US based company known as Rohm Haas ltd.
In 1982 the subsidiary got separated from Rohm Haas ltd. And Mr. K K Modi started it as a division Modipon Ltd.
In 2007 it started as a division of Indofil Organics Industries ltd. In 2010 it was renamed as Indofil Industries ltd. It is a part of K K Modi Group – Modi enterprise An industrial corporation with diverse business. Modi enterprise has a group asset value of Rs. 28000 crores.
Fig 1
INDOFIL INDUSTRIES COMPANY –
It belongs to the renowned K. K. MODI GROUP OF COMPANIES.
The Management of INDOFIL constitutes a BOARD OF DIRECTORS, with great experience and wisdom. EXCELLENCE as a Foundation and WINNING as a Passion is what describes our Group Chairman, MR. K. K. MODI, who continuously steers his group companies to reinvent and redefine themselves!
1
Modi enterprise
Indofil industries
Godfrey Phillips India ltd.
Modi Entertainment
Modicare Ltd.
Modi Apollo International Institute
ITSPL
Fashion TV India
INDOFIL INDUSTRIES LIMITED, established more than four decades ago, headquartered in Mumbai, a research-led and fully integrated Chemical Company has EMERGED as a successful and vibrant enterprise, riding high on a simple philosophy of retaining loyalty and enlarging the fold of satisfied customers.
Head office: Andheri, Mumbai
CEO: Mr. R K Malhotra, Head of Marketing
Chairman- Mr. K K Modi
HOD HR- Dr. Avinash Deolekar, Senior Vice President
Finance Head: Mr. Sunil Patel, Sr. Vice President
Indofil Industries – Business division:
Indofil Industries Limited is uniquely placed both in Agricultural Chemicals (ABD) as well as Specialty & Performance Chemicals (S&PC) Business. As a part of K. K. Modi group, Indofil has a well-equipped manufacturing infrastructure, a result oriented Research & Development team, and an excellent domestic and international distribution network.
Known around the world as "The Mancozeb People", Indofil has its export presence in more than 50 countries as suppliers of Mancozeb formulations. In India, Indofil is successful in strategic marketing of Insecticides including IGR's, Fungicides (Mancozeb, Tricyclazole, and Zineb etc), Bactericides, Herbicides, Acaricides, Surfactants, and Plant Growth Regulators (PGR). Indofil is driven by "Crop Care Concept" in agriculture business. The focus is to create partnerships for Research & Development, manufacturing & marketing for many more active pesticides & combinations.
Specialty and Performance business works with the philosophy to be a solution provider by innovative products for various industries viz. Leather, Textile, Paints, Plastics and Construction Chemicals.
The Company's long and successful past also provides customers with the assurance that Indofil will continue to be a valued partner long into the future.
Fig 2
2
Indofil Industries
Agricultural Chemicals
Speciality & Performance Chemicals
International Business
Research & Development
Agricultural chemicals:
Fig 3
Speciality & Performance Chemicals
Fig 4
3
Agricultural chemicals
fungicides
insecticides
herbicides
Surfactants
PGR's
Leather chemicals
Plastics chemicals
Construction chemicals
Textile chemicals
Paper chemicals
Coating chemicals
International business:
It is spread across the globe in Australia, Africa, New Zealand, India, France, Germany, Paris, etc.
Indofil Industries ltd. Is a market leader in:-
Fungicides- fruits/ vegetables Fungicides- Paddy/ Peanuts Herbicides- Onions Acaricids- Tea/ Vegetables Insecticides- IGRs Surfactants
Its Manufacturing units are placed in Thane, Pune, Vapi and Dahej.
Its regional offices are placed in Punjab, Uttar Pradesh, Bihar, West Bengal, Maharashtra, Andhra Pradesh, Karnataka and Tamil Nadu.
MOMENTS OF PRIDE:
Received many awards like:
Asia star World star India star PFFCA state “Best company from an emerging region”- Agrow Awards Nov 2010, London
Growth trend
In 2005- 2006 – 322 mt
In 2006- 2007 – 233 mt
In 2007- 2008 – 466 mt
In 2008- 2009 – 597 mt
In 2009- 2010 – 740 mt
In 2014- 2015 – 4000 mt
INDOFIL Industries ltd. Dahej:
Company profile:
Bhoomi Pujan: 19th April ‘08 Construction started: August ‘08 Plant Completion: June ‘09 1st Export: August ‘09
4
Strength of team Dahej:
They are working on:o Productivity improvement
o Time cycle Reduction
o Cost Reduction
o Efficiency Utilization
Quality conscious Committed employees Believe in “TEAM”
Milestones since inception:
Project completed and commissioned in a record time of 1 year. Highest daily production
o 67 metric tonnes on 14th Dec. ‘10
o 81 metric tonnes on 25th Jan. ‘11
Growth trend- Dahej Plant
In 2009 – 2010- 78.98 mt In 2014- 2015- 4000 mt
Investment in Plant and Machinery:
The initial investment in plant and Machinery in the year 2009 was Rs. 150 crores
Future expansion plans:
To set up a new plant in collaboration with a Chinese company within few years. To set up a speciality chemical plant in Dahej
Present manpower status:
Employee strength:Permanent: 114Contract labour: 130Total: 244 (approx)
Organisational Structure:
5
Mr. Anil K. Gupta (G.M.)M
r. As
hish
Des
aiD
eput
y M
agr.
HR
Mr.
Dili
p D
ubey
Sr. M
gr. E
HS
Mr.
S.N
. Pan
dey
Sr. M
gr. P
rodu
ction
Mr.
Anil
P. G
upta
Sr. M
gr A
ccou
nts
Mr.
Um
esh
Chau
dhry
Sr. M
gr. Q
C/Q
A
Dr.
M.A
. Triv
edi
Chie
f Mgr
. Log
istic
s
MR.
M M
Kha
dkka
rSr
. Mgr
Tec
hnic
al
Mr.
Vine
et D
obal
M
gr. M
aint
enan
ce
Mr.
Khat
riSr
. Exe
cutiv
e
Elec
tric
al
Mr.
Vish
al P
arek
hSr
. Exe
cutiv
e In
stru
men
ts
Fig 5
Types of Communication channels:
FORMAL (written)
E-mails Magazines Circulars Notices
INFORMAL (mostly verbal)
Intercoms Mobile phones Open forum
Vertical and Horizontal communication applied.
Unlike Govt. Communication there is direct & cross functional communication.
It believes in Breaking Chain of command.
Present Product mix:
6
Fig 6
Competitive Scenario:
Regional and National competition- UPL
(Agro business) Sabero Organics
Overall Organisational culture
Employees are associated with the company for many years Employees are committed to their work and their company. Employees believe in team work.
Indofil is an organization where the atmosphere is professional and the culture is warm,
informal and open. The company believes in an open door policy, freedom to experiment
and a free exchange of thoughts. To encourage this, there are various forums of
communication, such as the staff meets for junior level management grades. The basic
idea is to have a broad platform for an open dialogue. An in-house journal called “Indofil
Hilites” is circulated amongst all employees quarterly.
The company gives significant importance to the development of employees through training
and allocates substantial budgets every year. Employees are put through technical training
and skill development training related to the specific jobs which they are expected to do.
Also there exists a systematic way of identifying specific training needs of the employees
during the Performance Appraisal.
7
Mancozeb
Mancozeb 80% W.F.
Mancozeb 85% Technical
Mancozeb flowable liquid
Mancozeb 75% W.G. Grannuals
Strategies for Future growth and development and Benchmarking
Diversification To develop in house production of the raw material To set up new businesses To cover the European market.
Here the strategic group is known as “Growth office”.
Growth office consists of different personalities who have mastered in their fields, like Finance, Marketing, Human Resource, Production, etc.
Vision statement
“Global leader in growth with customer success”
The VISION of INDOFIL is equally simple - to focus on specific opportunities, drive growth and enhance value for esteemed customers. It has a highly skilled and successful sales team that believes in learning and working with the customers as PARTNERS - thus developing the products and services around core issues, to meet their future needs.
Employing 705 people, INDOFIL has a sales turnover of Rs. 782 crores, as on 31st March, 2010.
INDOFIL has a very strong domestic base and a well recognized international presence. Both businesses, Agricultural Chemicals and Specialty & Performance Chemicals, are poised for much faster growth by partnering/joint ventures for manufacturing, marketing and research and development activities with prospective companies across the world.
INDOFIL which is a very strong Company is professionally managed by its CHIEF EXECUTIVE OFFICER & PRESIDENT, MR. R. K. MALHOTRA, a Post Graduate in Agriculture with 35 years "hands-on" experience and is an active and advisory member of various related Technical and Trade Associations.
The Company believes in Complete Team working, Team winning strategies and innovation in its products, services and business processes with an unending urge to excel.
Mission statement
8
Fig 7
Values:
Customer success: Believing that success lies in the success of existing potential customers. On this foundation, doing all possible to understand, fulfil and exceed the customer’s stated and unstated needs, thus enabling them to succeed on a continual basis.
Knowledge: Continually upgrading skills and knowledge about technology, markets, products, customers, regulations and business process. Encourage new ideas and their implementation across the company for commercial benefit.
Prosperity: Winning, doing better than others through exploiting new opportunities and enhancing the interests of every employee, share holder and stake holder. To be recognised and perceived amongst the leaders in the segment of operation.
Teamwork: Employees and channel partners thinking and working together across functions, business and geographies, leveraging the available resources to achieve common goals.
9
Velocity: Responding to internal and external customers with a sense of urgency by consistent, focussed and accelerated growth of the organisation with timely and optimal utilization of all resources.
CHAPTER 2
Production department
10
GM (plant)
Production head
Deputy manager
Shift manager 1
Process engr. (DCS)
Process engr. (field)
Shift manager 2
Process engr. (DCS)
Process engr. (field)
Shift manager 3
Process engr. (DCS)
Process engr. (field)
Shift manager 4
Process engr. (DCS)
Process engr. (field)
Departmental Structure
Fig 8
ACTIVITIES OF PROCDUCTION DEPARTMENT
The activities of production department are as follows:-
To ensure safe, continuous operation of plants.
To implement and train down the line personnel on quality system.
For continuous improvement in operations of plant and utilities conservation.
To coordinate with maintenance departments for smooth running of the plant.
To ensure good housekeeping in the plant.
Minimization of waste and maximizing productivity
Types of product and their specifications
11
Specifications MANCOZEB 80% W.P. (powder)
85% Technical
Manfil 75% WG Granules
Flow able liquid
Active ingredient(AI)
Max. 81.5% Max. 85.5% 75.5% 35.5%
Suspensibility Min. 72% Min. 70% Min 68% Min 90%pH 6.8 – 7.5 Same Same SameTime to dissolve in water(WOT)
60 sec Same 30 sec NA
Moisture content(MC)
Less than 1%
Same Max. 2.5% NA
Wet Sieve Test(WST)
More than 99%
Same NA
Fig 9
Raw materials used:
Carbon disulphide (CS2) Ethylene Diamine (EDA) Caustic soda (NaOH) Manganese sulphate (MnSO4) Zinc sulphate (ZnSO4) Sodium lignosulphate (SLS) Hexamethylene tetramine (HMT)
Production process
Production of D-14
First chilled water is poured into the reactor
Then CS2 and EDA are added into the reactor.
EDA is added in two lots- 1st lot is added with Caustic soda. And 2nd lot is added with CS2
Caustic Soda is added in 3 lots- 2 lots solo and 3rd lot with CS2
And then excess CS2 is removed through distillation process. Thus D-14 is prepared
Production of M-22
Initially there is water present in another reactor. In this reactor the D-14 is poured with MnSO4.
12
MnSO4 is added in 2 lots- 1st lot is the heated lot added solo, 2nd lot is added along with D-14.
And then the reaction takes place. ZnSO4 is then added to the reaction so that it is not reversed.
This is how M-22 is prepared.
This M-22 has great moisture content, so to remove excess moisture M-22 is passed through Larox Pressure Filter, where its total solid content is adjusted to around 50% and moisture content is brought down to 52%- 54%.
Preparation of Slurry
The slurry is prepared by adding water and then stirring it well in the Reconstitution tank.
Preparation of powder
Now this slurry is poured in Spray Drier where small droplets are formed of it with the help of atomiser.
Then Hot air (temp- 310 degree Celsius) is blown in the Spray drier which removes the excess moisture and reduces from 52% to 10%- 12%.
This is how the powder is prepared.
Finished Product:
This powder is sent to a storage tank SILO from where is sent to Rotary Vacuum Drier (RVD).
Here the air and moisture is removed with the help of heating and then vacuuming.
The moisture content here is reduced from 12% to less than 1%.
Thus the finished product is prepared and sent to cooler for cooling and then further sent for packaging.
Production Layout: (approximate)
13
EDA + CS2 + Water+ NaOH = D 14
Fig 10
TYPES OF PRODUCTS AND THEIR USES
In this plant only 1 product is manufactured. But it is produced in different varieties.
The main use of Mancozeb is to be used as Fungicide.
It is used all over the world to prevent fruits & vegetables from fungus attack.
This product is not used directly. A solution is prepared according to the need by mixing it
with water in a certain proportion and sprayed all over the fields.
14
Precipitator:
MnSO4 + D14 + Water = M22
Larox Pressure filter = M22 – Moisture
Rotary Vacuum Drier: Powder- air - Vacuum
Cooler
Spray Drier: Slurry - Moisture
Blender (for packaging)
Homogenizer (preparation of Slurry)
COORDINATION BETWEEN PRODUCTION DEPT &.....
Logistics and Purchase:
Here first the planning department plans the budgeted sales of the year. They inform the
purchase department about the raw materials required to meet the budgeted sales and the
Production department about the budgeted production to be done in order to meet the sales.
The purchase department consults with the inbound logistics department to get the status of
the present raw material and identify the gap between the required and available. The
Production department co-ordinates with the logistics department for production process
Production and dispatch:
During the production period the samples are sent to the QA department for verification and
testing. The final product‘s samples are also sent for testing. After the approval by the QA
department, only then the finished goods are sent to outbound logistics for further packaging
according to the consignment. Now the consignment is sent to Sales department for further
dispatch procedure.
Production and Engineering
Production department perform day wise production planning. Here Engineering department
comes into picture as it has to provide daily preventive maintenance schedule so as to
maintain a smooth working of production process. And in case if some breakdown takes
place, the production department issues a work permit (via SAP) to the engineering
department (shift wise) which performs the required action and fix the problem.
Usually Daily review Meetings are conducted to report and discuss the problems, breakdowns per day and to come up with the solution.
And these daily Review meetings are further reviewed in Weekly Review Meetings and these meetings are further revised in Monthly meetings, based on which the budget is planned.
Material handling equipments:
15
Forklift trucks
The plant is designed in such a way so that it can use gravity as an equipment to move materials from one stage to another. The plant is basically designed on gravity.
DCS- Digital Control System
DCS system is used in controlling all the activities of the production process through computerized software. All the vessels and reactors are controlled through this system.
There are 4 operators handling this system. The pressure, the heat, the material entry, its exit, etc are controlled by this system.
All the similar activities are grouped together in order to simplify the process.
CHAPTER 3
16
Human Resource department
Department Structure and all activities:
Fig 11
The activities of Personnel /HR department are as follows:-
Ensure management of recruitment of personnel at the manufacturing unit.
Ensure administration of the performance management system at the manufacturing
facility.
Ensure compliance with all statutory and regulatory requirements relative to the
manufacturing facility.
Identify training need and implement.
Efficient administration of welfare, hospitality, communication, estate etc.
Liaison with government authority, external agencies / Institutions & local authority.
Implementation of multi skill for shop floor personnel.
Proactive approach of handling land losers employments issue.
Impart training to officers and above.
17
GM PLANT
DY MGR HR
Executive Administration Executive HR Sr. Executive
Security
Security Officer
Security Officer
Security Officer
Functions of time office:
The main purpose of time office is to keep record of absent and presence of employee.
Office timings: - 9.00 Hrs. to 17.30 Hrs.
Weekly off Day: - Sunday
Attendance system: - Computerized Windows Based Punching system.
Shift timings: - Morning Shift – 6:00hrs to 14:00hrs
Afternoon Shift – 14:00hrs to 22:00hrs.
Night Shift – 22:00hrs to 6:00hrs
LEAVES
Privilege leave - 30 days p.a.
Casual leave - 8 days per annum
Sick leave - 7 days p.a.
Maternity leave - N/A
PERSONAL DETAILS OF EMPLOYEES:
1. C.V. (Curriculum Vitae).2. Employment form (Education and experience).3. Offer letter copy.4. Appointment letter copy.5. Conformation letter copy.6. All education certificates.7. Other Certificates (like Certificate of residential proof for loan applications).8. Warning letters for misconduct.9. Xerox copy of Form no. 2 ( declaration/ Nomination form)
HUMAN RESOURCE PLANNING:
The organisation follows the common human resource planning process.
1) Analysing the present situation of manpower.18
2) Forecasting demand of manpower in future3) Determining the supply of manpower.4) Comparing the demand and supply of the manpower5) Action plans6) Monitoring and Audit
Recruitment and selection
In Indofil, recruitment is done when any department is in a need of manpower. So
departmental head has to fill man requisition form, in which detail regarding job title when
required, description of duties, specific experience required and education & special training
required are mentioned. This form is then signed by departmental head then it is sent to HR
department head and then sent to GM.
Then the personnel dept. through its sources i.e. internal/external fulfils the requirement of
the dept.
Firstly, the personnel dept. tries its internal source i.e. within the company if any employee is
suitable for that vacancy the he is appointed or the personnel dept. refers the computer data
bank or through internal reference.
If the internal source cannot fulfil the requirement then through external source the
requirement of the dept. is fulfilled. The external sources of Indofil are approved placement
consultants or newspapers.
The Recruitment Vacancies are classified as follows:
Fig 12
Sources of recruitment:19
1A
Sr. Vice President, Vice President and Director
BC
2 B General Manager
3B Chief ManagerC Sr. Manager
4A ManagerB Deputy/ Assistant
Manager
5
A Sr. Executive, Shift Manager
B Officer and ExecutiveC Process Engineering
Field, Electrical
Internal sources:o Employee retention
o References of internal employees
External sourceso Employment exchanges
o Advertisement in News papers, Journals, etc.
o External references
SELECTION PROCESS:
In selection procedure, interviewer assists the interviewee on the basis of general intelligence, ability to express self verbally, enthusiasm, relevant experience and qualification and then overall rating is decided.
Now shunting of all the applications for the vacancy is done as per the requirement and convenience of the company.
This sorting process is done under the supervision of the HR mgr.
After the sorting process the selected candidates are called in the organisation for the interviews.
Interview
1st Interview- Interviewer- HR Manager
2nd Interview- Interviewer- HR Manager and Heads of Department
3rd Interview- Interviewer- General Manager, HR Manager, and HODs
After the 3rd interview, the candidate is finalized by the general manger.
Then GM informs the head office and sends the offer letter to get it signed.
Mean while the medical check up of the candidate is done
Then the offer letter and the appointment letter are handed over to the selected candidate.
Performance Appraisal system for different levels:
Performance appraisal is the system used to evaluate the performance of employees, and to
provide some rewards & incentives on their performance. Performance Appraisal focused
primarily on helping the individual to develop his/her present role capability for that role.
There is same PA system for every employee and trainee in the Organisation.
20
At the beginning of the financial year, the employee decides his goals and objectives towards the organisation. This is known as the key result area.
Key result area has certain Key Performance Indicators which are the small tasks or jobs performed in order to achieve the objectives or goals.
At the end of every quarter HODs have a meeting and they measure and compare the actual KRA of an employee with the performance of an employee.
At the yearend an annual report of the KRA is prepared and PA is conducted on that.
Any gap or deviation or fulfilment of the objective is communicated to the employee and corrective measures are taken.
Training and development activities including Feedback process:
Training is a steady process but it can be healthy exercise means making one effective and
perfect in his work assigned to him and to perform better in future. There are various
training programme carried out in Indofil Industries ltd. for better performance of an
employee, following are the types of training programme carried out…
Behavioural training
Functional training
Safety and health training
Fire fighting training,
Induction training
On job training ,
Class room training,
Technical training,
Process related training
System training
These training needs of an employee is identified by the yearly performance appraisal form,
also with the help of their training needs identification form which is being periodically send
to department head and accordingly the employee are being trained.
Any newcomer in the organisation in the organisation is given the required training on the basis of his job and an overall awareness required.
21
Fig 13
FEEDBACK PROCESS OF TRAINING PROGRAMME
After the training programme is over, management tries to know the effective of the training
programme. For this Training Programme Attendance, Feedback and course effectiveness
form is filled up to know that is there any change in his working attitude and quality of work.
AVERAGE TRAINING MAN-DAYS
It is the policy of the company that each and every employee must get at least 2 Man-Days
training in a year.
ROLE PLAYED BY DIFFERENT PARTIES IN TRAINING PROCESS
In training employee the main party involves are Company, Manager and Employee. This
could be better understood as follows…
22
COMPANY
Provide structure, materials, resources and guidance to learn and develop
MANAGER:-
Provides personal coaching, counselling and feedback encourages initiative
EMPLOYEE = DRIVER
Task responsibility and initiative, seeks for opportunities for self – learning a feedback from the manager and colleagues.
New joiner Induction training Awareness
ROLES IN TRAINING PROCESS
Fig 14
PROMOTION AND TRANSFER POLICY
PROMOTION
A promotion may be defined as an upward advancement of an employee in an organization
to another job, which commands better pay/wage, better status/ prestige & higher
opportunities/ challenges & authority, better working condition & facilities at a higher rate.
Rating factors:
Promotion is based on an employee’s performance and need.
The other factor that is taken into consideration is whether the employee is capable of handling a higher level job or not.
TRANSFER
Transfer can be defined as change or shift in the work place with same status, responsibility
& authority, etc. It is based on needs of the organization, also on the bases of organization
requirement and written down policy of the organization.
WELFARE ACTIVITIES
Welfare can be defined as the measure implemented by the company, the working
conditions of the employees. Welfare activities are a kind of return, which is given to
employees in return to their work. Following are the some welfare facilities provided by
Indofil industries ltd....
Transportation
Uniform for employee
Canteen and guest house
LTA
23
Medical aid
Sports day
Water cooler and toilet
Special gathering
Picnics
Movie shows
Competitions for school kids
WAGES AND SALARY STRUCTURE
Wage and salary are different at different level, which is as follows…
Components of salary:-
Basic Salary 40% of total CTC
HRA 40%
Medical Rs. 1250
LTA 10%
Bonus 20%
Conveyance Rs. 800
Fig15
INDUSTRIAL RELATION
24
In Indofil, management is more concerned about the development of their employees. And
employees, in return, are concerned about the development of the organization by providing
quality work and proper coordination with management and their ultimate superior. In
Indofil, there is no Trade union; this shows that there is warm and friendly relationship with
employee-employer and employee-management.
Every employee is free to express their views and problems with the management. In
Indofil, there is no single warning letter being issued, no court cases going on. Management
provides counselling for all employees to improve their work quality. Management also
discusses the problems freely and friendly.
ACTIVITIES CARRIED OUT TOWARDS ORGANISATION’s DEVELOPMENT
Indofil carries out activity like Training of employee and suggestion form from employee for
improving their work environment and ultimately the organization. Indofil has the strategy of
“5 S” which is a Japanese system of maintaining cleanliness in the organization.
ADMINISTRATIVE ACTIVITIES
Administration department has the following activities to perform...
Communication with all dept.
Transportation facilities
Medical service
Welfare activities
House keeping
Canteen facilities
Tickets, coupon and accommodations
TRANSPORTATION
25
Administration department look after the transportation of all the employees in the
organization, all the shift employees are being picked up from different stoppage.
SECURITY
The main function of security is to look after the Men, Machine and Materials. It has to
protect these all over. In Indofil there are 3 officers, 1 Executive and 17 Contractual Guards
(including both the shifts).
COMPUTER SOFTWARE USED
Record regarding time office is done in Windows based punching system.
Record of employees is made in excel only.
For pay roll of employees SAP software is used.
26
CHAPTER 4
Accounts department
Departmental structure
Fig 16
Activities:
The following is the main activities of Accounts dept.
Indofil Dahej plant reporting – Monthly, Quarterly and Annually.
Compiling company’s yearly budget.
To monitor monthly cash flow.
Managing day to day funds requirements.
To manage the accounts of the company
To manage the taxation policy
BUDGETING
A budget is a co-coordinated financial estimation of the income and expenditure of an
organization related to a specified. Budget says “Are plans of action quantified in money
terms for some future period in time”.
27
Senior V.P. (finance)
Sr. Mgr accounts
Officer (accounts)
Officer (accounts)
Officer (costing)
BUDGET MANUAL:
Budget manual is prepared by taking following points in to consideration.
Pricing and duty structure.
Sales volume forecasting.
Raw material cost.
Utility cost.
Fixed cost.
Interest cost.
Capital cost.
Previous year’s expenses statements.
BUDGET PERIOD
Budgets are prepared annually from 1st April to 31st March
ANNUAL BUDGET
The company prepares 2 types of annual budget:
Expenses budget- Production budget
Cash Mgmt Budget.
LONG TERM AND SHORT TERM FINANCE
LONG TERM
The long term requirement of Indofil Dahej is fulfilled by the Head office in Mumbai.
SHORT TERM
Short term requirement of Indofil, Dahej is fulfilled from Head office through HDFC bank.
28
ACCOUNTING METHOD / SYSTEM
SAP system is used in Indofil for maintaining all the transactions.
COSTING OF THE MAIN PRODUCT
Costing of the product is based on following factors
Product cost includes the Input landed cost of raw material.
Variable utility cost
The following are the variable utility cost.
Electricity and power
Fuel
Water
Various other expenses.
FIXED COST
The following are the Fixed Cost
Salary and wages
Employee welfare
Insurance
Depreciation/interest
RESPONSIBILITY ACCOUNTING
Department heads are considered as responsibility centre.
Plants are considered as the profit centres.
CASH MANAGEMENT
Management of cash includes monitoring cash inflows and outflows of cash.
Cash Inflows:
Cash Inflows of Indofil are through:
29
Receipt from debtors
Cash Outflows:
Cash Outflows of Indofil are through:
Payment to creditors
CREDIT MANAGEMENT
CREDIT POLICY
Indofil allows credit to its debtors for 60 to 180 days.
CONTROL OF RECEIVABLES
Receivables are controlled by preparing Aging schedule and Day’s sales outstanding.
Collection activities are carried out from Head office at Mumbai.
TAXES
The company receives financial incentives as it comes under Special Economic Zone (SEZ).
Almost all the finished goods are exported therefore there is no sales tax applicable.
A special tax known as MAT (Minimum Alternate Tax) is applicable from this year that is FY
2011-2012, which is based on income.
Some of the incentive facilities offered to SEZ units is:
Duty free import/domestic procurement of goods for development, operation and maintenance of SEZ units
100% Income Tax exemption on export income for SEZ units under Section 10AA of the Income Tax Act for first 5 years, 50% for next 5 years thereafter and 50% of the ploughed back export profit for next 5 years.
External Commercial Borrowing by SEZ units up to US $ 12500 billion in a year without any maturity restriction through recognized banking channels.
Exemption from Central Sales Tax. Exemption from Service Tax.
30
Exemption from State sales tax and other levies are as extended by the respective State Governments.
FINANCIAL MIS
Monthly cost sheet
Monthly P&L A/C
Monthly budget
Preparation of Balance sheet
Profitability report
Fixed / variable cost report
31
CHAPTER 5
Quality Assurance
Departmental structure:
Fig 17
Activities:
To establish and maintain product list results of QA Indofil comparable with
customers’ standards.
Adherence to calibration of instruments/ equipments and analysis of standard
samples.
Customer complaints - Export and Domestic customers
Impart training to officer and above.
To undertake 3 types of QUALITY analysis:
o Input (raw materials/ packaging materials)
o In process
o Finished goods.
32
Senior GM- QA (Thane)
Senior manager (company branch)
Executive (export)
Officer
Executive (QA)(7)
Officer Officer Officer
To undertake plant audit periodically- weekly, fortnightly; to see if Standard Operating
Procedure is working right or not.
To execute export activities as per procedures defined.
Types of instruments used:
1. Gas chromatograph2. High performance liquid chromatograph3. Particle size analyzer4. U V visible spectrophotometer5. pH meter6. Karl Fischer apparatus7. Viscometer8. Melting point apparatus9. Centrifugal machine10.Hot air oven11.Water bath12.Moisture analyser
Method of Calibration
Calibration is done through outside agencies as well as in house. Depending upon the
use of instruments, the frequency is decided.
Quality Assurance is responsible for looking after and fulfilling the standard quality norms
as lay down, it undertakes quality checks daily. It checks on the quality of product
randomly selecting one of each type from every batch dispatched only after the product
is marked with Q.A., passed that it is allowed. If quality is meeting as per requirements
and as per specification then only finished goods are dispatched to customers.
There is quality check at every stage of production so as to detect fault, if any, and to
take corrective measures.
Parameters tested in the lab
Product Stage/sample Parameter Frequency
Specifications
33
Mancozeb
D-14 % AI 1 batch/ fortnightly
70% minimum
% Na2S 1 batch/ fortnightly
0.1% maximum
Colour 1 batch/ fortnightly
2 to 2+
pH Each batch
8.6 to 8.8
ETU 1 batch/ fortnightly
0.1% maximum
M22 precipitant
Excess of MnSO4
Each batch
0.8% to 1%
% AI 1 sample/ batch
50% – 55%
%Total Solids
Max 3 samples for WDG
50% - 58%
% Purity None Minimum 95%
pH None 6.8 to 7.2
M-45 % Total Solid
1 sample/ batch
Min 52%
% A I None 46% - 49%
% Purity None Min 82%
Viscosity by ford cup method
None 24 sec maximum
Spray Drier % M/C by IR
None 10% to 12%
% AI Once in a day
77 to 80 %
pH Daily after 4 hrs interval
6 to 7.2
WST Daily after 2 hrs interval
45 minutes
Fig18
34
Stage Parameter Frequency Specification
Final sampling WOT Each batch Maximum 60 secWST Each batch Minimum 99%
pH Each batch 6 to 7.1 for tech.6.8 to 7.5 for 80% WP
Dry sieve test One batch per day No hard lump more than 3mm, easily soaked in water, residue not more than 250 mg
Wet screen test Each batch Not more than 10 -12 black particles
M/C by moisture analyser
Each batch -
Fig 19
Product Stage/sample Parameter
WDG
( wetable
dispersible
granules)
Homonizer slurry % total solid
% A I
1st milled slurry % total solid
Sediment
2nd milled slurry Total solid
Particle size
Viscosity
Final sample % A I
% suspensibility
WOT per sec
% attribution resist
Appearance
pH
Blooming
Clouding %
35
% M.C. by IR
Persistent foam
ETU(ethelyne thio
urea)%
Mn content%
Wet sieve test %
Retention test
Fig 20
Quality plan& Sampling for key raw materials:
Criteria for approval: Based on supplier’s COA
1. CS2
2. EDA3. MnSO4 sol.4. ZnSO4 sol.5. Sodium lingo sulphate(SLS)6. Hexamine ( also based on solubility)
MnSO4 monohydrate powder- appearance, pH, organic impurity, purity, COA,
Caustics soda lye- appearance, assay
Quality plan & Sampling plan for packaging materials:
Parameters:
For Multiwall laminated yellow paper bag (25 kg) imported
Visual inspection for colour printing Measurement of dimension Weight of 2 bags
For Multiwall laminated yellow, white, green, red paper bag (25 kg & 10 kg) Indian
Visual inspection for colour printing Measurement of dimension Weight of 2 bags As per supplier’s COA
For corrugated fibre board sheet 44” x 44” for export
Visual inspection 36
Measurement of dimension As per supplier’s COA
HMHDPE 120 lt. full open top drums
Visual inspection Measurement of dimension As per supplier’s COA Weight of 2 drums
LDPE Poly liners for 120 lt. Full open top drums
Visual inspection Measurement of dimension As per supplier’s COA Weight of 2 drums
LDPE cover (44”x44”x12”)
Visual inspection Measurement of dimension As per supplier’s COA Weight of 2 covers
Pine wood heat treated wooden pallets
Visual inspection Finishing physical defects like knots, poor nailing, etc Measurement of dimension As per supplier’s COA
Liner carton for Manfil vacuum pack (1 kg & 500 gm)
Visual inspection for colour and printing weight of 2 packs Measurement of dimension As per supplier’s COA
For corrugated fibre board boxes for small packing
Dimensions of 2 boxes As per supplier’s COA
37
CHAPTER 6
LOGISTICS AND DISPATCH
Departmental Structure
Fig 21
MAIN ACTIVITIES OF DISPATCH AND LOGISTIC
Following is the main activities of warehouse:-
To maintain mini/max level of inventory
To make procurement plans for imported and local raw material.
Coordinating Raw material inventory with the purchase department
To ensure safe operation in ware house.
Adherence of Customs (SEZ) laws.
To update and maintain all the documents.
Timely dispatch of material according to marketing department.
To maintain proper housekeeping in warehouse.
Coordination with other department to ensure smooth functioning.
Shifting of FG from plant to warehouse and stacking to the Godrej Racks.
38
Head of the department
Sr. Executive
Officer
Field engineer
Field Engineer
Officer Officer Officer
MODE OF DISPATCH
Mode of dispatch is based on two types of sales made by the Indofil are as follows:-
Note: 90 % to 95% of finished goods are exported.
For Domestic sales- Road transportation
For Export sales- from Dahej plant to Mumbai Port by Road transport and from there
to different countries through ship vessels.
Sources of mode of dispatch
ROUTING OF INVOICE and DISPATCH PROCEDURE
Documents required:
Commercial invoice
Shipping bill
Certificate of analysis
LR copy (lorry Receipt)
Gate pass
402 form for border crossing
Details of commercial Bill:
Party name
L C no.
Material description
Shipping mark
Container no.
Seal no.
Batch no.
Price
Exchange Currency
The invoice generates from the Marketing Department at the Head Office.
From there it is sent to the Plant and the invoice number is generated here.
39
Along with that other relevant details are also generated at the plant, namely:
Date of dispatch
Batch number
Shipping mark
Consigner’s name
Container number
Purchase order number
L.C. number
Gross weight
Net weight , etc
This invoice is then verified by the custom office in order to fill the shipping bill, which is
generated there.
These documents are then given to the driver of the container along with the Certificate of
Analysis and a 402 form.
Driver gives these documents to the Main SEZ gate in order to clear the container out of the
gate.
The officer here checks the documents and makes a record at the gate and let the vehicle
pass after verifying them.
After getting cleared from the SEZ gate the container moves towards Mumbai Port where it
is unloaded at a place known as Buffer until the booked ship vessel arrives.
Before loading the container into the ship, all the documents are checked and verified and
then the shipping bill is endorsed by the Custom authority and the container is ready to get
loaded.
Now the ship takes the consigned container to the consigner.
40
Dispatch
Fig 22
41
Comes to plantInvoice generates from the Marketting dept. at H.O.
Plant generates the invoice no. and other details
Shipping bill is prepared
Truck reaches to company
Arrange the transportation
Truck inspection
Empty truck weight
He prepare Dispatch document
Truck is out of gate
Gross/Net weight of truck
Handover the invoice and other docs. to transporter
Prepare loading slip
Comes to loading point
Gate entry
CHAPTER 7
STORES DEPARTMENT
Types of stores
There are mainly three types of stores and they are
Raw material store
Engineering stores
Finished goods stores
Classification of material
Carbon disulphide is classified in to ‘3’ category of material.
Ethylene Diamine (EDA) is classified in to ‘3’ category of material.
Finished Product (Mancozeb) is classified in to ‘9’ category of material.
INVENTORY MANAGEMENT SYSTEM
Inventory is managed through Automatic Storage Retrieval System (ASRS).
It is a fully automatic system which reads the barcode of the finished goods pallet and stores
the finished goods according to the space available.
MATERIAL CODING SYSTEM
Since there is only one product manufactured. There is no material coding system applicable
in this plant.
Storage medium
The storage mediums used in the company are:
120 lt. capacity drums
Bags - 1 kg and 500 g capacity. For vacuum sealing
Bags – 50 kg, 25 kg, 10 kg
Material handling within the stores42
Materials are handled within store through forklifts only.
STORAGE PROCEDURE
Receipt procedure:
Whenever raw material, chemicals reaches to the company and in stores, stores
dept. prepares GRN (Goods Receipt Note).
Storage procedure:
As an when goods come to store it is inspected, and if found defective, the item is
rejected and not stored in store dept.
After inspection the goods are sent to the raw material warehouse from where they
are loaded to racks/ shelves where the entry is being made through WMS/ SAP.
Issue procedure:
Goods are issued on FIFO method.
Finished Goods storage Procedure
Once the finished goods reach the F.G. warehouse after the quality check, they are
transported to the ASRS system.
The forklift places the 1 pallet at a time on the rack of ASRS, from where the pallet’s
barcode is read by the machine. Then the machine lifts up the pallet from the rack
and places it on one of the shelves which is empty automatically.
This new FG pallet is recorded in the software used by the ASRS and the entry is
made of the new finished goods.
The bar code on the pallet contains all the required information such as product’s
specification, its manufacturing date, expiry date, etc.
So when the barcode reader reads, it makes the entry.
Issue procedure of finished goods:
The goods are issued on FIFO basis.
When they are required, the operator enters the quantity and the product specification
required to the ASRS software and the ASRS machine brings the appropriate pallet
on the rack and places on it. From here forklift takes the pallet and takes it to the
container or the place from where the goods have to be dispatched. 43
STOCK VERIFICATION
Stock is verified thrice in a month.
CHAPTER 8
ENVIRONMENT SAFETY, HEALTH DEPARTMENT
44
Departmental structure
Fig 23
Main activities of EHS
Towards Environment and Safety
To provide safe environment to all the employees and workers. To prevent accidents in plant. To provide PPE to all the employees and workers and follow the compliance. To provide training to all employees regarding EHS. Investigation and Reporting of all accidents. To properly treat all the waste generated in the plant as per legal compliance Operation of the ETP to meet the Pollution Control Board standards. Proper disposal of hazardous waste. To keep relations with government authorities like Gujarat Pollution Control Board,
factory inspectors Maintain Fire Production Systems.
Towards Health of Employees and Workers
To operate the occupation Health Centres Monitoring of hygienic conditions Monitoring of Workplace environment Periodical Medical check up of employees Maintain First Aid box inside the plant.
45
General Manager
Sr. Manager EHS
Sr. Executive EHS
Resources available for Emergency:
Emergency Response team
First aid Team
Rescue team
Fire Men
Fire extinguishers
Fire hydrant lines
Self containing Breathing Apparatus
Personal Protective Equipments available:
Helmets
Shoes
Goggles
Hand Gloves
Dust masks
Paper masks
Ear Plugs
At times of emergency the company has its own Onsite Emergency Plan which help it solve the problem and to find the route cause as soon as possible
The roles and responsibilities are of the Emergency Response team is pre-defined by the company itself.
Onsite Emergency Control Plan
Classification of Emergencies
A- Smouldering/ localised fire B- Fire in large area/ toxic release/ heavy spillage/ injuries to personnel requiring
hospitalization.C- Major fire- potential to spread/ Explosion/ Bulk leakage/ serious injuries to personnel
– may require evacuation of works partly or wholly.D- Natural CalamitiesE- Environmental emergencies
Handler EmergencyIncident controller A Site Controller B, C, D, E
Fig 24
46
Roles:
Roles Person responsible Reporting locationSite Main Controller (SMC) Chief of Unit/Operation.
Mech. Engr. (During odd hrs.)Emergency Control Room
Incident Controller (IC) Shift Production manager Scene of IncidentDy. Incident Controller, Geographical Area In-Charge Scene of IncidentLiaison Officer. HR Manager and or
Security In charge on dutyAt security gate
Emergency Response team/ Medical Services
ERT Member Reach at the scene of incident
Safety In-Charge- Manager Production and Electrical, Utility
Manager / Executive First aid centre
Safety In-Charge Sr. HSE Manager / Sr. Executive Scene of incident Fire pump Operator Utility operator (Cooling tower
pump operator)Fire pump house
Fig 25
CHAPTER 9
ELECTRICAL AND INSTRUMENTS DEPARTMENT
Departmental structure:
47
Fig 26
Activities of electrical department:
Provides continuous power without interruption. Energy saving Providing and keeping Electrical equipment in good condition for better production. Provide reliable service to other departments for electrical equipments.
The power supply is provided by Torrent Energy.
Torrent Energy takes power from DGVCL.
There are transformers of 2500 KVA in the plant and 1250 amp. VCB high tension breaker
There are 2 DG set of 860 KVA on standby in case of power cut emergency.
Activities of Instruments department:
o They are responsible for smooth running operation of plant.
o Maintenance of all field instrument
e.g.:1. Pressure Transmission2. Level Transmission
48
Sr. Executive
Officer/ Process Engg.
Officer/ Process Engg.
Officer/ Process Engg.
Officer/ Process Engg.
Contractor / Technician
3. Flow Transmission4. Temperature Transmission5. Gages Transmission
o Maintenance of control system,
e.g. DCS (Distributed control system) o Breakdown Maintenance of all system’s instrument.
o New modification of system /new technology arrive
o New Project /Expansion work.
o Preventive maintenance of all instruments.
o Calibration of all instruments.
CHAPTER 10
MAINTENANCE DEPARTMENT
Departmental structure:
49
Fig 27
Activities:
Responsible for smooth running and operations of plant.
Maintenance of all Mechanical equipments like:
o Reactors
o Heat Exchanger
o Rotary Vacuum drier
o Rotary Cooler
o Blender
o Spray drier
o Blowers, etc
Breakdown maintenance of all mechanical equipments
Preventive maintenance of all mechanical equipments
Preventive maintenance of all mechanical equipments
To undertake new projects and expansion work.
50
Manager (Mech. Maintenance & Utilities)
Engineer
Technicians for plant
maintenance (5)
Engineer
Technicians for utility operation & maintenance (4)
Engineer
Boiler operator and maintenance
Engineer