Storage Tank Fire Protection and FirefightingEstablishing New Ground

Meeting Industry Compliance for TYPE-II & TYPE-IIIWhile delivering a Compliance +PLUS approach

OISD Seminar on Marketing OperationsNew Delhi

16th January 2014

Rising to the ChallengeInternational Best Practices

in Storage Tank Firefighting

Page 2: in Storage Tank Firefighting

• Case histories that are reshaping industries approach to bettermanaging storage tank fire fighting activities in a timely and work safemanner.

Williams Case Histories1. Tenneco Chalmette2. Norco Orion3. Glenpool4. Puerto Rico

Industry Case Histories1. Idemitsu Kosan Tomakomai2. CNPC Dalian3. Trafalgar Pasir Gudang and Cilacap4. Engen Cape Town

• Organization, Operation and Logistical fundamentals.

• Progressive technology changes that are reshaping and influencingstorage tank fire protection and firefighting practices.

• Minimizing the environmental impact and investment losses.

Page 3: in Storage Tank Firefighting

179

66

98

25

Emergency Responses

Bulk Stotage Tank Incidents

Quantity Tanks Involved Related

Crude related

No one’s extinguished more!67 Tank Fire Responses in 33 years with more than 98 tanks successfully extinguished!

Flammable and Combustible Storage Fires

Page 4: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]1983

Tenneco Chalmette

Page 5: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

45m diameter Fully Involved Gasoline Storage Tank

Successfully Extinguishment with Mass Stream Application

Developments:

1. Open floating roof storage tanks do not have fixed fire protection systems toaddress full surface fires therefore manual intervention with Type-IIIapplication is required.

2. Newly applied “logistical methods” and “mass stream delivery” with thecombined use of “1,000-gpm Hydro-Foam” nozzles and 3x6% AFFF/AR-AFFFfoam concentrates.

3. No fire apparatus required for foam stream delivery as all equipment beingportable and mobile.

4. The need for greater efficiency for firewater hydraulics.

Tenneco Chalmette

Page 6: in Storage Tank Firefighting

Norco Orion

2001

Page 7: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Norco Orion

Page 8: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Norco Orion

Extinguishment achieved in 65-minutes from Foam Application

Excess of 23,000,000-lt (145,000-BBL) of reformulated Gasoline saved andrecovered from tank post extinguishment

Page 9: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Norco Orion

82m diameter Fully Involved Gasoline Storage Tank

Successfully Extinguishment with mass stream Footprint Application

Developments:

1. Nearing 20-years of historically repeatable and proven use of manualintervention with Type-III applications to ensure control and extinguishment.

2. Increased “Application Rates” and “Dual High Volume” mass streamdeliveries with high performance 3x6% AFFF/AR-AFFF foam concentrate.

3. The entire operation performed with “supplementary” firefightingequipment being fully transportable portable and mobile.

4. Large diameter firewater hydraulics.

5. “Cooling Water” where, when and when-not to be applied.

6. The need to Improve Logistical Capabilities.

Page 10: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Explorer Glenpool

2006

Page 11: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Explorer Glenpool

Page 12: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Explorer Glenpool

Page 13: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Explorer Glenpool

Page 14: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

Explorer Glenpool

44m diameter Fully Involved Gasoline Storage Tank

Successfully Extinguishment with mass stream Footprint Application

Developments:

1. Applied strategic Fire Plans together with Municipal Fire Department.

2. Applied usage of High Performance 1x3% AFFF/AR-AFFF foam concentrate.

3. Simplicity of “Logistics” and operational “Implementation”.

4. “Optimizing” available water and “Minimizing” usage due to appliedFootprint application methods and extremely “High Performance” fireextinguishment foam concentrate applied @ 1%.

5. Minimizing environmental impact from both “airborne emissions” and“waste water” containment.

Page 15: in Storage Tank Firefighting

GULF Puerto Rico

2009

Page 16: in Storage Tank Firefighting

GULF Puerto Rico

Page 17: in Storage Tank Firefighting

GULF Puerto Rico

Page 18: in Storage Tank Firefighting

GULF Puerto Rico

Page 19: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

GULF Puerto Rico

Page 20: in Storage Tank Firefighting

[ www.williamsfire.com ][ www.williamsfire.com ]

GULF Puerto Rico

(17x) 20 - 40m diameter Fully Involved Gasoline Storage TankSuccessfully Extinguishment with mass stream Footprint Application

Developments:

1. Applied strategic Fire Plans together with Municipal Fire Department.

2. Discontinue the use of multiple types of foam concentrate at the facility for astandardization for one High Performance AFFF/AR-AFFF foam concentrate.

3. Simplicity of “Logistics” and operational “Implementation”.

4. “Optimizing” available water and “Minimizing” usage due to appliedFootprint application methods and extremely “High Performance” fireextinguishment foam concentrate applied @ 1%.

5. Minimizing environmental impact from both “airborne emissions” and“waste water” containment.

Page 21: in Storage Tank Firefighting

Knowledge

PerformanceFire Equipment

PerformanceExtinguishing Agent

WilliamsFire Triangle

MethodologyTactical Planning

Scaled Training3D Simulation

Onsite TrainingCommunication

Fire PerformanceProportioning RateApplication RatesLogisticsStorageDeployment

Flammable Liquid Firefighting

Page 22: in Storage Tank Firefighting

Engen Cape Town

2007

Page 23: in Storage Tank Firefighting

Engen Cape Town

Page 24: in Storage Tank Firefighting

Engen Cape Town

Page 25: in Storage Tank Firefighting

Engen Cape Town

Page 26: in Storage Tank Firefighting

Engen Cape Town

(1x) 46m diameter Fully Involved Gasoline Storage TankSuccessfully Extinguishment however this tank was extinguished on Three-(3)separate occasion’s due to lack of Post Suppression following the first twoattempts.

Developments:

1. Applied strategic Fire Plans with Footprint application.

2. Simplicity of “Logistics” and operational “Implementation”.

3. No one single performance foam concentrate as site maintained variousbrands and foam concentrate types of various shelf-life vintages.standardization for one High Performance AFFF/AR-AFFF foam concentrate.

4. In consistent foam supply.

5. Post Suppressions measures not applied to prevent re-ignition.

6. Revision to Tactical Fire Planning, Logistics and Training.

Page 27: in Storage Tank Firefighting

Idemitsu Kosan

2004

Page 28: in Storage Tank Firefighting

Idemitsu Kosan

Page 29: in Storage Tank Firefighting

Idemitsu Kosan

(1x) 44m diameter Fully Involved Naphtha Storage TankThis storage tank burnt for nearly three days and was completely lost.

Developments:

1. Studies and investigation for the amendment of National Guidelines.

2. National Guideline changes implemented across Industry.

• Improvement of Logistical Strategies.• Discontinued usage of fire apparatus for storage tank firefighting.• Implementation of mobile and transportable high volume equipment.• Implementation for new large diameter fire hose guidelines.• Implementation for new High Performance foam concentrate guidelines

and introduction of multi-purpose 1% foam concentrates for storage tankfirefighting applications.

• Implementation for new Strategic Fire Planning and Training.

Page 30: in Storage Tank Firefighting

2010

CNPC Dalian

Page 31: in Storage Tank Firefighting

CNPC Dalian

Page 32: in Storage Tank Firefighting

CNPC Dalian

(2x) 80m diameter Fully Involved Crude Oil Storage TanksThis storage tank burnt for nearly three days and was completely lost.

Developments:

1. Studies and investigation for the amendment of National Guidelines.

2. National Guideline changes implemented across Industry.

• Improvement of Logistical Strategies.• Progressive movement away from fire apparatus for storage tank

firefighting in particular tank diameters 60m and greater.• Implementation of mobile and transportable high volume equipment.• Implementation for new large diameter fire hose guidelines.• Implementation for new High Performance foam concentrate guidelines

away from current 6% foam concentrates for storage tank firefighting.• Implementation for Educational Awareness and Training.

Page 33: in Storage Tank Firefighting

Trafalgar PG

2008

Page 34: in Storage Tank Firefighting

Trafalgar PG

Page 35: in Storage Tank Firefighting

Trafalgar PG

Page 36: in Storage Tank Firefighting

Cilacap

2011

Page 37: in Storage Tank Firefighting

Cilacap

Page 38: in Storage Tank Firefighting

Cilacap

Page 39: in Storage Tank Firefighting

Cilacap / Trafalgar PG

1. Changes to Risk Management procedures.

2. Change of Management for Operational Procedures.

3. Change of Management for Engineering Practices.

4. Changes to Fire Protection Practices.

5. Changes to Procurement selection processes.

6. Changes to Strategic Fire Planning.

7. Changes to SOP’s and Training Practices.

8. Mutual Aid and Response Services Agreements.

9. Closer Cooperation of Government Agencies with Industry.

Page 40: in Storage Tank Firefighting

OISD Seminar on Marketing OperationsNew Delhi

Rising to the ChallengeInternational Best Practices

in Storage Tank Firefighting

Thank you for your Participation

Michael Sorensen