![Page 1: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/1.jpg)
![Page 2: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/2.jpg)
Index
S. No. Title Page No.
1. Final Report 1-17
2. List of 1000 Beneficiaries (Appendix-I) 18-37
3. Case Studies (Appendix –II) 38-48
4. Completion Certificates (Appendix-III) 49-65
5. Financial Detail (Appendix-IV) 66-67
![Page 3: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/3.jpg)
FINAL REPORT
![Page 4: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/4.jpg)
1
FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan
and Bihar
1. Project Title : UJALA Project
2. Project Period : September’ 2010 – June’ 2012
3. Financial Support : Anandana (Coca–Cola India Foundation)
4. Implemented by : Social Action for Rural Advancement
(SARA) Village Laxmipura Tehsil Danta
Ramgarh District Sikar and Village
Communities of 20 villages in Rajasthan
and Bihar
5. Project Budget : Rs. 20,350,000/-
6. Project Expenditure : Rs. 20,359,498/-
7. Project Area covered : 20 off-grid villages in 6 districts of
Rajasthan and Bihar Direct Impact: 10,000
people.
![Page 5: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/5.jpg)
2
8. Women Barefoot Solar Engineers: 20 semi-literate women from each
project village have been trained as ‘Barefoot Solar Engineers’ in two
batches before installation of solar lighting units in the houses. Total
1000 houses in 20 villages have been solar electrified by the 20 trained
women barefoot solar engineers. All the solar lighting units will be
maintained regularly by the women barefoot solar engineers at village
level established solar powered Rural Electronic Workshop (REW)
provided with stock of spares for next 5/7 years, and electronic items
and tools thus the approach is technically sustainable under the
control of village communities.
The Village Communities will contribute for spares and stipend for
barefoot solar engineers- this is a financial strength to monitor at the
communities level.
Third, it empowers rural women being women barefoot solar engineers in
their own community.
9. Profiles of 20 Women Barefoot Solar Engineers:
a) Bihar
1. Rekha (30 Years) Illiterate Village- JP Nagar Gaya District Bihar Children: 4 Occupation: Agriculture/Casual Labour
2. Geeta (27 Years) Middle School Village- Banai Gaya District Bihar Children: 2 Occupation: Agriculture/Casual Labour
![Page 6: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/6.jpg)
3
b) Rajasthan
3. Soni Devi (30 Years) Middle School Village- Goria Sikar District Children: 2 Occupation: Domestic/Casual Labour
4. Bimala Devi (30 Years) Litterate Village- Bay Sikar District Children: 3 Occupation: Domestic/Casual Labour
5. Nirmala (30 Years) Litterate Village- Karad Sikar District Children: 2 Occupation: Domestic/Casual Labour
6. Krishna Kanwar (48 Years) Literate Village- Laxmipura District Sikar Children: 4 Occupation: Agriculture/ Labour
7. Santosh Devi (32 Years) Literate Village- Gopinathpura District Sikar Children: 3 Occupation: Agriculture/ Labour
8. AnchiDevi (37 Years) Literate Village- Khariya-ki-Dhani District Sikar Children: 4 Occupation: Agriculture/ Labour
9. Santosh (35 Years) Literate Village- Solavta Jaipur District Children: 3 Occupation: Domestic/Casual Labour
![Page 7: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/7.jpg)
4
10. Prabhu (45 Years) Illiterate Village- Bhirawata Jaipur District Children: 8 Occupation: Agriculture/Casual Labour
11. Sangita Kanwar (35 Years) Literate Village- Solavta District Jaipur Children: 2 Occupation: Agriculture/ Domestic
12. Zanat Bano (32 Years) Illiterate Village- Hachukara District Jaipur Children: 0 Occupation: Agriculture/ Domestic
13. Maina Devi (37 Years) Literate Village- Nangal District Jaipur Children: 2 Occupation: Agriculture/ Labour
14. Maya Devi (31 Years) Literate Village- Habaspura District Jaipur Children: 1 Occupation: Agriculture/ Labour
15. Pushpa Devi (40 Years) Literate Village- Badkochra District Ajmer Children: 2 Occupation: Agriculture/ Labour
16. Sita Devi (40 Years) Illiterate Village- Badkochra District Ajmer Children: 3 Occupation: Agriculture/ Labour
![Page 8: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/8.jpg)
5
17. Geeta Devi (38 Years) Illiterate Village- Meghgaon District Nagour Children: 0 Occupation: Agriculture/ Labour
18. Dakhan Devi (50 Years) Illiterate Village- Meghgaon District Nagour Children: 6 Occupation: Agriculture/ Labour
19. Vimala Devi (23 Years) Literate Village- Band District Barmer Children: 1 Occupation: Agriculture/ Labour
20. Sohani Devi (23 Years) Literate Village- Khadali District Barmer Children: 1 Occupation: Agriculture/ Labour
10. Non electrified Villages covered (Details of Houses Appendix-I) State District Name of villages No. of Houses 1. Rajasthan 1. Barmer 1. Khariyali Nadi 150
2. Ajmer 2. Sunadia 3. Badkochra 4. Tatgarh
170
3. Nagaur 5. Mehgaon 6. Arath
150
4. Jaipur 7. Bhirawata 8. Habaspura 9. Nangal 10. Solavta 11. Udaipuria Dungri 12. Hachukada
155
5. Sikar 13. Gopinathpura 14. Goria 15. Laxmipura 16. Bay Kotri 17. Chak Mitai 18. Dantala
175
2. Bihar 6. Gaya 19. Banai 20. JP Nagar
200
Total Houses solar electrified 1000
![Page 9: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/9.jpg)
6
11. Profile of Implementing Organisation: Social Action for Rural Advancement (SARA) Society is community based organization affiliated with Barefoot College, has a long experience of working with rural community in Sikar, Jaipur and Nagaur districts of Rajasthan since 1992. The Organisation is registered under the Rajasthan Societies Registration Act 28, 1958 at Sikar on 26th February 1992.
Organization had previously addressed basic needs of the community and introduced several technological interventions such as availability of drinking water, technology trainings for skill up-gradation & low cost community and individual structures. Organizational team members are trained and practicing solar technology from last 7 years.
• Name of Organisation: o Social Action for Rural Advancement (SARA)
• Postal Address: o Village - Laxmipura, o P.O. - Rajpura-Nosal, Block - Danta Ramgarh o District - Sikar, State - Rajasthan - 332 742
• Contact Person: o Mota Ram
• Telephone/ e-mail/website: o Phone: 01577-250080, 250081 o Mobile: 09414297564 o E-mail: [email protected] o Website: www.barefootsara.in
• Details of Registration: o Rajasthan Societies Registration Act, 1958. o Registration No.: 80/Sikar/1991-92 o Date of Registration: 26.02.1992
• Details of Foreign Contributions Regulation Act 1976: o Registration No.: 125650002 o Date of Registration: 12.04.1996
![Page 10: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/10.jpg)
7
12. Project activities completed
• Preparation of 20 Village Communities for solar
electrification.
• Trained 20 women barefoot solar engineers before solar
electrification of 1000 houses and its regular maintenance by them.
![Page 11: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/11.jpg)
8
• Village communities contributed down payment for replacement
of batteries after 5/6 years of installation and monthly
contribution for maintenance of solar units lanterns along with
stipend to trained women barefoot solar engineers. The
contribution has been put into the bank accounts of village
communities for its financial sustainability.
• 1000 houses in 20 villages of 6 districts of Rajasthan and
Bihar states have been solar electrified by 20 women barefoot
solar engineers.
• Established 20 Solar Powered Rural Electronic Workshops for
fabrication, repair and maintenance of all the solar lighting
units at village through Barefoot Solar Engineers.
![Page 12: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/12.jpg)
9
• A Completion Certificate of each village has been given by the
Village Communities/ Panchayats. The first time the village communities have passed such resolutions that should be considered the final completion certificate. (Appendix-III Completion Certificates)
![Page 13: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/13.jpg)
10
13. Lessons learnt:
It has proved illiterate rural women could able to fabricate, repair
and maintain solar lighting systems at village level on receiving 6
months barefoot solar engineers’ training. This approach empowers
women with self respect and dignity among the village communities.
(Appendix-II Case Studies of each village)
The process is entirely community owned and controlled by
them. Thus it is fully technical and financial sustainable model.
It is being replicated other parts of Rajasthan, Bihar and Jharkhand
States through selection and training of women barefoot solar engineers.
Besides the project activities women Barefoot Solar Engineers are
being fabricated 2000 solar lanterns and 1000 solar lighting units at
Rural Electronic Workshop Laxmipura. It sets an example of self
confidence and livelihood sources.
Rural Solar Fabrication Workshop
![Page 14: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/14.jpg)
11
14. Social Audit : All the expenditures with accounts of the project
have been kept open to public scrutiny and displayed posters, charts
sharing project information among the villages communities at
Bhirawata Village in Jaipur District on 17th April 2012.
Project Activities Approved Budget Rs.
Total Expenditures Rs.
-/+
I. Training of 20 women Barefoot Solar Engineers for 6 months
3,000,000 3,001,240 +1,240
II. Fabrication and Installation of 1000 Home Lighting Units
12,000,000 12,008,045 +8,045
III. Establishment of 20 solar powered Electronic Workshops with spare, tool and equipment
3,000,000 2,994,992 -5,008
IV. Installation of 1000 Solar Units
500,000 500,000 0
V. Administration costs in preparation village communities, human resources, travel, documentation and others
1,850,000 1,855,221 +5,221
VI. Total Rs. 20,350,000 20,359,498 +9,498
![Page 15: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/15.jpg)
12
I. Project Expenditures as on March 2012 displayed in the social audit
II. Village-wise details of each beneficiary displayed on walls in the
project villages and verified by the village communities for final approval.
![Page 16: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/16.jpg)
13
III. Shri Sanjay Rawal and Ms. Parvati Krishnan of the Coca Cola India Foundation and Village Head in the Social Audit
IV. Shri Sanjay Rawal and Ms. Parvati Krishnan were briefed about social auditing and transparency of accounting by Shri Mota Ram of SARA Organisation based at Laxmipura Village in Sikar District
![Page 17: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/17.jpg)
14
V. Women from project area of Jaipur District along with Barefoot
Solar Engineer Trainees from 8 Countries of Africa, South America
and South Pacific participated in the social audit Mela(Fair).
VI. Shri Sanjay Rawal visited solar beneficiary family in Bhirawata
village
![Page 18: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/18.jpg)
15
VII. Community of Solavta village in Jaipur District of Rajasthan
visited by Ms. Parvati on 8-9 June 2011
VIII. News Clippings
![Page 19: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/19.jpg)
16
![Page 20: Index [] Project Report.pdf · 1" FINAL REPORT Solar Electrification of 1000 Houses in 20 Off grid Villages of Rajasthan and Bihar 1. Project Title : UJALA Project 2. Project Period](https://reader031.fdocuments.us/reader031/viewer/2022020412/5afc35cd7f8b9a434e8bcdd3/html5/thumbnails/20.jpg)
17
15. Consolidate Audited Statement of Accounts (Appendix-IV Financial
Statement)
For SARA Laxmipura Dist. Sikar Rajasthan Date: 5th August 2012