    AACE InternationalRecommended PracticeNo.29R03, Forensic ScheduleAnalysis

    TCM Framework: 6.4 Forensic Performance Assessment, AACE International

    RecommendedPractices,2007.(A02)

    2.

    AACE International Recommended Practice No. 52R06, Time Impact Analysis As

    AppliedInConstruction,AACEInternationalRecommendedPractices,2006.(A03)

    3.

    A.A.

    Kwakye,

    Construction

    Project

    Administration

    in

    Practice,

    Longman

    Group

    Limited,January1997.(A19)

    4. BarryB.BrambleandMichaelT.Callahan,ConstructionDelayClaims,ThirdEdition,

    ASPENSPublishers,2000.(A17)

    5. Brian Eggleston, Liquidated Damages and Extension of time: In Construction

    Contracts,ThirdEdition,WileyBlackwell,2009.(A31)

    6.

    BruceEvansHallock,andPradipM.Mehta,TheGreatDebateTIAvsWINDOWSA

    Better Path for Retrospective Delay Analysis?, CDR.04, AACE International

    Transactions,2007.(A40)

    7. Cheryl Simple, Francis T. Hartman, and George Jorge, Construction Claims and

    Disputes:Causes andCost/TimeOverruns, Journalof Construction Engineering and

    Management,Vol.

    120,

    No.

    4,

    June,

    1996.

    (A11)

    8.

    Chris Carson, and Paul Beckwith, Preparing & Analyzing a Prospective

    Contemporaneous Time Impact Analysis, Alpha Corporation and Regency Centers,

    August9,2007.(A34)

    9.

    DamienKeogh,SuccessfulDelayandDisruptionClaims:Presenting theClaim, Irish

    ConstructionMagazine,May,2005.(A38)

    10.

    David A. Norfleet, Understanding Construction Schedule Delays, Professional

    InvestigativeEngineers,2004.(A42)

    11.

    Dennis F. Turner, Building Contract Disputes: Their Avoidance and Resolution,

    SecondImpression,LongmanPublisher,1990.(A01)

    12. Dr.SatishB.Mohan,andMr.KhalidS.AlGahtani,CurrentDelayAnalysisTechniques

    andImprovements,

    PS201,

    AACE

    International

    Transactions,

    2006.

    (A21)

    13. Evans M. Barba, Prospective and Retrospective Time Impact Analysis,

    Thomson/West,BarbaConsultingInc.,No.20057,July,2005.

    14. Gary H. Jentzen, Robin A. Collins, and Dr. Gui Ponce de Leon, Estimating Delay

    Damages,C&C.1,AACEInternationalTransactions,1996.(A27)

    15.

    GeorgeE.Baram,ConcurrentDelaysWhatAreTheyandHowtoDealWithThem?,

    CDR.07,AACEInternationalTransactions,2000.(A10)

    16. G.K.Killing,W.Kootchar,R.MacAfee,andF.EdumFotwe,ConstructionContractors'

    ClaimProcessFramework,JournalofConstructionEngineeringandManagement,Vol.

    127,No.4,July/August,2001.(A13)

    17.

    Hamed A. AlSaggaf, The Five Commandments of Construction Project Delay

    Analysis,Cost

    Engineering,

    Vol.

    40,

    No.

    4,

    April

    1998.

    (A39)

    18.

    HyunSo Lee,HanGunkRyu, JungHo Yu, and JadeJunKim, Method forCalculating

    ScheduleDelayConsideringLostProductivity,JournalofConstructionEngineeringand

    Management,November,2005.(A32)

    19. JamesG.ZackJr.,ButForSchedulesAnalysisandDefense,CostEngineering,Vol.

    43,No.8,August,2001.(A05)

    20.

    JamesG.ZackJr.,PacingDelaysThePracticalEffect,CostEngineering,Vol.42,No.7,

    July,2000.(A33)

  • 7/21/2019 Indice Discusiones

    2/5

    241

    21.

    JesusM.DeLaGarza,MichaelC.Vorster,andCordellM.Parvin,TotalFloatTradedas

    Commodity, Journalof Construction Engineering andManagement,Vol. 117,No. 4,

    December,1991.(A41)

    22.

    John C. Livengood, Retrospective TIAs: Time to Lay Them to Rest, CDR.08, AACE

    InternationalTransactions,2007.(A37)

    23.

    JonathanJingsheng

    Shi,

    S.

    O.

    Cheung,

    and

    David

    Arditi,

    Construction

    Delay

    Computation Method, Journal of Construction Engineering and Management,

    January/February,2002.(A18)

    24.

    Joseph s.Ream, DelayAnalysis:ASystematicApproach,CostEngineering,Vol.31,

    No.2,February,1989.(A47)

    25.

    KeithPickavance,DelaysandDisruption InConstructionContracts,SecondEdition,

    LLPLondonHonkongInc.,2002.(A23A25)

    26. LeeSchumacher,QuantifyingandApportioningDelayonConstructionProjects,Cost

    Engineering,Vol.37,No.2,February,1995.

    27. LuigiDi Paola and Paolo Spanu, ConcurrentDelays, The International Construction

    LawReview,p.373585,2006.(A09)

    28.

    MarkBoe,

    Identifying

    Concurrent

    Delay,

    New

    from

    CPMI

    on

    Construction

    Claims

    AnalysisandResolution,2004.(A30)

    29.

    Michael S. Simon, Construction Contracts and Claims, PublisherMcGrawHill (Tx)

    (April1979).(A15)

    30.

    Mikhail Chester and ChrisHendrickson, Cost Impacts, Scheduling Impacts, and the

    Claims Process During Construction, Journal of Construction Engineering and

    Management,Vol.131,No.1,January,2005.(A20)

    31. Nagui I. Raid, David Aridity, and Jamshid Mohammadi, Integrated System for

    ManagingOwnerDirectedProjectAcceleration, JournalofConstructionEngineering

    andManagement,Vol.120,No.1,March,1994.(A45)

    32. Ossama A. Hosny, An Artificial Neural Network Approach for Predicting Effect of

    Claimson

    Project

    Time

    and

    Cost,

    Engng.Res.Jour,

    Vol.106,

    PP.C88

    C106,

    August,

    2006.

    (A43)

    33.

    Robert B.McCullough and Satinder Singh Baweja, Identifying As Built Completion

    Drivers,PS.14,AACEInternationalTransactions,2006.(A29)

    34.

    RogerGibson,Analysisofprojectdelaytheoreticalor interrogationofthe facts?,

    GibsonConsultingLtd.,June,2003.(A04)

    35. Roy L.Wilson, Prevention and Resolution of Construction Claims, Journal of the

    ConstructionDivision,ProceedingsoftheAmericanSocietyofCivilEngineers,Vol.108,

    No.C03,ASCE,September,1982.(A35)

    36.

    R. Max Wideman, Construction Claims Identification, Communication & Record

    Keeping,TUNS/RevaySeminar,AEWServices,Vancouver,BC,2001.(A12)

    37.

    JimmieW.

    Hinze,

    Construction

    Contracts,

    Second

    Edition,

    Publisher

    McGraw

    Hill,

    Inc.,

    2009.(A14)

    38. Sabah Alkass, Mark Mazerolle and Frank Harris, Construction delay analysis

    techniques,ConstructionManagementandEconomics,Vol.14,p.375394,1996.

    39. SalehMubarak,ConstructionProjectSchedulingandControl,PearsonPrenticeHall

    2005.(A07)

  • 7/21/2019 Indice Discusiones

    3/5

    242

    40.

    Saied Kartam, Generic Methodology for Analyzing Delay Claims, Journal of

    Construction Engineering and Management, Vol. 125, No. 6, November/December,

    1999.(A28)

    41.

    SevtalanaLyasko,DailySpecificAsBuiltinAsPlannedvs.AsBuiltScheduleAnalysis,

    CostEngineeringVol.50,No.3,March2008.

    42.

    Societyof

    Construction

    Law,

    SCL

    Delay

    and

    Disruption

    Protocol

    Printmost

    (Southern)

    Ltd.,March,2003.(A36)

    43. StephenScott, DelayClaims inU.K.Contracts, JournalofConstructionEngineering

    andManagement,Vol.123,No.3,September,1997.(A24)

    44. TarekHegazyandChuiZhang,DailyWindowsDelayAnalysis,JournalofConstruction

    EngineeringandManagement,Vol.131,No.5,May1,2005.(A22)

    45.

    TheWorldBankandtheInternationalFinanceCorporation(IFC),DoingBusiness2010

    Egypt,ArabRepublic,The InternationalBank forReconstructionandDevelopment /

    TheWorldBank,2009.(A44)

    46. Thomas F. Peters, Dissecting the Doctrine of Concurrent Delay, CDR.01, AACE

    InternationalTransactions,2003.(A26)

    47.

    VeraA.

    Lovejoy,

    Claims

    Schedule

    Development

    and

    Analysis:

    Collapsed

    As

    Built

    SchedulingforBeginners,CostEngineering,Vol.46,No.1,January,2004.(A08)

    48.

    VincentPowellSmithandMichaelFurmston,ABuildingContractCasebook,Second

    Edition,GrandaPublishing,1990.

    49.

    William Schwartzkopf and John J. McNamara, Calculating construction Damages,

    SecondEdition,ASPENPublishers,Update2010.(A06)

    50.

    YoungjaeKim,KyungraiKim,andDongwooShin,DelayAnalysisMethodUsingDelay

    Section,JournalofConstructionEngineeringandManagement,November,2005.(A

    51.

    ZartabQ.Zafar,ConstructionProjectDelayAnalysis,CostEngineering,Vol.38,No.3,

    March,1996.