    Improving quality of plan submissions

    Scope

    - Introduction

    - Information to be shown on plans

    - Extent of responsibilities of QP in A&A works

    - Changes to audit disciplinary procedure

    - Conclusion

  • 7/27/2019 Improving Quality of Plan Submission

    3/29

    Introduction

    - Some Qualified Persons did not show adequate details ontheir fire safety plans submitted to SCDF for approval

    - As a result, Audit Processing Officer needs clarification withQP, resulting in delay to obtain TFP/FSC

    -Checklists for the necessary and useful details to beshown on the fire safety plans for submission to SCDF(Checklists For Submissions Of New AndAddition/Alteration Fire Safety Works (FSSD Circular Dated 5May 09))

    - Highlight some of the details

    - New Erection & Addition/Alteration works

  • 7/27/2019 Improving Quality of Plan Submission

    4/29

    - Space of 150 mm x 100mm on top left

    hand corner shall be kept blank for FSSD endorsement

    - To provide

    - Location plan

    A/A & newerection

    - Whole floor layout plans

    - Detail unit layout plans

    - Sectional /elevation view- Site plan new erection

  • 7/27/2019 Improving Quality of Plan Submission

    5/29

    FSSDEndorsement

    QPEndorsement

    Miscellaneous

    Project Title

    Means of access to site

    Distances between buildings

    Location of existing and proposed internal fire hydrant

    100mm

    150mm

  • 7/27/2019 Improving Quality of Plan Submission

    6/29

  • 7/27/2019 Improving Quality of Plan Submission

    7/29

    To state the fire resistance ratings of all compartment walls,fire doors, shutters and other fire safety measures- shutter to indicate with insulation rating, if required

  • 7/27/2019 Improving Quality of Plan Submission

    8/29

    To indicate positions of WR/DR landing valve and HR

    HRHR

    HR Hosereel

  • 7/27/2019 Improving Quality of Plan Submission

    9/29

    - To endorse on plans the type of fire protection system provided for thebuilding

    - To endorse on plans that Emergency Voice Comms system, smoke controlsystem are provided for the building, if required

    This floor is protected by sprinkler system

  • 7/27/2019 Improving Quality of Plan Submission

    10/29

    MV

    To indicate the type of ventilation system provided for smoke stoplobby/fire fighting lobby and exit staircases

  • 7/27/2019 Improving Quality of Plan Submission

    11/29

    Min

    10m

    Min

    10m

    x

  • 7/27/2019 Improving Quality of Plan Submission

    12/29

    93 sqm

  • 7/27/2019 Improving Quality of Plan Submission

    13/29

    The raised floor is protected by automatic

    alarm system

    Raised floor

    - To indicate the material and the type of fire protectionsystem in concealed space

    200mm

  • 7/27/2019 Improving Quality of Plan Submission

    14/29

    - Fire engine accessway

    - To provide calculation to show the perimeter required forfire engine accessway; and to indicate roads that have beendesignated as fire engine accessway

    Area = 15000 sqm

    Required perimeter= 1/2 x perimeter of building

    = x 50 m = 25m

  • 7/27/2019 Improving Quality of Plan Submission

    15/29

    Hydrant

    - Location of existing and proposed internalfire hydrants

    - To indicate location of public hydrant if it is

    used to cover the proposed fire engineaccessway/access road

    - Public hydrant on opposite site of road (morethan one lane) cannot be used

    C t b d

  • 7/27/2019 Improving Quality of Plan Submission

    16/29

    Fire EngineAccessway

    Fire Engine

    Access Road

    H

    Cannot be used

    to serve the

    development

    H

  • 7/27/2019 Improving Quality of Plan Submission

    17/29

    Unprotected opening

    - To submit form FSSD BP4

    - To attach sketches to show the detail calculationof unprotected openings

    A f l i t l 6 12 72

  • 7/27/2019 Improving Quality of Plan Submission

    18/29

    Area of enclosing rectangle = 6m x 12m = 72 sqm

    Unprotected areas = 2m x 2m x 8 = 32 sqm

    Unprotected percentage: 32 sqm/72 sqm = 36 %

    Setback distance based on Table 2 = 4.6m (interpolation)

  • 7/27/2019 Improving Quality of Plan Submission

    19/29

    Occupant load (OL) & Exit capacity (EC) calculations

    - To submit OL and EC calculations for all newprojects

    - To submit for change of use for unit

    - To highlight in the project title that there is

    change of use- To recalculate the occupant load of the

    floor involved in change of use- To ensure new occupant load does not

    exceed exit capacity

  • 7/27/2019 Improving Quality of Plan Submission

    20/29

    EXTENT OF RESPONSIBILITY OF QUALIFIED PERSONSIN A&A WORKS (FSSD Circular dated 5 Feb 10)

    - Some Qualified Persons are not certain about theextent of their responsibilities in carrying outaddition/alteration works in existing buildings.

    - FSSD produced tables detailing the extent of QPsresponsibilities when carrying out various typesof addition/alteration works in existing buildings.

  • 7/27/2019 Improving Quality of Plan Submission

    21/29

  • 7/27/2019 Improving Quality of Plan Submission

    22/29

  • 7/27/2019 Improving Quality of Plan Submission

    23/29

  • 7/27/2019 Improving Quality of Plan Submission

    24/29

    START

  • 7/27/2019 Improving Quality of Plan Submission

    25/29

    APO present the case to Audit

    Check Committee (ACC)

    NoACC

    Explanation

    accepted by

    ACC?

    Yes

    Yes

    APO inform QP of non-

    compliant items

    START

    NoACC

    Any major non

    compliant item?

    Current procedure

    - Plans randomlyselected for audit

    check

    Yes

  • 7/27/2019 Improving Quality of Plan Submission

    26/29

    No APO

    Amendment

    plans

    required?

    Yes

    Yes

    QP submits

    amendment

    plansEnd

    APO present to Audit

    Disciplinary Committee

    (ADC)

    APO follow up

    with the decision

    ADC decides on

    the action on the

    QP

    - Audit Disciplinary Committee (ADC)

    decides on action against errant QP

    - Revised plan audit procedure

  • 7/27/2019 Improving Quality of Plan Submission

    27/29

    *-Increase % of audit to100%

    - inform QP that all hissubsequent submissionswill be checked prior to

    approval. Project will bedisapproved if major non-compliant items are found.(QP has to pay 25% oforiginal plan fee for re-submission)

    - inform PEB/BOA

    - Court action

    - MAA is excluded from

    the computation of 100%audit check

    3rd ADC

    Increase % of audit to 50%

    QP submits plans

    Any ADC case?Reduce %

    of audit

    No

    No

    Yes

    Actions against QP *

    QP submits plans

    Any ADC case?Reduce %

    of audit

    Yes

    Start

    Counting ofADC cases is onrolling 5 yearsbasis

    Audit selectionbase on QPsubmission

  • 7/27/2019 Improving Quality of Plan Submission

    28/29

    Conclusion

    - Quality plans

    - to show all relevant information

    - to comply with technical requirement

    - Reduce delay to obtain TFP/FSC

  • 7/27/2019 Improving Quality of Plan Submission

    29/29