Le 7 ème Forum du // 7 th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016) Improving Service Sustainability of Electric Pump Systems in Rural Timor-Leste Jonathan Choksey Mott MacDonald/BESIK Martinus Nahak 2 , Rogelio Ocampo 3 , Keith Simpson 1 , Jonathan Choksey 1 1 Mott MacDonald,, 2 DNSA (National Directorate Water Supply) Government of Timor Leste, , 3 BESIK (Water, Sanitation and Health in the Community),

Transcript of Improving Service Sustainability of Electric Pump … · Le 7ème Forum du // 7th Forum of the...

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

Improving Service

Sustainability of Electric Pump

Systems in Rural Timor-Leste

Jonathan Choksey

Mott MacDonald/BESIK

Martinus Nahak2, Rogelio Ocampo3, Keith Simpson1,

Jonathan Choksey1 – 1Mott MacDonald,, 2DNSA (National

Directorate Water Supply) – Government of Timor Leste, , 3BESIK (Water, Sanitation and Health in the Community),

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

1. Contexte/Context

• Indonesian Annexation: 1975 – 1999

• Infrastructure destroyed in 1999

• Free democratic state: 2006 – 2016

• Donor and Govt. capital investment in water systems: 2006 – 2016

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

2. Electric pump systems - definition

• Electric

(mechanised)

• Grid or solar

connection

• Community,

clinics & schools

Government / Partners Community

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

2. Electric pump systems - Problem

• Rural water supply systems are relatively easy to construct, but more difficult to manage effectively.

• Systems which include electrical pumping are particularly vulnerable to failure and long periods of down-time.

• Pumped systems are increasing in number as most springs and surface water sources have now been developed.

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

3.Objectifs / Objectives

• National pump system asset registration

• Assessment of BESIK capital maintenance

• Analysis of Cova Lima/Ainaro (O&M) trial

“Service Provider” contract

• Functionality/Cost – future modelling

• Training a team/s of pump system technicians

for DNSA

• Technical design standards and O&M tools

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

4. Asset Registration - Method

• Location

• GPS Data

• Beneficiaries

• Pump details

• Pipes/Tanks

• Photos

• SIBS data link

• Functionality

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

4. Asset Registration - Results

• Beneficiaries: 147,000

• 73% systems functional

(Beneficiaries: 94,000)

• 27 % systems not

function (Beneficiaries:

51,000)

• 78% Electrical

connection, 20% Solar,

2% Ram pumps

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

5. Capital Maintenance Programme

Method (2012 – 2015)

• BESIK (AusAid) funded

• Two rural pump system

technician

• Reactive maintenance

• 54% site visit success

rates

• Team based in capital

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

5. Capital Maintenance Programme

Results (2012 – 2015)

• 134 site visits to 73 locations

• 427 maintenance actions

performed on 73 systems

• 41% control panel (electrical

faults)

• 28% pump faults

• 9% poor discharge construction

• 22% site surveys

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

• ~ 38,000 beneficiaries

• Programme cost: $103,100

• Av. Annual cost/system: $590

• Av. Annual cost/HH: $14

• Av. HH contribution/annum: $6

5. Capital Maintenance Programme

Costs (2012 – 2015)

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

5. Capital Maintenance Programme

Costs (2012 – 2015)

• ~ 38,000 beneficiaries

• Programme cost: $103,100

• Av. Annual cost/system: $590

• Av. Annual cost/HH: $14

• Av. HH contribution/annum: $6

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

6. Private Service Provider Contract –

Method & Results

Delivery

(Dili)

Per Diem

• 12 sites (2 years)

• Private contractor

($37,700 contract value)

• Av. $2300/pump system

• Av. $21/HH/annum

• 92% functionality

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

7.Functionality and Beneficiary Model Past and Projected

0%

20%

40%

60%

80%

100%

120%

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-12 Jan-13 Nov-13 Sep-14 Jul-15 May-16 Mar-17 Dec-17 Oct-18

BESIK O&M (2012-15) + Proposed DNSA O&M (2016-17)

O&M People noAccess

O&M - People withAccess

O&M %Functionality

Historical Projected

Beneficia

ries (

Custo

mers

!)

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

0%

20%

40%

60%

80%

100%

120%

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

200000

Apr-12 Jan-13 Nov-13 Sep-14 Jul-15 May-16 Mar-17 Dec-17 Oct-18

BESIK O&M (2012-15) + Proposed DNSA O&M (2016-17) No O&M

O&M People noAccess

O&M - People withAccess

No O&M - Peoplewith Water

O&M %Functionality

No O&M %Functionality

7.Functionality and Beneficiary Model Past and Projected

Beneficia

ries (

Custo

mers

!)

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

Years 5 10 15 20 25 30 O&M $ 525,000 $ 980,000 $ 1,610,000 $ 2,065,000 $ 2,520,000 $ 3,150,000 Rehab. $ 444,500 $ 1,704,500 $ 3,199,000 $ 4,693,500 $ 5,978,000 $ 7,472,500 New System $ - $ - $ 9,100,000 $ 18,200,000

$-

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

$14,000,000

$16,000,000

$18,000,000

$20,000,000

5 10 15 20 25 30

Year

O&M vs. Rehabilitation

O&M Rehabiliation New system

$3,514,000

$7,917,000

$18,200,000

$-

$2,000,000

$4,000,000

$6,000,000

$8,000,000

$10,000,000

$12,000,000

$14,000,000

$16,000,000

$18,000,000

$20,000,000

2010 2015 2020 2025 2030 2035 2040 2045 2050 2055

CO

ST

YEAR

MaintenanceTotal

RehabilitationTotal

New SystemTotal

7. Financial projection model O&M - Rehabilitation – New

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

8. Training Programme

• 15 new pump technicians

• Training duration: 6 months

• Overall costs: $87,000

• Technical inputs from Lorentz and Grundfos staff

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

• Revision of Rural Water Supply Guidelines

– Electric pump system designs an specifications

• Energy consumption analysis (TOTEX)

– 95 sites analysed for energy consumption with energy cost (production) ~ $450,000 pa

• Strategic costing tool- projected cost tool urban/rural

– Investment in CapManEx vs. CapEx

– Tariff, population, coverage modelling

9. Guidelines and Analysis Tools

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

10. Leçons apprises / Lessons

Learned

• Understanding how many systems, functionality

and failure modes important

• Accepting the need for more human resources

and budgeting realistically

• Advocating for the long term benefits of

investment in O&M

• Evidence based decisions key

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

11. Conclusion

• Down times up to 2 years and more

• Two capital maintenance models trialled with

increase in functionality from 63% to maximum

78%.

• Private partnerships need nurturing & monitoring

• Donor funding volatility and political change

disruptive service delivery

• Government ownership of complex rural

systems strongly advocated

Le 7ème Forum du // 7th Forum of the Rural Water Supply Network : Abidjan, Côte d’Ivoire (29.11.2016 – 02.12.2016)

Remerciements / With thanks to

Lorentz

Grundfos

Mott MacDonald Ltd.

Pump Centre - UK

BESIK (Keith Simpson, Rogelio Ocampo)

DNSA (Martinus Nahak, Joao Jeronimo)