AUTOMATED DEVELOPMENT OPTIMIZATION OF FULMAR FIELD
By: Vishnu Prasanna Raj
Supervised by: Mike Christie
1
![Page 2: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/2.jpg)
OUTLINE
ObjectivesIntroductionMethodologyResultsConclusionFurther Suggestions
2
![Page 3: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/3.jpg)
OBJECTIVES
1. To do Automated development optimization of Fulmar field using Raven Software.
2. Comparison of the Automated and Manually done field development optimization.
3. Comparison of the Single Objective Optimization(SOO) technique and Multi Objective Optimization(MOO) technique.
3
![Page 4: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/4.jpg)
INTRODUCTION
Conventional Approach Unconventional Approach
Single Objective Optimization (SOO) Multi Objective Optimization (MOO)
Data summary(Fulmar Field) Three way dip anticline structure STOIIP of 907MMSTB Two OWC (Major Fault)
4
![Page 5: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/5.jpg)
METHODOLOGY
Optimization Parameters
5
![Page 6: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/6.jpg)
METHODOLOGY
1. Optimization of Number of wells
6
![Page 7: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/7.jpg)
METHODOLOGY
2. Optimization of Well Locations
7
![Page 8: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/8.jpg)
METHODOLOGY
3. Optimization of Recovery Method Water Flooding Polymer Flooding
4. Optimization of Flow Rates Production Rates Injection Rates
5. Optimization of Perforation Interval Production wells Injection wells
8
![Page 9: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/9.jpg)
RESULTS
1. Total Development Optimization SOO • MOO
Best Score for SOO • Best Score for MOO
FOPT = 647 MMSTB FOPT = 654 MMSTB
FWCT = 65%
9
![Page 10: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/10.jpg)
RESULTS
1. Total Development Optimization Number Of Production wells • Type of Production wells
10
![Page 11: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/11.jpg)
RESULTS
1. Total Development Optimization Number Of Injectors • Recovery Methods
11
![Page 12: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/12.jpg)
RESULTS
12
2. Comparison with Manual Optimization MOO SOO
![Page 13: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/13.jpg)
RESULTS
13
3. Comparison of SOO & MOO
![Page 14: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/14.jpg)
CONCLUSION
Automated optimization Improves Recovery Saves time MOO technique faster convergence
Raven All the parameters were optimized in a single
simulation
14
![Page 15: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/15.jpg)
FURTHER SUGGESTIONS
Calculation of NPV
More Recovery Methods Gas Flooding & Low Salinity water Injection
15
![Page 16: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/16.jpg)
Thank You
16
![Page 17: Individual Project](https://reader030.fdocuments.us/reader030/viewer/2022032513/55d27aafbb61eb44128b4674/html5/thumbnails/17.jpg)
BACKUP SLIDESCOMPDAT
-- well P Y Ztop Zbot Status well ID orientation
P1 $i1 $j1 1 $z1 {($a < 0.5)?"OPEN":"SHUT"} 7* /
P1 {$i1+1*($x1-$y1)} {$j1+1*(1-($x1+$y1))} $za1 $za1 {($a > 0.5)?"OPEN":"SHUT"} 7* /
P1 {$i1+2*($x1-$y1)} {$j1+2*(1-($x1+$y1))} $za1 $za1 {($a > 0.5)?"OPEN":"SHUT"} 7* /
P1 {$i1+3*($x1-$y1)} {$j1+3*(1-($x1+$y1))} $za1 $za1 {($a > 0.5)?"OPEN":"SHUT"} 7*/
I1 $I1 $J1 1 $Z1 OPEN 7* / /
WCONPROD
P1 {($b < 0.5)?"OPEN":"SHUT"} LRAT 3* $Pr1 1* 5000 / /
WCONINJ
I1 WAT {($c < 0.5)?"OPEN":"SHUT"} RATE $Ir1 3* 10000 /
I1P WAT {($d < 0.5)?"OPEN":"SHUT"} RATE $Ir1 3* 10000 / /
WPOLYMER
-- well name concentration
I1P 1.0 / /