Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 1
1. PROJECT LOCATION MAP :
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 2
2. EXECUTIVE SUMMARY :
The Government of India (GOI) through Ministry of Shipping Road Transport & Highways
(MORT & H) is contemplating to enhance the traffic capacity and safety for efficient
transportation of goods as well as passenger traffic on the very heavy traffic intensity National
Highways. The Government of India had entrusted to National Highways Authority of India
(NHAI) for the development, maintenance and management of NH-7 from km 33+130 to km
93+000 (59.87km) in the state of Tamil Nadu.
In order to provide a better level of service to the vehicular traffic and to augment the capacity of
NH 07 (NH-44 New) by widening the existing four lane to six lanes divided carriageway facility
including rehabilitation/strengthening of the existing four lane, it has been decided to carry out the
works under NHDP Phase V as BOT (Toll) on Design, Build, Finance, Operate & Transfer
(DBFOT) basis.
3. SCOPE OF THE PROJECT :
The scope of the project include the following during the concession period:
• Construction of the project highway as set forth in Schedule–A and as specified in Schedule–B
together with provision of Project Facilities as specified in Schedule–C and standards as set
forth in Schedule–D of the concession agreement with other applicable standard specification.
• Operation and Maintenance of the project highway in accordance with the provisions of the
concession agreement of Schedule “K”
• Performance and fulfillment of all other obligations of the Concessionaire in accordance with
the provisions of Agreement and matters incidental thereto or necessary for the performance of
any or all of the obligations of the concession agreement by the Concessionaire.
• Six laning shall be undertaken and completed by the Concessionaire in conformity with
specifications and standards set forth in Annex- I of Schedule –D of CA.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 3
4. PROJECT MILE STONES :
SR.
NO. MILESTONES
PERIOD FROM
APPOINTMENT
DATE
DESCRIPTION
1 Milestone - I 255 days
255 days from the appointed date i.e. 16-02-2012 –
Commenced construction of project highway and
expended not less than ten percentages (10%) of the
total capital cost of the project set forth in the financial
package.
2 Milestone - II 512 days
512 days from the appointed date i.e. 27-01-2013 –
Commenced construction of all bridges and expended
not less than thirty five percentage (35%) of the total
capital cost of the project set forth in the financial
package.
3 Milestone - III 717days
717 days from the appointed date i.e. 28-10-2013 –
Commenced construction of all facilities of the project
and expended not less than seventy percentage (70%)
of the total capital cost of the project set forth in the
financial package.
4
Scheduled Six
Laning with
Service Lane
Date
912days
The Scheduled Six Laning date shall occur on the
912th (Nine Hundred and Twelve) day from the
appointed date i.e. 04-12-2013 On or before the
scheduled six laning date, the Concessionaire shall
have completed six laning projects.
Mile stones –I, II and III have already been achieved by the Concessionaire.
Note: For Schedule six laning EOT – I approved up to 30th
May 2014. EOT – II submitted 15th
Nov
2015 by the Concessionaire and recommended by IE up to 03rd
May 2015
Mile Stone :
Sl Mile Stone
Total
days
Ending
Date Percentage
EPC
Cost
(Crores)
To be
Expended
(Crores) Expended (Crores)
1 Mile Stone -1 255 16-Feb-12 10% 925.44 92.54 118.14
2 Mile Stone -2 512 27-Jan-13 35% 323.90 325.05
3 Mile Stone -3 717 28-Oct-13 70% 647.81 666.39
4
Scheduled six
laning date 912 04-Dec-13 100% Progress
Time extension
recommended by IE up to
03rd
May-2015
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 4
5. SALIENT FEATURES:
The Authority National Highways Authority of India
Name of the Project
Six laning of Hosur-Krishnagiri Section of NH-07 from
km 33+130 to km: 93+000 (Length – Km 59.87) in the
State of Tamil Nadu Under NHDP Phase V as BOT
(TOLL) on DBFOT basis.
Independent Engineer /
Consultants
CDM Smith Inc. In Joint Venture with
Wilbur Smith Associates Pvt Ltd
Agreement date of IE: 14th
Aug 2012
The Concessionaire M/s Hosur-Krishangiri Toll Road Limited
The EPC Contractor M/s Reliance Utility Engineers Pvt.Ltd.
Construction Contractor M/s L & T Limited.
Date of agreement 2nd
July 2010
Period of Construction 30 Months
Date of Commencement of
Construction 7
th June 2011
Date of Completion of
Construction 4
th December 2013
The Concession Period 24 years
Project Capital Cost � 925.44 Crores.
EPC Cost � 840.00 Crores
Project Length � 59.870 kms
Lenders Engineer M/s. Frischman Prabhu
Lenders Name Canara Bank-Mumbai
Lenders Contribution � 555.00 Crores.
Premium to NHAI � 66.90 Crores with an escalation of 5% per year
Contribution by Concessionaire � 370.44 Crores
Flyover 6 Nos (Repair -3, New – 3)
Vehicular Under Passes 5 Nos ( New Construction)
Pedestrian Under Passes 8 Nos (New Construction)
Toll Plaza 1 No (Existing) @Ch:87+500
Major Bridges 1 No.
Minor Bridges 13 Nos (Widening- 3, New- 4, Repair-6)
Box/Slab Culverts 109 Nos (Widening and Repair, Rehabilitation)
Pipe Culverts 34 Nos (Widening and Repair, Rehabilitation)
Track Lay bay with Rest Area 1 No.
Major & Minor Junctions 9 & 66 Nos Respectively
Length of Service Road 54.38 kms
Bus Byes with Bus Shelters 66 Nos (LHS-30nos,RHS 36nos)
Change of scope Upgraded PUP at Km.44+950
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 5
6. PROJECT HIGHWAY PAVEMENT CONFIGURATIONS:
Scope of Work and Cross Sections:
Description Scope Design Chainage (km)
From To Length
Main Carriage Way Six lane 33.130 93.000 59.87
Service Road Two lane 33.130 93.000 27.19 both sides
The Existing LHS (ie Hosur to Krishnagiri) carriageway between Km 68.100 to Km68+900 is proposed
to be used as carriageway of Service road on LHS.
Pavement Configurations:
Carriageway
Type of
carriageway
(Flexible/Rigid)
Chainage
(from -
to)
Name of
Layer
Design
Thickness
in mm
Total
Thickness
MCW Flexible
33+130 to
93+000
except toll
plaza
location
BC 40 mm
610mm DBM 120 mm
WMM 250 mm
GSB 200 mm
Sub grade 500 mm 500mm
Service road Flexible 33+130 to
93+000
BC 40 mm
540mm DBM 50 mm
WMM 250 mm
GSB 200 mm
Sub grade 500 mm 500mm
Rigid Pavement for Toll Plaza :
The Location at Ch. Km 87+500. There are no Design details for concrete pavement at the Toll Plaza
area in design report.
Rest Area :
The available land between the carriageways from Ch. Km 68+300 to 68+800 LHS is to be developed as
truck lay bye and Rest area Facilities, and the existing road to be used as carriage way of service road
on LHS
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 6
7 . Typical Cross-Section:
Typical cross sections are detailed as below:
Sl
.
no
Type of Cross Section Code Length
( m)
1
6 – lane cross section with raised median + embankment slope(2H:1V)on both
sides + unlined longitudinal drain on both sides + both sides 7.0 m paved
service road with 0.75 m earthen shoulder on both sides + utility corridor on
both sides in non-built up areas
Type – 1 1460
2 6 – lane cross section with raised median + embankment slope(2H:1V),
unlined longitudinal drain & utility corridor on both sides in non-built up areas Type – 2 26880
3
6 – lane cross section with raised median +1.50 m wide separator – cum –lined
covered drain (RCC) with M.S railing between paved shoulder & 7.00 m
paved service road on both sides- 1.50 m wide footpath – cum – utility duct
(RCC) on both sides in urban areas
Type – 3 9430
4
6 – lane cross section with raised median +1.50 m wide separator – cum –lined
covered drain (RCC) with M.S railing between paved shoulder & 7.00 m
paved service road on both sides- 1.50 m wide footpath – cum – utility duct
(RCC) on both sides in urban areas ( Shifting of Existing Center line to L.H.S)
Type – 4 3375
5
6 – lane cross section with raised median +1.50 m wide separator – cum –lined
covered drain (RCC) with M.S railing between paved shoulder & 7.00 m
paved service road on both sides- 1.50 m wide footpath – cum – utility duct
(RCC) on both sides in urban areas ( Shifting of Existing Center line to R.H.S)
Type – 5 530
6
6 – lane Approach cross – section for Flyover/ Underpass with R.E
Wall/R.C.C Retaining Wall upto FRL with friction slab & RCC Crash barrier
( excluding Via – Duct portion) + raised median + 1.50 m wide separator –
cum – lined covered drain (RCC)between approach & 7.00 m paved service
road on both sides + 1.50 m wide footpath – cum – utility duct ( RCC) on both
sides
Type – 6 6810
7
6 – lane Approach cross – section for Flyover/ Underpass with R.E
Wall/R.C.C Retaining Wall upto FRL with friction slab & RCC Crash barrier
( excluding Via – Duct portion) + raised median + 1.50 m wide separator –
cum – lined covered drain (RCC)between approach & 7.00 m paved service
road on both sides + 1.50 m wide footpath – cum – utility duct ( RCC) on both
sides (Shifting of Existing Center line)
Type – 7 1545
8 6 – lane cross section with raised median + embankment slope
(2H:1V)&unlined longitudinal drain on both sides in hilly/forest areas Type – 8 5700
9 Toll Plaza Toll Plaza 450
10 Major bridge Major
bridge 120
11 Existing Flyover with 6 – lane configuration with exiting service road. Existing
Flyover 2520
12
Uni –directional flyover with 3 – lane Flyover Approach cross – section with
13.50 m deck width R.E Wall/R.C.C Retaining Wall up to FRL with friction
slab RCC Crash barrier (excluding Via-Duct portion)+1.50m wide separator-
cum-lined covered drain (RCC)between approach & 7.00m paved service road
on RHS +1.50m wide footpath-cum utility duct(RCC) ON RHS.
Uni –
directional
Flyover
1050
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Progress Report – January 2015 Page 7
8. STATUS OF MOBILIZATION OF INDEPENDENT ENGINEER
SI Name Designation
Date
No Mobilized
Key Personnel (Professional Staffs)
1 TBN Team Leader Not Mobilized **
2 Mr. C.V.Krishna Reddy Acting Team Leader cum
Resident Engineer
01.12.2012
3 Mrs. Padmaja Jayakumar Sr. Bridge Design Engineer 05.09.2012
4 Mr. Gagan Trivedi Highway Design Engineer 05.09.2012
5 Mr. K.C.Sathiya Murthi Bridge / Structural Engineer 04.09.2012
6 Dr .Jimmy Thomas Sr. Pavement Specialist 15.10.2012
7 Mr. N.Madhsudana Chowdary Sr. Quality cum Material Expert 15.10.2012
8 Mr. P. Hariharan Traffic & Transportation Expert
9 Mr. R. Krishna Murthy Road Safety Expert 05.09.2012
10 Mr. Shankar Narayana Financial Expert 15.11.2012
11 Mr. J.Dhanvanth Legal Expert
Sub-Professionals Staffs:
1 Mr. S.Ramesh Babu Survey Engineer-1 08.10.2012
2 TBN Survey Engineer-2 Not Mobilized
3 Mr. R.Ashok Kumar Asst. Highway Engineer-1 03.04.2013
4 TBN Asst. Highway Engineer-2 Not Mobilized
5 TBN Asst. Bridge Engineer-1 Not Mobilized
6 TBN Asst. Bridge Engineer-2 Not Mobilized
7 Prasanth .K.Deshpande
Asst. Quality cum Material
Engineer-1 19.01.2015
8 Mr. J.Selva Kumar
Asst. Quality cum Material
Engineer-2 11.10.2012
9 TBN Quantity Surveyor -1 Not Mobilized
10 Mr. Ayyappan Nair CAD Expert-1 16.11.2012
11 Mr. Shashikanth.Joshi Electrical Engineer 22.09.2012
12 Mr. V.Rangarajan HTMS/Toll Expert 22.09.2012
13 Mr. Rajesh varghese Environmental Engineer 10.10.2012
14 Dr. K. Malla Reddy
Horticulture cum Landscaping
Expert 22.09.2012
TBN: To be Named
**: Shri P J Xavier worked as Team Leader from 27.08.2012 to 06.03.2014 and resigned on personal
reason.
Monthly Inspection Report – January Page
8.1 ORGANIZATIONAL CHART :
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
January Page 8
ORGANIZATIONAL CHART :
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 9
9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS.
PROGRESS UP TO 31
st Jan 2015
9.1.a. HIGHWAYS - MCW & Service Road
Sl Description Unit
Total Scope (Km)
Completed Percentage
achieved %
1 Clearing & Grubbing Km 159.17 157.91 99.21%
2 Excavation Km 159.17 156.57 98.37%
3 Embankment Top Km 159.17 154.16 96.85%
4 Sub Grade Top Km 159.17 153.42 96.39%
5 GSB Km 159.17 152.91 96.07%
6 WMM-1 Km 159.17 150.17 94.35%
7 WMM - 2 Km 159.17 149.10 93.67%
8 DBM - Widening Km 159.17 152.23 95.63%
9 DBM - Overlay Km 101.70 101.70 100.00%
10 BC Km 171.64 117.48 68.44%
9.1.b. HIGHWAYS - MCW
Sl Description Unit Total Scope (Km) Completed
Percentage achieved
1 Clearing & Grubbing Km 111.49 111.49 100.00%
2 Excavation Km 111.49 111.49 100.00%
3 Embankment Top Km 111.49 109.62 98.32%
4 Sub Grade Top Km 111.49 109.60 98.30%
5 GSB Km 111.49 109.46 98.18%
6 WMM-1 Km 111.49 109.54 98.25%
7 WMM - 2 Km 111.49 109.06 97.82%
8 DBM - Widening Km 111.49 109.38 98.10%
9 DBM - Overlay Km 101.7 101.70 100.00%
10 BC Km 117.34 104.7 89.22%
11 PQC Km 1.2 Existing (Toll Plaza at Ch. 87+330
to 87+930 – Both Sides)
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 10
9.1.c. HIGHWAYS -Service Road
Sl Description Unit Total Scope
(Km) Completed
Percentage achieved
1 Clearing & Grubbing Km 47.68 46.42 97.36%
2 Excavation Km 47.68 45.08 94.55%
3 Embankment Top Km 47.68 44.54 93.41%
4 Sub Grade Top Km 47.68 43.82 91.90%
5 GSB Km 47.68 43.45 91.13%
6 WMM-1 Km 47.68 40.63 85.21%
7 WMM - 2 Km 47.68 40.04 83.98%
8 DBM Km 47.68 42.85 89.86%
9 BC Km 54.3 12.78 23.53%
10 PQC `Km 0.9 Existing (At Ch. 39+640 to 40+540
LHS Service Road)
** The Existing carriageway LHS (i.e. Hosur to Krishnagiri ) carriageway between Km 68.100 to Km 68.900 is proposed to be used as carriageway of service road on LHS.
9.1.d. Structure:
Sl. No
Structure Unit As Per
CA Additional Total
Work to be
done at site
In Progress
Completed Remarks
1 Box Culverts Nos 108 1 109 99 3 95 1 no yet to
start
2 Pipe Culverts Nos 32 2 34 30 1 29 3 nos not in
site,1 no cross road
3 Minor Bridge Nos 10 - 10 4
4
4 Major Bridge Nos 1 - 1 1
1
5 Flyovers Nos 3 - 3 3
3
6 Vehicular Under pass
Nos 5 - 5 5
5
7 Pedestrian Under pass
Nos 8 - 8 8 8
8 Girders casting - Nos
Nos 224 - 224 224
9 RE wall Panel Casting
Sqm 68,500 - 68,500 68,500
10 RE wall Erection
Sqm 67,252 - 67,265 67,265
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 11
9.1.e.Major structures status:
Sl.no Description Location Status Remarks
1 Major Bridge 77+993 Completed miscellaneous works are in progress
2 Minor Bridge 33+297 Completed miscellaneous works are in progress.
3 Minor Bridge 38+520 Completed miscellaneous works are in progress
4 Minor Bridge 47+035
Completed miscellaneous works are in progress.
Completed miscellaneous works are in progress.
5 Minor Bridge 68+340 Completed miscellaneous works are in progress.
6 Flyover 39+022 Completed miscellaneous works are in progress.
7 Flyover 40+990
Completed miscellaneous works are in progress.
Completed miscellaneous works are in progress.
8 Flyover 92+385 Completed miscellaneous works are in progress.
9 VUP 45+950 Completed miscellaneous works are in progress.
10 VUP 61+845 Completed miscellaneous works are in progress
11 VUP 62+850 Completed miscellaneous works are in progress
12 VUP 77+412 Completed miscellaneous works are in progress
13 VUP 84+760 Completed miscellaneous works are in progress
14 PUP 34+000 Completed miscellaneous works are in progress.
15 PUP 36+550 Completed miscellaneous works are in progress
16 PUP (VUP) 44+950 Completed miscellaneous works are in progress
17 PUP 53+620 Completed miscellaneous works are in progress
18 PUP 78+536 Completed miscellaneous works are in progress
19 PUP 82+475 Completed miscellaneous works are in progress
20 PUP 87+010 Completed miscellaneous works are in progress
21 PUP 91+500 Completed miscellaneous works are in progress
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 12
RE WALL STATUS - As on 31.01.2015
Structure
Location Wall Structure
RE WALL
AREA (Sqm) Completed Balance Remarks
34+000 RE WALL PUP
2,676.0
2,675.980 - completed
36+550 RE WALL PUP
2,820.9
2,820.910 - completed
39+022 RE WALL Flyover
9,365.0
9,365.000 - completed
40+990 RE WALL Flyover
5,951.4
5,951.407 - completed
44+950 RE WALL PUP
4,047.4
4,047.350 - completed
45+950 RE WALL VUP
6,320.0
6,320.000 - completed
61+845 RE WALL VUP
5,623.5
5,623.514 - completed
62+850 RE WALL VUP
5,964.0
5,964.000 - completed
77+410 RE WALL VUP
7,050.4
7,050.420 - completed
82+475 RE WALL PUP
2,580.0
2,580.000 - completed
84+760 RE WALL VUP
7,095.5
7,095.507 - completed
87+000 RE WALL PUP
2,717.3
2,717.300 - completed
91+510 RE WALL PUP
2,550.0
2,550.000 - completed
92+385 RE WALL Flyover
2,503.2
2,503.157 - completed
67,265
67,265
-
53+620 Retaining wall (RCC)
PUP
2,520.0
2,520.000 - completed
78+536 Retaining wall (RCC)
PUP
1,750.0
1,750.000 - completed
-
4,270.00
4,270.00
-
-
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 13
9.1.f. STATUS OF PROJECT FACILITIES :
Sl.No Description UoM Scope Status
1 Toll Plaza Ls 1 ETC work is in Progress
2 Rest Area No 1
GSB completed in parking area. Restaurant & Dormitory buildings slab work completed. Toilet block slab completed
3 Bus Bay No 66
35 No’s Paver block completed. 13 No’s WMM completed. 02 No’s GSB completed. 03 No’s excavation completed.
4 Bus Shelter No 66 36 No’s erection completed Roof Sheeting – 17 Nos completed, Seat – 20 Nos.
5 Minor Junction No 66 20 Nos BC completed 09 Nos DBM completed 10 Nos WMM completed
6 Major Junction No 9 2 Nos BC completed
7 Road Marking Km 173.22 102 Km completed ( MCW only)
8 Providing All Sign
Boarders/Studs/Delineator
Nos 1115 Erection of sign boards in progress. 590 Nos sign boards erected.
9 MS Railing/Guard Rails Rm 40000 17.30 Km. MS Railing / Guard railing completed /6.9 Km. Median MBCB completed
10 Highway Lighting Ls 1.00
260 Nos of Bus bay foundation pedestal erected (115 Nos Bracket fixing completed.) 187 Nos Median foundation pedestal erected. Electrical poles erection started from 88+000 to 90+000
11 Landscaping and Tree Plantation Ls 1.00 Avenue Plantation started. 1.5Km completed.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 14
Progress up to 31-01-2015.
Description Target Achieved Ahead / -Behind
Physical Progress ( % ) 93.52 87 -6.52
Cumulative Physical Progress:
Physical Progress Up to Dec 2015 This month Up to Jan-2015
Cumulative Schedule Progress (%) 91.34 2.18 93.52
Cumulative achieved progress (%) 86.49 0.51 87
Cumulative Financial Progress - work done ₹ 840.00 Crs
Details Up to Dec 2015 This month Up to Jan-2015
Cumulative Schedule Expenditure (Rs. in Crores)
757.050 20.910 777.960
Cumulative Achieved Expenditure (Rs.in Crores)
718.000 11.000 729.000
(%) Cumulative Achieved Progress 85.48% 1.31% 86.79%
Sl Description Amount
Remarks
1 Total work done up to December -2014 Rs. 718.00 Crores
Expended EPC cost up to January -2015 Rs. 729.00 Crores For 840 Crores
Overheads and other expenses Rs. 83.00 Crores
Expended Total Project cost up to January -2015 Rs. 812.00 Crores For 925.44Crores
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 15
9.2 Design / Drawing Submission Status :
9.2.b. Structures:
Sl.
No Description Unit
Total
Scope Submitted
Balance to
be submitted Remarks
1 Major Bridges No 1 1 -
2 Minor Bridges No 4 4 -
4 Fly Over No 3 3 -
5 Vehicular Under Pass No 5 5 -
6 Pedestrian Under Pass No 8 8 -
7 Pipe Culverts No 30 29 -
8 Box/Slab culverts No 99 98 1
9 RE wall No 14 14 -
10 RCC Wall No 2 2 -
9.2.a. Highways : Sl.no Description Remarks
1 Base plan Submitted
2 Project Quality Plan Submitted
3 Construction Programme Submitted
4 Survey & Engineering Report Submitted
5 Environmental Management Plan Submitted
6 Health & safety Management Plan Submitted
7 Typical C/S Submitted
8 Submission of Traffic Assessment and pavement Design Report Submitted
9
Submission of plan and profile drawing for Main Carriageway and
Service Road Submitted
10 Submission of Project Facilities as per modified Schedule – “C”
Under
Progress
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 16
9.2.C.Drawing Status of Project Facilities For Six-Laning (Schedule - C)
Sl
Description as
per CA schedule
- 'C'
Drawings
submitted to IE
from
Concessionaire
Lr. no.
Reviewed
from IE Lr.
No
Status
Drawing Remarks
1 Toll plaza 1388 /
21.11.2014
735 /
18.12.2014
Review in
progress
Adminstrative building
started without layout
approval of Toll Plaza
Expansion
2 Road side furniture plan
i
Traffic Signs: It
includes Road
side signs, over
head signs and
kerb mounted
signs.
1211 /
10.7.2014
742/
19.12.2014
Review in
progress Work is in progress
ii
Over head signs
:- 16
nor (excluding
toll plaza)
1355 /
16.10.2014
769 /
02.01.2015
Review
under
progress
Work is in progress
a) 14 Nos -
cantiliver (4.00 ×
1.2 m)
b) 2 Nos over
head sign (3 lane
width × 1.2 m)
iii
Pavement
Marking
650 /
27.06.2013
436
/11.6.2014
Review
Completed Work is in progress
iv
LED Traffic
Beacons
Pending
with
HKTRPL
Drawings Not submitted
v
Delineators and
studs
1447 /
05.01.2015
780 /
12.01.2015
Review in
progress Submitted
vi
Boundary stones
& 200m stones 1026 /
06.05.2014
Review in
progress
Work Started, GFC has
to be submit
vii
Hectometer /
Kilometer stones
3 Highway
Lighting
1274 /
25.08.2014
768 /
31.12.2015
Review in
progress
Work is in progress
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 17
4
Pedestrian Facilities
(i)Pedestrian
guardrail
(ii)Walkway
1236 /
28.07.2014
529 /
11.8.2014
Pending
with
HKTRPL
Started without Third
Party testing
(iii) Ramp/Steps - - - Not required
(iv) Pedestrain
Crossing - - - Drawings Not submitted
5 Landscaping and tree plantation
i) Median
Plantation
442 /
27.08.2013
279 /
20.09.2013
Review
Completed Started but slow progress
ii) Lanscaping
1160 /
11.06.2014
153 /
24.06.2014
Review in
progress Work is in progress
iii) Avenue
Plantation 442 / 27.08.2013
279 /
20.09.2014
Review
Completed Not started
6 Rest Area (Service Area)
Rest area layout
1387 /
21.11.2014
759 /
26.12.2014 Review in
progress Work is in progress
Rest area building
and other facilities 1187 / 7.7.2014
757 /
26.12.2014
7 Bus lay bay & Bus Shelter
i) Bus lay bay
Drawings - Main
carriageway &
service road
1216 /
14.07.2014
795/ 20.01-
2015
Review in
progress Work in Progress
ii) Bus Shelter
1166 /
12.06.2014
366 /
28.04.2014
Review
Completed Work is in progress
8 Highway Patrol Facility provided
9 Ambulance Facility provided
10 Cranes Facility Provided
11 ATMS 1106 /
29.04.2014
306 /
06.12.2014
Pending
with
HKTRPL
Design and Drawing not
submitted
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 18
9.2.d. Drawing Status for Structures
Sl. Structure Chainage Submitted Status
1 Pipe Culvert
23Nos CDM/252 dated 12.02.2014
CDM/307 dated 18.03.2014 GFC
6 Nos CDM 376 dated 12.05.2014
GFC CDM: 377 dated 13 May 2014
2 Box Culvert 98 Nos
CDM/412 dated 28.05.2014
CDM/308 dated 18.03.2014
CDM/464 dated 26.06.2014
CDM/444 dated 16.06.2014
HKTRPL/1011 dated 28.02.2014
Reviewed
1 no CDM 230/ 10.06.2013 Under Review
3 MNB
33+297 HKTRPL:1099/ 21.04.2014
CDM : 413 dated 29.05. 2014 Reviewed
38+520 CDM:215/21.01.2014 GFC
47+030 CDM/310 dated 18.03.2014
Review
completed,
queries from IE to
be complied by
Concessionaire
68+342 HKTRPL 382 dated 04.01.2014 Approved
4 MJB
77+993
Sub Structure
HKTRPL: 1043 dated
26.03.2014 GFC submitted
77+993
Super Structure HKTRPL 684 Dated 18.07.2013 GFC Submitted
5 PUP
7 Nos HKTRPL 381 dated 04.01.2014 GFC
1 no HKTRPL: 1156 dated 26.5.2014 Reviewed
6
VUP
5 Nos
Sub Structure HKTRPL : 382 dated 04.01.13 GFC
5 Nos
Superstructure
HKTRPL: 1039 dated 20.03.2013
CDM : 332 dated 04.04.2014
Review
completed,
queries from IE to
be complied by
Concessionaire
7 FO
39+022 CDM 722 dated 03.12.2014 Reviewed
40+990 CDM 217 dated 22.01.2014 GFC
92+385 Except Pier P3 HKTRPL: 382 dated 04.01. 2013 GFC
92+385 Pier P3 CDM 214 dated 21 Jan 2014 GFC
40m Obligatory Span HKTRPL: 1170 dated 12.06.2013
CDM : 332 dated 04.04.2014
Review
completed,
queries from IE to
be complied by
Concessionaire
20m Span- Superstructure HKTRPL: 385 dated 04.01.2013
GFC
8
RE Wall
6 Nos CDM 402 dated 22.05.2014 GFC
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 19
8 Nos
CDM : 635 dated 20.10.2014
CDM: 636 dated 20.10.2014
CDM: 637 dated 20.10.2014
HKTRPL: 1348 dated 09.10.2014
Review Completed
.
9
Miscellaneous
Drawings (
VUP, FO MJB &
MNB
HKTRPL letter no. 386 dated 04.01.2013
CDM : 458 dated 26.06.2014
Reviewed
10
Expansion
Joint CDM: 214 dated 21.01.2014 GFC
11
Floor
Protection
works CDM: 214 dated 21.01.2014
GFC
12 PCC Toe wall HKTRPL letter no. 233 dated 08.09.2012 Under Review
13
PCC Retaining
Wall
CDM: 280 dated 26.02.2014
HKTRPL: 1071 dated 03.04.2014 Review Completed
14
Design and
Drawings for
RCC HKTRPL: 782 dated 23.09.2013
Under Review
15
Drainage
Design Report
with precast
box drain HKTRPL: 783 dated 23.09.2013
Under Review
16
POT- PTFE
Bearings HKTRPL: 868 dated 02.12.2013 Reviewed
17
Rectangular
Drain CDM: 426 dated 04.06.2014 GFC
18
Friction slab
(Except RE wall
Portion)
CDM: 397 dated 20.05.2014 GFC
19
Friction slab
with Crash
Barrier
HKTRPL: 800 dated 09.10.2013
CDM: 251 dated 13 Feb 2014
20
Toll Plaza -
Administrative
Building
HKTRPL: 1384 dated 19.11.2014
CDM : 533 dated 12.08.2014 Under Review
21
Toll Plaza-
Toilet Block
HKTRPL: 1387 dated 21.11.2014
CDM 411 dated 28.05.2014 Under Review
22
Rest Area -
Restaurant
Building
CDM: 534 dated 12.08.2014 Under Review
23
Rest Area -
Dormitory
Building
CDM: 481 dated 09.07.2014 Reviewed
24
Rehabilitation
of Structures
HKTRPL: 778 dated 28.09.2014
HKTRPL: 1045 dated 26.03.2014 Under Review
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 20
9.2.e. Correspondence with NHAI:
9.2.f. Correspondence with CPM – HKTRPL :
S.No Date Letter No Subject
1 02.01.2015 CDM/CEI/1213006/769
Review of Design and drawings of
Overhead / Gantry signs (Portal type
for Cantilever
2 02.01.2015 CDM/CEI/1213006/770 Review comments on Miscellaneous
Drawings
3 03.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/001
Providing Metal Beam Crash Barriers
under Safety Measures
4 05.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/002
Action Programme for conducting the
tests under Article: 14 of Schedule –
I
5 05.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/003
Slope Protection works by using RE
Panels
6 05.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/004 Major bridge at Ch. 77+950
7 10.01.2015 CEI- Pending Drawings
1 03.01.2015 CEI-IE/NHAI/1213006/PD/2015/001Typical Details of Bus Bay on Service Road (Urban
Area) – Alternate Proposal
2 05.01.2015 CEI-IE/NHAI/1213006/PD/2015/002 Monthly Inspection Report December 2014
3 10.01.2015 CEI-IE/NHAI/1213006/PD/2015/003 Invoice for the Month of December 2014
4 10.01.2015 CEI-IE/NHAI/1213006/PD/2015/004
Non Payment of Toll Fee by vehicles participating in
Political rally at Krishnagiri on 17.12.2014 by the
political party member belong to “KONGUNADU
MAKKAL DESIYA KATCHI- KMDK Force majeure
under clause 34 of Concession Agreement
5 10.01.2015 CEI-IE/NHAI/1213006/PD/2015/005Comments Requested – M/s. Tab India Granites Ltd,
Access Permission
6 23.01.2015 CEI-IE/NHAI/1213006/PD/2015/006Submission of Monthly Progress Report December
2014
7 24.01.2015 CEI-IE/NHAI/1213006/PD/2015/007
Commercial Tax Department – Border Check Post
Hosur (Inward) Check Post at Zuzuwadi – Existing
Check Post not convenient to check the incoming
vehicles request to give permission to keep the
temporary portable cabin beside (western side of)
the RTO (Incoming) check post at Zuzuvadi
8 24.01.2015 CEI-IE/NHAI/1213006/PD/2015/008
Change Of Scope revised estimate – Pedestrian
Underpass of size 8m x 2.5m has been upgraded as
Vehicular Underpass of size 8m x 4.5m
9 28.01.2015 CEI-IE/NHAI/1213006/PD/2015/009
VIP Reference received from Shri. K. Ashok Kumar
M.P. Krishnagiri Lok Sabha Constitution, Tamil Nadu
regarding Improvement of Junctions near Rayakottai
& Salem Bye Pass
10 28.01.2015 CEI-IE/NHAI/1213006/PD/2015/010
In the Matter of Writ Petition No.16218 of 2013 and
No.21637 of 2013 before the Hon’ble High Court of
Madras regarding stopping of collection Toll charges
on National Highway Between Chennai and Bangalore
– Inspection by the team of experts nominated by
Indian Roads Congress( IRC)
11 29.01.2015 CDM/CEI/1213006/805Extension to Scheduled Six Laning Date (EOT-II)
upto May 2015
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 21
IE/NHAI/1213006/HKTRPL/2015/005
8 12.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/006
Request for Additional Box Culvert at
Rayakottai Junction (at Km. 40+970)
– Issuance of Change of Scope notice
9 12.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/007
VIP Reference revised from Shri Dr.
Thambi Durai, Hon’ble Minister of
Parliament (LS), Karur to consider a
VUP in front of Adhiyaman
Educational & Research Institute,
Hosur – UP gradation PUP of size 8m
× 4.5m by shifting the location to
Km. 44+950 of NH -7 request for
issue of change of Scope order as per
clause 16 of Concession Agreement
10 13.10.2015 CDM/CEI/1213006/787 Service Road Plan and Profile
drawings
11 13.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/008 Review of Typical Cross Sections
12 14.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/009
Review and concurrence of Bar
Bending Schedule
13 14.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/010
Review and concurrence of Bar
Bending Schedule
14 14.01.2015 CDM/CEI/1213006/789 Review comments on Miscellaneous
Drawings
15 14.01.2015 CDM/CEI/1213006/790
Service Road Plan and Profile
drawings from Ch. 61+000 to
62+000
16 14.01.2015 CDM/CEI/1213006/791 Review of Typical Cross Sections
17 17.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/011 Urgent Safety Measures – Requested
18 19.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/012
Slope Protection works by using RE
Panels
19 19.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/013
Review Test Report Borrow area no.
61
20 19.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/014
Typical Details of Bus Bay on Service
Road (Urban Area) – Alternate
Proposal
21 20.10.2015 CDM/CEI/1213006/795 Review of Alternate Proposals for Bus
Bay on Service Road
22 20.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/015
Closing of Un Authorized Median
Openings
23 23.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/016 Non Compliance Report
24 23.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/017
Review and concurrence of Bar
Bending Schedule
25 23.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/018
Review and concurrence of Bar
Bending Schedule
26 23.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/019
Review and concurrence of Bar
Bending Schedule
27 24.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/020
Implementation of Electronic Toll
Collection, Provision of Traffic Aid &
Medical Aid posts and ATMS, WIM &
Static weigh Bridge in Toll Plaza –
Action Plan
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 22
28 24.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/021
Modified Typical Cross Section at
Km.83+430 to Km. 83+900 RHS
29 24.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/022 Detachable Median Openings
30 24.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/023 Non Compliance Report
31 28.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/024 Rehabilitation of Structures
32 29.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/025
Dispute for Amicable Settlement,
under clause 44.2 of the Concession
Agreement Loss of Revenue due to
Stay order from Hon’ble Madras High
Court – Authority’s Instruction to
remit the amount of Rs.
3,32,30,114/- less paid from the
Additional Concession Fee
33 31.01.2015 CEI-
IE/NHAI/1213006/HKTRPL/2015/026
Non
Compli
ance
Report
9.3. Construction Programme : Construction Programme submitted to IE by the Concessionaire vide, Letter no. 208 - Dated
25.11.2011.Concessionaire has been advised to review the program vide, IE Letter no 102A -
Dated 07 Nov 2012 taking in to account the progress achieved till date. Revised Construction
Programme as per article 12.1 of CA for balance works are not submitted as per interim EOT
recommended by IE. For 2nd
EoT construction programme submitted it is under review with IE.
9.4. Construction Safety The National Highways Authority of India has engaged M/s. HAKS Engineers, Architects and
Land Surveyors, PC in association with Info Trans Engineers Pvt Ltd, as Road Safety Consultant.
Safety consultant are visiting the project site Regularly, and carry out Safety audit also. The safety
audit report are being submitted to PD as well as to IE. The recommendation of safety consultant
in their report are being implemented at site to the extent of provision in CA.
9.5. Method Adopted in Construction : The method of construction adopted has been regularly checked and reviewed by the IE through
conducting field and laboratory tests on compaction, whether materials used are in compliance
with specifications and standards.
9.6. Conformity of Construction Works : The source of materials used for construction works are regularly checked by IE for conformity
with the specifications and standards. Routine checks were regularly conducted by the IE field
team. The Team Leader and Key Personnel also attended some tests like Concrete Cube strengths
testing, Core thickness, Gradations, Bituminous Extractions tests etc. during their site visits.
Casting of RCC/PSC girders are in completed at camp locations and regularly inspected by IE
field team.
9.7. Defects and Deficiencies : Along with concessionaire EPC contractor and IE team visited site on 29/01/2015.
(Ref. IE Monthly inspection Report enclosed)
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 23
9.8. Maintenance of the Existing 4 lane Highway : The concessionaire is regularly maintaining the existing road and IE is constantly monitoring
the maintenance works.
9.9. Road Accident Report : The Concessionaire is submitting regularly the Accident occurrence report to IE through mail.
(Annexure – c)
9.10. Survey Works :
1) IE is in the process of reviewing survey reports containing traverse points, TBMs & etc.
2) Erection of New TBM pillars from Km. 33+130 to Km. 93+000 is completed.
3) Checking of GPS points, TBMs and Reference Pillars / Boundary pillars at Km. 33+130 to
Km. 93+000 is completed.
4) Checking of Top level of all layers being done (Embankment, Sub-grade, GSB, WMM, DBM
and BC.)
5) Checking of layouts for all structures is being done.
9.11. Source Approval of Materials:
S.
No
.
Source Name /
Locations
Materi
al
Name
To be used for
Lead to
site
(Km)
Date of approval of
source
Name of
Independe
nt quality
check done
before
approving
source.
1 Bukkasagaram
@Km 47+000
Aggreg
ate
GSB/WMM/DBM/B
C and Concrete
works
4.5km
CEI
Pj/NHAI/1213006/2012/1
28A dt 20.11.2012
3rd
party test
2 Thuppukanapalli
@ km 61+900
Aggreg
ate
GSB/WMM/DBM/B
C and Concrete
works
6.9km
CEI
Pj/NHAI/1213006/2012/1
28A dt 20.11.2012
3rd
party test
3 Palar River Sand Concrete 200km
CEI
Pj/NHAI/1213006/2012/1
28A dt 20.11.2012
3rd
party test
4
Thuppukanapalli
&
Bukkasagaram
(L&T Camp)
Water Concrete, WMM
6.9km
&
4.5km
CEI
Pj/NHAI/1213006/2012/1
24A dt 20.11.2012
3rd
party test
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 24
Sl.
No Details Submitted to IE/ NHAI Date Reply From NHAI Date Remarks
A. Hump Pipe
1
M/s. South
India Spun Pipe
Company
HKTRPL/NHAI/2011/Site/098
30-Aug-11
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1107 28-Jun-12 Approved
2
M/s. India Spun
Pipes HKTRPL/NHAI/2011/Site/117
13-Sep-11
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1144 03-Jul-12 Approved
3
M/s. RBBR
Infrastructure HKTRPL/NHAI/2011/Site/245
19-Dec-11
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/775 09-May-12 Approved
4
M/s.PK RCC
Pipie works
,Karur
HKTRPL/NHAI/2014/Site/1271
25-Aug-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/219 27-Aug-14 Approved
B. Cement
1
M/s. Ultra Tech
Cement (OPC 43
& 53 Grade)
HKTRPL/NHAI/2011/Site/099
30-Aug-11
NHAI/PIU-K'giri/MC-
II/BOT/CW/2009/627 08-Nov-11 Approved
2
M/s. Zuari
Cement (OPC 43
& 53 Grade)
HKTRPL/NHAI/2011/Site/159
29-Oct-11
NHAI/PIU-K'giri/MC-
II/BOT/CW/2009/627 08-Nov-11 Approved
3
M/s. Birla
Cement (OPC 43
& 53 Grade)
HKTRPL/NHAI/2011/Site/188
15-Nov-11
NHAI/PIU-K'giri/MC-
II/BOT/CW/2009/644 11-Nov-11 Approved
4
M/s. Dalmia
Cement (OPC 43
& 53 Grade)
HKTRPL/NHAI/2011/Site/201
22-Nov-11
NHAI/PIU-K'giri/MC-
II/BOT/CW/2009/691 02-Dec-11 Approved
C. Steel
1
M/s. TATA, M/s.
sail and M/s.
RINL
HKTRPL/NHAI/2011/Site/123
20-Sep-11
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2009/506 22-Sep-11 Approved
HKTRPL/NHAI/2011/Site/148
18-Oct-11
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2009/506 22-Sep-11 Approved
2
M/s. TATA Steel
Fe 500D HKTRPL/NHAI/2011/Site/202
22-Nov-11
NHAI/PIU-K'giri/MC-
II/BOT/CW/2009/690 02-Dec-11 Approved
3 M/s. JSW HKTRPL/NHAI/2012/Site/423
20-Mar-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1070 22-Jun-12 Approved
D. Admixture and Chemicals
1
M/s. BASF
Constrcution
chemicals
HKTRPL/NHAI/2011/Site/151
19-Oct-11
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1187 10-Jul-12 Approved
2
M/s. Fosroc
Chemicals HKTRPL/NHAI/2011/Site/232
13-Dec-11
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1141 03-Jul-12 Approved
3
M/s. Fosroc
Chemicals-
Plasticizer &
retarding Agent
HKTRPL/NHAI/2012/Site/596
19-Jul-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1302 23-Jul-12 Approved
M/s. Fosroc
Chemicals -
Nitobond and
Lokfix
HKTRPL/NHAI/2011/Site/265
27-Dec-11
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1188 16-Jul-12 Approved
4
M/s. SWC
Curing
Compound
HKTRPL/NHAI/2012/Site/318
31-Jan-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1091 28-Jun-12 Approved
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 25
5
M/s. Fosroc
Chemicals(I)
PVt. Ltd -
Grouting matrl
HKTRPL/IE/2012/ Site/258
24-Sep-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/125A 20-Nov-12 Approved
E Bitumen
1
M/s. HINCOL -
Prime coat, Tack
coat
HKTRPL/NHAI/2011/Site/262
24-Dec-11
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1095 28-Jun-12 Approved
2
M/s. HPCL - VG
30 Grade Paving
Bitumen
HKTRPL/NHAI/2011/Site/313
30-Jan-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/778 09-May-12 Approved
3
M/s. IOCL - VG
30 Grade Paving
Bitumen
HKTRPL/NHAI/2011/Site/314
30-Jan-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/777 09-May-12 Approved
4
M/s. IWL India
Limited - Prime
coat , tack coat
HKTRPL/NHAI/2012/Site/331
07-Feb-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1094 28-Jun-12 Approved
5
M/s. MRPL - VG
30 and CRMP HKTRPL/NHAI/2012/Site/406
13-Mar-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/776 09-May-12 Approved
6
M/s. TINNA
Overseas Ltd
HKTRPL/IE/2012/ Site/286
17-Oct-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/080A 16-Oct-12 Approved
F RE Wall
1
M/s. Reinforced
Earth wall
HKTRPL/NHAI/2012/Site/350
14-Feb-12 Cei-PJ/NHAI/1213006/2012/128B 20-Nov-12 Approved
2
M/s. Tech Fab
(India) Limited HKTRPL/IE/2013/Site/399
11-Jan-13 Under Review
To be
approved
G Girder Casting works
1
M/s. Tata Steel
and Usha
Martin - HT
Strands
HKTRPL/NHAI/2012/Site/382
29-Feb-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1071 22-Jun-12 Approved
H Bearing and Expansion Joints
1
M/s. Sanfield
and M/s.
Megaba Bridge
Products
HKTRPL/NHAI/2012/Site/386
03-Mar-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1040 20-Jun-12 Approved
2 M/s. Kantaflex HKTRPL/NHAI/2012/Site/408
13-Mar-12
NHAI/PIU-K'giri/MC-II/BOT-
HK/CW/2011/1093 28-Jun-12 Approved
I Pre stressing works
1
M/s. Usha
Martin Limited HKTRPL/NHAI/2012/Site/439
31-Mar-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1069 22-Jun-12 Approved
2 M/s. Freyssinet HKTRPL/IE/2012/ Site/084
31-Mar-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1069 22-Jun-12 Approved
J Antistripping Agent
1
M/s. Suvris
(Sales) Pvt Ltd. HKTRPL/NHAI/2012/Site/394
07-Mar-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1087 28-Jun-12 Approved
2
M/s. Eswari
Petro Tech HKTRPL/NHAI/2012/Site/434
26-Mar-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1092 28-Jun-12 Approved
3
M/s. IWL India
Limited HKTRPL/NHAI/2012/Site/487
26-Apr-12
NHAI-PIU-K'giri/MC-II/BOT-
HK/CW/2011/1090 28-Jun-12 Approved
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 26
4
M/s. Indomines
&
M/s.Petrochem
Specialist
HKTRPL/IE/2012/ Site/235
08-Sep-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/073 18-Oct-12 Approved
K Lime
1
M/s. Reddys
lime supplier
HKTRPL/NHAI/2012/Site/507
11-May-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/085A 30-Oct-12 Approved
2
M/s. Sree
Hyothsna
Minerals
HKTRPL/NHAI/2012/Site/486
26-Apr-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/081A 26-Oct-12 Approved
L. Road Signages
1 M/s. Sri Balaji HKTRPL/IE/2012/ Site/288
17-Oct-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/113 14-Nov-12 Approved
2 M/s. 3M India
HKTRPL/IE/2012/ Site/287
17-Oct-12
Cei-
PJ/NHAI/1213006/HKTRPL/2012/112 14-Nov-12 Approved
M Themoplastic paints
1
M/s. Kataline,
Nagpur
HKTRPL/IE/2012 /Site/287
27-Dec-12
Cei-
PJ/NHAI/1213006/HKTRPL/2013/011 23-Jan-13 Approved
N Paints
1
M/s Asian
Paints ,Mumbai
HKTRPL/IE/2014/Site/1276
27-Aug-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/221 30-Aug-14 Approved
O LED TRAFFIC BEACONS
1
M/s .BONS
LIGHT Pvt. Ltd
,Ahmadebad.
HKTRPL/IE/2014/Site/1206
09-Jul-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/179 17-Jul-14 Approved
P METAL BEAM CROSS BARRIER
1
M/s.AIRCON
GUARDRAILS
Pvt. Ltd
HKTRPL/IE/2014/Site/1257
18-Aug-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/214 22-Aug-14 Approved
2
M/s. Lysasht
Taperline Poles
Pvt Ltd,
Sriperumpudhur
HKTRPL/IE/2014/Site/1390
21-Nov-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/297 27-Nov-14 Approved
3
M/s. NS Rolling
steel Pvt Ltd,
Mumbai
HKTRPL/IE/2014/Site/1391
21-Nov-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/296 27-Nov-14 Approved
Q TILES
1
M/s. Mayura
RCC Precasting
Industries,
Hosur
HKTRPL/IE/2014/Site/1378
14-Nov-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/287 15-Nov-14 Approved
R REHABILITATION (STRUCTRE)
1
M/s.Varshitha
Concrete
Technologies
Pvt.
Ltd,Hydeabad
HKTRPL/IE/2014/Site/1164
12-Jun-14
Cei-
PJ/NHAI/1213006/HKTRPL/2014/146 19-Jun-14 Approved
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 27
9.12. Borrow Area Test Results (Annexure – d)
9.13. Requests for Inspection (RFI): RFIs are being taken care of by field staff of IE regularly.
9.14. Non Conformance Report (NCR): (Annexure – e)
9.15. Progress Report from the Concessionaire: The Concessionaire submitted their monthly progress report for the Month of January - 2015 to
Independent Engineer on 11.01.2015. The report is under review.
9.16. IE Factory Visit Report:
1
Project : Hosur - Krishnagiri NHAI -7 Road Project.
Material : Metal Beam Crash Barrier
Witnessed by :
1.Mr.J. Selvakumar, AQME, CDM Smith-WSAPL(JV)
2. Mr .YuvaRaj HKTRPL.
3. Mr.Venu Babu . L&T
Contractor : M/s Lysaght Taperline Poles Pvt Ltd
Test Conducted
at : Irungattukottai
Date of Testing : 12-01-2015
1
Project : Hosur - Krishnagiri NHAI -7 Road Project.
Material : Feeder Pillars (Panel),Distribution Boards
Witnessed by :
1.Mr.Shashikanth Joshi ,Electrical Engineer , CDM Smith-WSAPL(JV)
2. Mr .YuvaRaj HKTRPL.
3. Mr.Venketesh . L&T
Contractor : M/s Bajaj Electrical Ltd Lighting Development Centre
Test Conducted
at : ES Electronics India Pvt Ltd ,Banglore
Date of Testing : 22-01-2015
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 28
9.17. Meeting & Site Visit of Dignitaries:
1) Road Safety Meeting was held on 06.01.2015 at NHAI RO, Chennai.
2) 29.01.2015 – IE, Monthly site Inspection held for the project from Ch:33+130 to 93+00
along with Concessionaire, EPC Contractor and Construction Contractor.
3) The ETC Meeting was held on 30.01.2015 at NHAI RO, Chennai.
9.18. Approved independent 3rd
Party laboratory :
Sl.no Type of
Material
Type of
Testing
Name of
Laboratory
Accredited
By Location Remarks
1 Reinforcement Physical &
Chemical
CIVIL AID NABL Bangaluru
Raghavendra
Lab NABL Bangaluru
2 Cement
Physical &
Chemical CIVIL AID NABL Bangaluru
3 Admixture
Physical &
Chemical CIVIL AID NABL Bangaluru
4 Aggregate
Physical &
Chemical CIVIL AID NABL Bangaluru
5 Water
Physical &
Chemical CIVIL AID NABL Bangaluru
6 Lime
Physical &
Chemical NAWAL NABL Hosur
7
Antistripping
agent Chemical CIVIL AID NABL Bangaluru
8 Bitumen VG 30 All Tests CIVIL AID NABL Bangaluru
L & T NABL Bangaluru
9 CRMB 60 All Tests CIVIL AID NABL Bangaluru
10
Emulsion
RS1,SS1 All Tests CIVIL AID NABL Bangaluru
11 Soil
Physical &
Chemical CIVIL AID NABL Bangaluru
12 Nitobond EP All Tests CIVIL AID NABL Bangaluru
13
Thermoplastic
Road marking All Tests ANACON NABL New Delhi
14 HT Stands All Tests
TATA
(Bombay) Bombay
15 Sheathing All Tests
REX Polymers
( Factory Visit)
16
Elastomeric
Bearing All Tests
Mageba
(Factory Visit ) Kolkata
17
Geo-Grids
All Tests
The Bombay
Textile Research
Association NABL Bombay
18
Wedges,Cones,
Anchor cone All Tests Usha Martin Ranchi
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 29
10. PROJECT AFFECTED FOR WANT OF LA STATUS :
HOSUR - KRISHNAGIRI PROJECT
LAND STATUS AS ON 31.01.2015
A. MAIN CARRIAGEWAY
Sl. no AREA Total
Length
Available for MCW Effected for
MCW (Km) in KM In %
1 LHS 59.87 59.87 100.0%
-
2 RHS 59.87 59.87 100.0%
-
B. SERVICE ROAD
Sl. no AREA Total
Length
Available for SR Effected for
Service Road
(KM) in KM In %
1 LHS 27.19 27.16 99.9%
0.030
2 RHS 27.19 26.52 97.5%
0.670
C. PROJECT FACILITIES
Sl. no AREA Total
Length
Available for PF Effected for
Project
facilities (KM) in KM In %
1 LHS 59.87 59.63 99.6%
0.240
2 RHS 59.87 59.08 98.7%
0.790
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 30
PHYSICAL OBSTRUCTION / LAND NOT AVAILABLE DETAILS FROM CHAINAGE: 33+130 TO 93+000 (LHS) AS ON
DATED:31.01.2015
LHS Effected for
MCW
Effecte
d for SR
Effected for
Project facilities
Obstruction Details Remarks CHAINAGE Name of Village
From To
38.180
38.210
Mookondapalli
0.030
0.030 Temple (Mariamma )
Temple @14.25 to 16.Mtr
41.520
41.620
Chennathur
0.100 Buildings
SR Works in Progress
90.740
90.850
Katiganapalli
0.110 Additional Land to be required
Head wall constracted and demolised due to Land problem
Total -
0.030
0.240
PHYSICAL OBSTRUCTION / LAND NOT AVAILABLE DETAILS FROM CHAINAGE: 33+130 TO 93+000 (RHS) AS ON
DATED:31.01.2015
RHS
Name of Village
Effected for
MCW
Effected for SR
Effected for
Project facilities
Obstruction Details REMARKS
CHAINAGE
From To
38.050 38.250 Mookondapalli 0.200 0.200 Mosque and Grave Yard
E.Ploes 2 No's @17.5, E.Drain @14.25 to 18.250 Varies&Mosque/[email protected]
39.350 39.540 Hosur 0.070 0.190 Buildings
41.300 41.650 Chennathur 0.350 0.350 Buildings/ EB poles
E.Poles 6 No's @ 15.70 to 19.00mtr Varies & [email protected] to 22.50mtr Varies
90.230 90.280 Kattiganapalli 0.050 0.050 Buildings/ EB poles
Buildings @ 19.100 & 3.No's EB poles@ 14.800 to 17.500
Total 0.000 0.670 0.790
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 31
11. Progress of Quality Control Test Report of January - 2015:
Details are inclosed (Annexure – f)
12.WEATHER REPORT OF January - 2015 :
Client : NATIONAL HIGHWAYS AUTHORITY OF INDIA
Independent Engineer : CDM Smith Inc (JV) Wilbersmith Associates Pvt Ltd.
Concessionaire : HK TOLL ROAD PVT. LTD.
EPC Contractor : RELIANCE UTILITY ENGINEERS PVT.LTD.
Contractor - : LARSEN & TOUBRO LIMITED-ECC DIVISION.
1 01.01.2015 24.1 19.3 _ 49
2 02.01.2015 26.2 18.6 _
3 03.01.2015 27.8 19.5 _
4 04.01.2015 29.9 20.3 _
5 05.01.2015 25.9 17.7 _
6 06.01.2015 31.5 19.5 _
7 07.01.2015 30.4 21.9 _
8 08.01.2015 26.5 19.4 _
9 09.01.2015 27.9 21.1 _
10 10.01.2015 26.5 22.5 _
11 11.01.2015 28.1 16.2 _
12 12.01.2015 30.4 20.6 _
13 13.01.2015 28.3 21.5 _
14 14.01.2015 33.8 22.1 _
15 15.01.2015 28.9 18.1 _
16 16.01.2015 30.5 21.5 _
17 17.01.2015 29.3 22.4 _
18 18.01.2015 34.1 24.7 _
19 19.01.2015 35.0 27.2 _
20 20.01.2015 30.4 20.5 _
21 21.01.2015 28.9 19.7 _
22 22.01.2015 28.3 18.9 _
23 23.01.2015 34.1 21.1 _
24 24.01.2015 31.6 20.6 _
25 25.01.2015 29.5 17.6 _
26 26.01.2015 28.4 16.1 _
27 27.01.2015 29.6 17.9 _
28 28.01.2015 30.2 21.2 _
29 29.01.2015 32.3 20.9 _
30 30.01.2015 29.5 22.5 _
31 31.01.2015 30.5 19.2 _
Total Rainfall (mm) = 0.0
Six Laning of Hosur - Krishnagiri Section of NH-7 from Km 33.130 to Km 93.000 (Length –Km 59.87) State of Tamil Nadu under NHDP Phase V as BOT(Toll) on DBFOT Pattern (Package No. : NHDP Phase-V(NH-
07)
Weather Report For The Month of JANUARY - 2015 (SEC -A Lab at 47.410LHS)
Sl.
No.Date Max. Temp.
Min.
Temp.
Rainfall
(mm)
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Ma
x., M
in.
Te
mp
.(*C
) &
R
ain
fa
ll(
mm
)
Date
Graphical Presentation of Max., Min. Temp.(°C) & Rainfall (mm) in the month of JANUARY 2015
Rainfall (mm) =NIL
Max. Temp.(°C) = 35.0
Min. Temp. (°C) = 16.1
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 32
13. LOGISTICS PLAN
Sl No ITEM STATUS AT
SHOOLAGIRI
STATUS AT
PERANDAIPPALLI
I BATCHING PLANT Functional NA
II WMM PLANT NA Functional
III HMP Functional NA
IV
Semi Mobile Crusher - 200
TPH NA NA
V Mobile crusher for GSB NA NA
VI Pre Cast Yard Functional NA
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 33
14. PLANTS & MACHINERY AVAILABLE AT SITE :
SL Resource Model & Capacity Number
1 Excavator CK-90 1
2 Excavator EX-120 3
3 Excavator EX-200 4
4 Dumper TATA,MAN,AL-16Cum 19
5 Dumper TATA,MAN,AL-8Cum 15
6 Motor Grader 164 HP-Komatsu-GD 555-3A 6
7 Vibratory Roller 10T 6
8 Water Tanker 12000, 4000 L 10
9 Hot Mix Plant Marini-120TPH 1
10 WMM Plant Marini-120TPH 1
11 Paver-Voggle Voggle- 500TPH 3
12 Tandem Vibratory Roller 8T 7
13 Pneumatic Tyre Roller Bittelli/IR 3
14 Batching Plant Schwing Scetter-30 cum/Hour 2
15 Transit Mixers AN6SHN/ 2516-6Cum 5
16 GANTRY Anupam-40T 2
17 Kerb Casting Machine Arrow 740 3
18 Semi Mobile Crusher Metso-200 TPH 1
19 Boom Placer BPL 2023/KVM 32*L 1
20 Bitumen Sprayer Appolo 2
21 Hydra crane 12& 15T capacity 6
22 Truck Mounted Crane 3T 1
23 Mini Roller- 2T,3T 5
24 Weigh Bridge 100T,60T 3
25 JCB 3DX 5
26 Trailer 22MT 6
27 Wheel loader 580-3S,430Z 6
28 Bar bending machine B42,B52 6
29 Bar cutting machine C42,C52 3
30 Welding machine EDW400 10
Labour Details
Description FTM Cumulative
Total no. of workmen 625 38747
Total man-hours worked 170300 12470980
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 34
15.CHANGE OF SCOPE : Details of change of scope (COS) - Pedestrian Underpass of size 8m x 2.5m has been
upgraded as Vehicular Underpass of size 8m x 4.5m
Reason for COS: VIP Reference Dr. Thambi Durai, Hon'ble Member of Parliament
(LS), Karur to consider a Vehicular Underpass instead of Pedestrian underpass in front of
Adhiyamman Educational & Research Institute, Hosur.
Whether COS initiated by concessionaire / NHAI – NHAI
Issue of change of scope (Cos) Notice: NHAI issued the change of scope (Cos) notice as per
Clause16 of CA vide letter No. NHAI/PIU-Krishnagiri/MC-II/BOT-HK/CW/2009
/552 dated 24th
March 2012.
According to above change of scope (Cos) notice, Concessionaire submitted the
tentative cost Estimate. IE reviewed the cost estimate and returned the estimate with
observation, for Re submission vide IE letter No: 004 dated 19th
Jan 2013.
As per NHAI requirement revised proposal submitted by Concessionaire vide their
Letter no HKTRPL/IE/2013/Site/909 dated 24th
Dec 2013.
COS recommended by IE vide letter no.CEI-Pj/NHAI/1213006 /PD/2014/007.
Dated 09th
January 2014
16. Extension of Time (EOT) :
Concessionaire submitted Interim application for Extension of Time to the Intermediate Milestones
and Scheduled Six Laning Date for the Project considering the delays in the Project up to 30.11.2012
vide letter No. HKTRPL/IE/2013/Site/502 dated 16th March 2013
IE send the reply vide letter No. CEI-Pj/NHAI/1213006/HO/1798 dated 25th July 2013 to resubmit
the EOT taking in to consideration the present site condition.
Concessionaire vides its letter. no. HKTRPL/IE/2013/Site/717 dated 12th
September 2013 requested
the Independent Engineer to review the interim EOT submissions in accordance with clause 3.1(vii)
of schedule “Q” of the concession agreement in line with the clause 6 of the Schedule G. It is under
review by IE.
IE has recommended interim Extension of time to scheduled six laning date up to 30.05.2014 vide
letter no.CDM/CE/ 1213006/124/dated 19.11.2013.
Concessionaire vide his letter No. HKTRPL/IE/2014/Site/1059 dated 31st March 2014 requested the
Independent engineer to review the 2nd
interim EOT submissions in accordance with clause 3.1(vii)
of schedule “Q” of the concession agreement in line with the clause 6 of the Schedule G.
IE has recommended interim extension of time to Scheduled six laning date up to 03.05.2015 vide
letter no. CDM/CEI/1213006/435 dated 11.06.2014 to Authority for Approval, pursuant to clauses
4.1.3, 10.3.1, 10.3.2, 12.4.2, 13.4 and Schedule ‘G’ of Concession Agreement.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 35
17. Safety Constraints / Maintenance:-
1. Median Openings are to be closed wherever BC is completed as per final List at Median
openings communicated issued vide to letter No: CEI-Pj/NHAI/1213006/PD/2014/078 dated 16
Apr, 2014.
2. As per clause 4.8.1 & 4.8.3 Metal beam crash barrier shall be provided wherever High
embankment 3m or more and wherever median is depressed, finished or having the width less
than 4.50 meters and the barrier shall be on both directions .
3. Diversions are to be maintained as per IRC SP-55 with proper safety arrangements.
4. Traffic sign boards, Cautions boards, reflectors and safety barriers are to be provided for
parapets of Bridges, Culvert and Such other structures.
5. Service roads are to be connected to the Main Carriageway with proper designed acceleration
and deceleration lanes.
6. Median Plantation and Avenue Plantation wherever is missing will have to be taken up under
maintains immediately.
7. Wherever the road is formed in cutting is observed to be not to the required side slopes 2:1. As
such the stretches is cutting will have to be developed to the requires side slopes inorder to
prevent strippage of earth and loose boulders on to the highway during heavy rains.
8. The Crash barriers which were removed from the existing for four lane highway at ponds for
using in the road work are to be restored at the earliest.
9. LED Traffic beacons are to be provided on the entire project highway at pedestrian crossing,
public gathering locations, cross roads and entry / exit of service roads.
10. Delineators & studs are to be provided wherever lane marking is completed.
11. Safety measures are to be provided at the construction zones in Hosur built up area in to avoid
untoward incidents.
12. Debris & bituminous waste dumped in the median and road side will have to be cleared as
environmental safety measures.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 36
18. Incident Management System :-
HKTRPL TOLL PLAZA - KRISHNAGIRI S.No Description Mobile No Vehicle No
I HIGHWAY PATROL
1 HIGHWAY PATROL I 9367311001 TN-24K - 7023
2 HIGHWAY PATROL II 9367311002 TN-24K - 7153
II AMBULANCE 9367311011
TN-29AB - 2371
(Medicines and Equipments -
84 Nos and checked every
week)
III HELP LINE 9345212345
IV CRANE - I TN-24J - 0383
(15 T Capacity)
a) Shoolagiri (Panali Crane Service)
b) Hosur (MA Salchi Crane Servcice)
9750270696
9442558061
V OFFICE LAND LINE 04343 - 322433
VI TRAFFIC AID POST Temporary Arrangement at Toll Plaza
VII MEDICAL AID POST Temporary Arrangement at Toll Plaza
VIII COMPLAINT REGISTER Available at Toll Plaza
NOTE: Vehicle Tracking System is Working
19. Work execution not As per CA Provision : 1. Median width in Rural Area has to be minimum 4.50m, but Concessionaire has widened the
road retrofitting. The existing median for major portion is less than 4.50m .
2. Concessionaire is providing Hume Pipe (900mm dia. NP3) longitudinal drain in place of 1.5m
wide separator cum – lined covered drain, which is not in line with provisions of CA. The
Concessionaire has been informed that construction of longitudinal Hume pipe drain is
entirely at their “Risk & Cost”. NCRs also issued to Concessionaire.
3. As per clause :4.8 of Manual for Standards & Specification for Six lanning ,metal beam crash
barrier has to be provided wherever the median width is less than 4.5 and height of
embankment is 3.0 m or more. But the concessionaire not willing to provide the same.
However the concessionaire agrees to provide if the item is permitted to be carried out under
change of scope.
4. As per CA , all road signs shall be with high intensity micro prismatic grade sheeting (type iv)
as per ASTM standards. But in the site all road signs of diamond grade retro reflective
sheeting (Type IX & XI) are being provided.
5. As per CA at Ch. 77+950 (RHS) Major Bridge to be constructed PSC Pretention 5-Girder
system for super structure and RCC for Substructure. But in site it is constructed with PCC
Substructure and RCC 4-Girder system.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 37
20. Scope of Work as per O & M:
As per CA Clause no. 12.2 the concessionaire shall maintain, at its cost, the
existing lane(s) of the Project Highway so that the traffic worthiness and safety thereof
are at no time materially inferior as compared to their condition 7 (seven) days prior to
the date of this Agreement, and shall undertake the necessary repair and maintenance
works for this purpose; provided that the Concessionaire may, at its cost, interrupt and
divert the flow of traffic if such interruption and diversion is necessary for the efficient
progress of Construction works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the Concessionaire
only with the prior written approval of the Independent Engineer which approval shall
not be unreasonably withheld. For the avoidance of doubt, it is agreed that the
Concessionaire shall at all times be responsible for ensuring safe operation of the
Project Highway
Applicability of Schedule – K (Details in Pages 303 to 309 of CA)
As per the view of PD and IE that during the Construction period of widening of
existing four lane to six lane all the requirement of Schedule ‘K’ (Annexure – I)
i) Routine maintenance of Roads:
a) Carriageway & Paved shoulders
b) Hard / Earth shoulders, side slopes, drains and culverts.
c) Road side furniture including road signs & pavement marking
d) Street lighting and telecom (ATMS)
e) Tree and plantation (median & Landscaping below Flyovers)
f) Rest Area
g) Toll Plaza
h) Other Project Facilities and approach of road.
ii) Routine maintenance of Bridges:
a) Super structure of Bridges
b) Foundation of Bridges
c) Piers, Abutments, Return walls and Wing walls of Bridges
d) Bearing (Metallic) of Bridges
e) Joints on Bridges
f) Other items relating to Bridges.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 38
21. Inspection Report of IE :
Inspection Report of IE for the Month of January 2015
Introduction:
The project site of Hosur-Krishnagiri of NH-7 from Ch.93+000 to Ch.33+130 was inspected on
29, January 2015, jointly with Concessionaire HKTRPL, construction contractor L & T
representative and members of IE team headed by:
Independent Engineer : Mr. C. V. Krishna Reddy, Acting Team Leader, IE
Concessionaire : Mr. Sathish DGM & Mr. Sudhakar, GM, HKTRPL
Construction Contractor : Mr. R L Naidu & Sattanathan, Construction Manager, L & T
Progress & Quality of Works:
1) Drawings for Junction improvement at Ch.92+550 (below flyover location) are overdue and
the same may be submitted immediately.
2) Landscaping work below flyovers shall be taken up without any further delay.
3) Avenue Plantation work which is in progress at Ch.85+300 RHS does not conform to clause
no. 4.16 of Concession Agreement. Hence the concessionaire is requested to carry out
further avenue plantation work as is prescribed in the Concession Agreement.
4) Roof slab for Toilet Block is laid at Ch.68+500 LHS in Rest Area and curing is in progress.
5) Subgrade and GSB work is in progress at Truck lay bye location of Rest Area at Ch.68+500
LHS. The subgrade soil dumped in the site found to contain boulders and waste material
which is to be removed immediately.
6) Inspected lab at Ch.61+900 RHS in L&T camp and checked the regular activities like cube
testing, soil gradation work etc.,. Inspected the Hot mix plant operation for BC mix and
casting yard for casting of Paver blocks which are found to be in progress.
7) Slope protection works using RE panels is in progress at Ch.33+500 to 33+600 RHS with
toe wall not being constructed properly.
8) Laying of BC is in progress from Ch.38+800 to 38+840 RHS Main carriageway. BC laying
temperature is checked and found to be within the limits prescribed for.
9) Construction of Return wall work is in progress for Box Culvert at Ch.41+600 RHS
Krishnagiri side.
10) Box culvert wall on Service Road is in final stage and deck slab work is in progress at
Ch.34+140 RHS.
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 39
11) Lane marking has to be done as per approved drawing wherever BC is completed on Service
Road.
12) Fixing of Chequered tiles for flooring for the bus bay at Ch. 86+200 LHS is in progress.
suggested to provide camber towards the kerb so as to drain of the rain water without
stagnation in shelter.
13) Action plan at Ch. 41+720 LHS, MCW for seepage water treatment may have to be
submitted immediately.
14) Toll plaza monthly monitoring is carried out regarding Ambulance, Highway patrol, etc and
found to be satisfactory.
15) Flex boards provided for information regarding toll plaza on Hosur and Krishnagiri sides are
to be removed and the same may be replaced with pucca boards on permanent basis as
specified in the agreement
16) Profile correction for Service Road from Ch. 34+600 to 34+800 LHS has to be done as per
the submitted drawing for Plan & Profile of Service Road.
17) Police check post located in Ch. 33+730 without permission from the Authority may be
removed at once.
18) Median openings are o be closed other than detachable median openings immediately as a
safety measure to avoid accidents.
19) Wherever BC is completed, road side furniture shall be provided on BHS as per clause no.
2.3 of Concession Agreement immediately in order to provide better guidance to the road
users.
20) As per clause no. 2.5 of Concession Agreement pedestrian facilities are to be provided
immediately wherever bus bays and bus shelters are either completed or under progress.
21) Damaged service road portions should be rectified wherever necessary with special
reference to Ch. 87+010 PUP LHS, Ch. 61+845 VUP BHS, Ch. 45+950 VUP BHS, Ch.
40+990 Flyover BHS, Ch. 39+022 Flyover BHS, Ch. 36+550 PUP BHS & Ch. 34+000 PUP
BHS.
22) Chainages shall be marked throughout the stretch wherever activity is in progress.
23) Safety arrangements are to be provided wherever the following activities are in progress:
i) Median grass cutting
ii) Road Clearing
iii) Metal Beam Crash Barrier installation
iv) Pedestrian guard rails fixing
v) Kerb related works.
24) Potholes, patches, rain cuts and shoulder erosion are to be attended on top most priority in
the affected stretches.
25) Unauthorized openings in pedestrian guard rails are to be closed as a safety measures.
*********************************************************************************
Independent Engineering Service
Hosur Hosur Hosur Hosur –––– Krishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NHKrishnagiri Project Of NH----7777
Monthly Inspection Report – January Page 40
22. ANNEXURES
a) Progress Photographs.
b) Strip Chart – Highway and Structure
c) Accident data for January - 2015.
d) Borrow Area Abstract for January - 2015.
e) Summary of NCR .
f) Quality Control Test for January - 2015
g) Monitoring of Project Facilities on Project Highway.
h) Input of Intermittent key Professional Staffs for the month of January - 2015.