AACE InternationalRecommended PracticeNo.29R03, Forensic ScheduleAnalysis
TCM Framework: 6.4 Forensic Performance Assessment, AACE International
RecommendedPractices,2007.(A02)
2.
AACE International Recommended Practice No. 52R06, Time Impact Analysis As
AppliedInConstruction,AACEInternationalRecommendedPractices,2006.(A03)
3.
A.A.
Kwakye,
Construction
Project
Administration
in
Practice,
Longman
Group
Limited,January1997.(A19)
4. BarryB.BrambleandMichaelT.Callahan,ConstructionDelayClaims,ThirdEdition,
ASPENSPublishers,2000.(A17)
5. Brian Eggleston, Liquidated Damages and Extension of time: In Construction
Contracts,ThirdEdition,WileyBlackwell,2009.(A31)
6.
BruceEvansHallock,andPradipM.Mehta,TheGreatDebateTIAvsWINDOWSA
Better Path for Retrospective Delay Analysis?, CDR.04, AACE International
Transactions,2007.(A40)
7. Cheryl Simple, Francis T. Hartman, and George Jorge, Construction Claims and
Disputes:Causes andCost/TimeOverruns, Journalof Construction Engineering and
Management,Vol.
120,
No.
4,
June,
1996.
(A11)
8.
Chris Carson, and Paul Beckwith, Preparing & Analyzing a Prospective
Contemporaneous Time Impact Analysis, Alpha Corporation and Regency Centers,
August9,2007.(A34)
9.
DamienKeogh,SuccessfulDelayandDisruptionClaims:Presenting theClaim, Irish
ConstructionMagazine,May,2005.(A38)
10.
David A. Norfleet, Understanding Construction Schedule Delays, Professional
InvestigativeEngineers,2004.(A42)
11.
Dennis F. Turner, Building Contract Disputes: Their Avoidance and Resolution,
SecondImpression,LongmanPublisher,1990.(A01)
12. Dr.SatishB.Mohan,andMr.KhalidS.AlGahtani,CurrentDelayAnalysisTechniques
andImprovements,
PS201,
AACE
International
Transactions,
2006.
(A21)
13. Evans M. Barba, Prospective and Retrospective Time Impact Analysis,
Thomson/West,BarbaConsultingInc.,No.20057,July,2005.
14. Gary H. Jentzen, Robin A. Collins, and Dr. Gui Ponce de Leon, Estimating Delay
Damages,C&C.1,AACEInternationalTransactions,1996.(A27)
15.
GeorgeE.Baram,ConcurrentDelaysWhatAreTheyandHowtoDealWithThem?,
CDR.07,AACEInternationalTransactions,2000.(A10)
16. G.K.Killing,W.Kootchar,R.MacAfee,andF.EdumFotwe,ConstructionContractors'
ClaimProcessFramework,JournalofConstructionEngineeringandManagement,Vol.
127,No.4,July/August,2001.(A13)
17.
Hamed A. AlSaggaf, The Five Commandments of Construction Project Delay
Analysis,Cost
Engineering,
Vol.
40,
No.
4,
April
1998.
(A39)
18.
HyunSo Lee,HanGunkRyu, JungHo Yu, and JadeJunKim, Method forCalculating
ScheduleDelayConsideringLostProductivity,JournalofConstructionEngineeringand
Management,November,2005.(A32)
19. JamesG.ZackJr.,ButForSchedulesAnalysisandDefense,CostEngineering,Vol.
43,No.8,August,2001.(A05)
20.
JamesG.ZackJr.,PacingDelaysThePracticalEffect,CostEngineering,Vol.42,No.7,
July,2000.(A33)
-
7/21/2019 Indice Discusiones
2/5
241
21.
JesusM.DeLaGarza,MichaelC.Vorster,andCordellM.Parvin,TotalFloatTradedas
Commodity, Journalof Construction Engineering andManagement,Vol. 117,No. 4,
December,1991.(A41)
22.
John C. Livengood, Retrospective TIAs: Time to Lay Them to Rest, CDR.08, AACE
InternationalTransactions,2007.(A37)
23.
JonathanJingsheng
Shi,
S.
O.
Cheung,
and
David
Arditi,
Construction
Delay
Computation Method, Journal of Construction Engineering and Management,
January/February,2002.(A18)
24.
Joseph s.Ream, DelayAnalysis:ASystematicApproach,CostEngineering,Vol.31,
No.2,February,1989.(A47)
25.
KeithPickavance,DelaysandDisruption InConstructionContracts,SecondEdition,
LLPLondonHonkongInc.,2002.(A23A25)
26. LeeSchumacher,QuantifyingandApportioningDelayonConstructionProjects,Cost
Engineering,Vol.37,No.2,February,1995.
27. LuigiDi Paola and Paolo Spanu, ConcurrentDelays, The International Construction
LawReview,p.373585,2006.(A09)
28.
MarkBoe,
Identifying
Concurrent
Delay,
New
from
CPMI
on
Construction
Claims
AnalysisandResolution,2004.(A30)
29.
Michael S. Simon, Construction Contracts and Claims, PublisherMcGrawHill (Tx)
(April1979).(A15)
30.
Mikhail Chester and ChrisHendrickson, Cost Impacts, Scheduling Impacts, and the
Claims Process During Construction, Journal of Construction Engineering and
Management,Vol.131,No.1,January,2005.(A20)
31. Nagui I. Raid, David Aridity, and Jamshid Mohammadi, Integrated System for
ManagingOwnerDirectedProjectAcceleration, JournalofConstructionEngineering
andManagement,Vol.120,No.1,March,1994.(A45)
32. Ossama A. Hosny, An Artificial Neural Network Approach for Predicting Effect of
Claimson
Project
Time
and
Cost,
Engng.Res.Jour,
Vol.106,
PP.C88
C106,
August,
2006.
(A43)
33.
Robert B.McCullough and Satinder Singh Baweja, Identifying As Built Completion
Drivers,PS.14,AACEInternationalTransactions,2006.(A29)
34.
RogerGibson,Analysisofprojectdelaytheoreticalor interrogationofthe facts?,
GibsonConsultingLtd.,June,2003.(A04)
35. Roy L.Wilson, Prevention and Resolution of Construction Claims, Journal of the
ConstructionDivision,ProceedingsoftheAmericanSocietyofCivilEngineers,Vol.108,
No.C03,ASCE,September,1982.(A35)
36.
R. Max Wideman, Construction Claims Identification, Communication & Record
Keeping,TUNS/RevaySeminar,AEWServices,Vancouver,BC,2001.(A12)
37.
JimmieW.
Hinze,
Construction
Contracts,
Second
Edition,
Publisher
McGraw
Hill,
Inc.,
2009.(A14)
38. Sabah Alkass, Mark Mazerolle and Frank Harris, Construction delay analysis
techniques,ConstructionManagementandEconomics,Vol.14,p.375394,1996.
39. SalehMubarak,ConstructionProjectSchedulingandControl,PearsonPrenticeHall
2005.(A07)
-
7/21/2019 Indice Discusiones
3/5
242
40.
Saied Kartam, Generic Methodology for Analyzing Delay Claims, Journal of
Construction Engineering and Management, Vol. 125, No. 6, November/December,
1999.(A28)
41.
SevtalanaLyasko,DailySpecificAsBuiltinAsPlannedvs.AsBuiltScheduleAnalysis,
CostEngineeringVol.50,No.3,March2008.
42.
Societyof
Construction
Law,
SCL
Delay
and
Disruption
Protocol
Printmost
(Southern)
Ltd.,March,2003.(A36)
43. StephenScott, DelayClaims inU.K.Contracts, JournalofConstructionEngineering
andManagement,Vol.123,No.3,September,1997.(A24)
44. TarekHegazyandChuiZhang,DailyWindowsDelayAnalysis,JournalofConstruction
EngineeringandManagement,Vol.131,No.5,May1,2005.(A22)
45.
TheWorldBankandtheInternationalFinanceCorporation(IFC),DoingBusiness2010
Egypt,ArabRepublic,The InternationalBank forReconstructionandDevelopment /
TheWorldBank,2009.(A44)
46. Thomas F. Peters, Dissecting the Doctrine of Concurrent Delay, CDR.01, AACE
InternationalTransactions,2003.(A26)
47.
VeraA.
Lovejoy,
Claims
Schedule
Development
and
Analysis:
Collapsed
As
Built
SchedulingforBeginners,CostEngineering,Vol.46,No.1,January,2004.(A08)
48.
VincentPowellSmithandMichaelFurmston,ABuildingContractCasebook,Second
Edition,GrandaPublishing,1990.
49.
William Schwartzkopf and John J. McNamara, Calculating construction Damages,
SecondEdition,ASPENPublishers,Update2010.(A06)
50.
YoungjaeKim,KyungraiKim,andDongwooShin,DelayAnalysisMethodUsingDelay
Section,JournalofConstructionEngineeringandManagement,November,2005.(A
51.
ZartabQ.Zafar,ConstructionProjectDelayAnalysis,CostEngineering,Vol.38,No.3,