![Page 1: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/1.jpg)
IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EASTSALT LAKE CITY, UT
Presented to University of Utah Department of Campus Design and Construction by:
Student Engineering Associates
January 28, 2014
![Page 2: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/2.jpg)
Courtesy of SEA
![Page 3: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/3.jpg)
PROJECT MANAGEMENT TEAMKatharine Smith
![Page 4: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/4.jpg)
Team Qualifications
• Leadership Experience in Student Organizations• Experienced in Microsoft Project and Office Suite
Aaron Womble Jem Locquiao Katharine Smith Daniel Sudbury
![Page 5: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/5.jpg)
Scope
Ensure SEA provides a cost effective solution to improve the flow of pedestrian, vehicular, and TRAX traffic in the area of South Campus Drive near 1800 East, across from the Huntsman Center
![Page 6: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/6.jpg)
Approach
• Project Scheduling
• Project Cost Estimate
• Technical Oversight
Courtesy of SEA
![Page 7: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/7.jpg)
Project Scheduling
• Gantt Chart• Track progress for all deliverables across each team
• Reviewed weekly
Courtesy of SEA
![Page 8: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/8.jpg)
Project Cost Estimate
• Individual cost estimates reported to PMT
• Assemble overall project cost estimate
• Budget oversight• Reviewed weekly
Courtesy of SEA
![Page 9: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/9.jpg)
Technical Oversight
• Application of analytic measures
• Review drawings and calculations
• Aid in development of design alternatives
Courtesy of SEA
![Page 10: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/10.jpg)
SITE PLAN AND DRAINAGE TEAM Riley Ford
![Page 11: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/11.jpg)
Team Qualifications
• Experienced in Detention Design• Experienced with AutoCAD• Engineering Background
Jacob Nelsen William Holley Riley Ford
![Page 12: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/12.jpg)
Scope
Design site grading to detain and properly release storm water runoff
[1]
![Page 13: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/13.jpg)
Approach
• Existing Site Plan
• Design Phase
• Final Drawings
[2]
![Page 14: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/14.jpg)
Existing Site Plan
• Investigate existing site drainage
• Prepare drawings showing locations of all existing structures and utilities
Courtesy of SEA
![Page 15: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/15.jpg)
Design Phase
• Develop alternatives
• Determine alternatives’ effects on site runoff/drainage
• Provide feedback
[3]
![Page 16: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/16.jpg)
Final Drawings
• Lay out final design location
• Determine new drainage conditions
• Prepare final professional drawings for client
[4]
![Page 17: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/17.jpg)
UTILITIES AND PERMIT TEAMGuy Evans
![Page 18: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/18.jpg)
Team Qualifications
• 4 Years of Experience as Quality Control Field Inspector, TEA Group
• Over 7 Years of Surveying Utilities Experience• Past Experience of Working With UDOT and Cities
Concerning Utilities
Guy Evans T.J. Owens Jeffery Beverly
![Page 19: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/19.jpg)
Scope
Responsible for utilities and all necessary permits
[5]
![Page 20: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/20.jpg)
Approach
• Identify Utilities• Aid Design Process• Determine Necessary Permits
[6]
![Page 21: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/21.jpg)
Identify Utilities
• Review utility maps obtained from Facilities Management.
• Evaluate current conditions of utilities and consider upgrades
• Reach out to agencies: UDOT, Salt Lake City and UTA, and Blue Stakes
[7]
![Page 22: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/22.jpg)
Design Process
• Advise design teams on limitations based on utility layout
• Work Close with the Aid in the optimization of the designs
• Design new utility lines
Courtesy of SEA
![Page 23: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/23.jpg)
Determine Necessary Permits
• Establish any necessary permits needed
• Identify who is responsible for acquiring them
[8]
![Page 24: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/24.jpg)
TRAX TEAMMingde Lin
![Page 25: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/25.jpg)
Team Qualifications
• Conducted Traffic Research for Transportation Project • Proficient with Computer Aid Software for the task:
SAP2000, ArcGIS, AutoCAD• Ten Years Experience in Construction Management
Mason Clark Anthony Quach Adam Andre Mingde Lin
![Page 26: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/26.jpg)
Scope
Research and provide information on regulations,related future plans and implementations of UTA for SEA
Courtesy of SEA
![Page 27: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/27.jpg)
Approach
• Research UTA Regulations
• Provide Reliable Resources
• Analyze Alternative TRAX Lines
Courtesy of SEA
![Page 28: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/28.jpg)
Research UTA Regulations
• Pedestrian safety
• Work zone regulation
• TRAX construction regulation
[8]
![Page 29: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/29.jpg)
Provide Reliable Resources
• Pedestrian and Traffic Team
• TRAX Structures Team• Huntsman Structures Team
• Geotechnical Team
Courtesy of SEA
![Page 30: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/30.jpg)
Analyze Alternative TRAX Lines
• Modification, reallocation of TRAX station
• Realignment of TRAX line
• Impact on traffic
• Estimate cost analysis[9]
![Page 31: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/31.jpg)
PEDESTRIAN AND TRAFFIC TEAMMichael Butler
![Page 32: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/32.jpg)
Team Qualifications
• Six Years of Internship Experience for Parsons Engineering, Project Engineering Consultants and Engineering Ambassador
• Worked within AASHTO constraints, Performed Traffic Safety Analysis
Michael Butler Crystal Orantes Derek Hatfield
![Page 33: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/33.jpg)
Scope
Safely maintain vehicle and pedestrian flow
Courtesy of SEA
![Page 34: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/34.jpg)
Approach
• Safety Evaluations
• Relieve Vehicle Congestion
• Maintain Pedestrian Flow
[10]
![Page 35: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/35.jpg)
Safety Analysis
• AASHTO Highway Safety Manual
• Pedestrian – Vehicle collisions per year
• Roadway geometry and characteristics, traffic volumes [11]
![Page 36: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/36.jpg)
Minimize Vehicle Congestion
• Rerouting of traffic
• UDOT standards
[12]
![Page 37: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/37.jpg)
Pedestrian Access and Mobility
• Pedestrian routes are easily accessible
• ADA compliance
[13]
![Page 38: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/38.jpg)
GEOTECHNICAL TEAMCameron Brink
![Page 39: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/39.jpg)
Team Qualifications
Cameron Brink Alexsys Smith Dane Hirst
• Leadership and Drafting Experience• Structural Design Experience• Foundation Analysis through courses provided
![Page 40: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/40.jpg)
Scope
To perform necessary drafting and seismic related analysis of either a structure or tunnel alternative
Courtesy of SEA
![Page 41: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/41.jpg)
Approach
• Site Soil Analysis• Code• Teams• Foundation Analysis• Tunnel Design
Courtesy of SEA
![Page 42: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/42.jpg)
Site Soil Analysis
•Obtaining underground infrastructure maps and a campus master plan
•Geotechnical reports from previous projects
•Possible analysis
–Liquefaction
–Seismic stability
–Slope stability
–Soil classification[14]
![Page 43: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/43.jpg)
Codes
[18]
[15]
[16]
[17]
![Page 44: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/44.jpg)
Teams
•Structural Teams
–Foundation design
•Utilities
–What utilities affect the site
•Site Plan and Drainage
–Drainage locations
[19]
[20]
![Page 45: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/45.jpg)
Foundation Analysis
•Deep or shallow
•Backfill
•Seismic/slope stability
•Time and cost analysis
[21]
![Page 46: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/46.jpg)
Tunnel Design
•Feasibility
•Structural capacity
–Seismic
[22]
![Page 47: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/47.jpg)
HUNTSMAN STRUCTURES TEAMD. Lukas Politis
![Page 48: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/48.jpg)
Team Qualifications
Blake Golding D. Lukas Politis Chris May
• Seven Years Structural Analysis• Four Years Alternative Design• Drafting and Design Software
![Page 49: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/49.jpg)
[23]
![Page 50: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/50.jpg)
Scope
To design a structure for pedestrian and bicycle traffic, which connects the Jon M. Huntsman Center
Courtesy of SEA
![Page 51: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/51.jpg)
[23]
![Page 52: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/52.jpg)
Approach
• Determine Alternatives• Structural Analysis• Performance Analysis
[24]
![Page 53: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/53.jpg)
Determine Alternatives
• Improved access to the U
• The front door approach
[25]
![Page 54: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/54.jpg)
Bridge Picture
[26]
![Page 55: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/55.jpg)
Tunnel Picture
Courtesy of SEA
![Page 56: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/56.jpg)
Structural Analysis
• SAP2000• AutoCAD• Columns• Beams• Walls• Slabs
![Page 57: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/57.jpg)
Performance Analysis• Bike and pedestrian traffic• Aesthetics• Life cycle• Short term• Long term
![Page 58: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/58.jpg)
[23]
![Page 59: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/59.jpg)
TRAX STRUCTURES TEAM Jack Miller
![Page 60: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/60.jpg)
Team Qualifications
• Construction Expertise• Previous Design of Structures• Design Experience at the University of Utah• Developed Spreadsheets and SAP2000
Jack Miller Chad Hall Kelly Johnston
![Page 61: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/61.jpg)
Scope
Design a structure that connects the TRAX station to the U of U campus
[27]
![Page 62: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/62.jpg)
Approach
• Determine Dimensions and Constraints
• Develop Alternatives• Structural Analysis
[28]
![Page 63: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/63.jpg)
Determine Dimensions and Constraints
• Traffic• TRAX• Utilities• Geotechnical• Site Plan and Drainage
[29][28]
![Page 64: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/64.jpg)
![Page 65: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/65.jpg)
Determine Alternatives
Based on data feasible alternatives will be proposed
[28]
![Page 66: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/66.jpg)
Structural Analysis
Perform structural and cost analysis on proposed alternatives
[30]
[31]
![Page 67: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/67.jpg)
Decision Matrix
• Allows team to make a non biased decision• Stratifies alternatives to identify best option• Helps identify potential flaws or hurdles
![Page 68: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/68.jpg)
Preliminary Proposed MatrixPrimary Objectives Balancing Objectives
Design Cost AestheticsFunctionality Primary Sum SustainabilityConstructibility Constructio
n Time Phasing Safety Balancing Sum
Weight 2 1.5 1.5 0.75 0.75 1 1 1.25
I 10 5 9 41 8 7 9 8 10 81.75
II 5 10 7 35.5 7 8 7 6 7 68.5
III 6 7 6 31.5 9 6 5 6 7 62.5
IV 7 8 10 41 9 8 5 9 8 77.75
![Page 69: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/69.jpg)
Courtesy of SEA
![Page 70: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/70.jpg)
Image References[1] www.businessweek.com
[2] www.southportland.org
[3] sudsnet.abertay.ac.uk/
[4] www.cadpilot.com
[5] http://www.hartzophotography.com/architectural/
[6] http://www.basinandrangewatch.org/OcotilloWind.html
[7] http://www.civilconstructors.com/services.php
[8] www.rideuta.com
[9] http://utah.subwaynut.com/trax/university_s_campus/index.php
[10] http://www.ksl.com/index.php?sid=20240322&nid=460&page=1#8
[11] bookstore.transportation.org/collection_detail.aspx?ID=33
[12] footage.shutterstock.com
[13] http://trinitylafayette.org/wp-content/uploads/2012/06/trinity-handicap.png
[14] http://phamilynews.net/say-it-with-me-liquefaction/
[15] search.ebay.com/Saponification
[16] rtands.com
![Page 71: IMPROVEMENTS TO THE INTERSECTION AT EAST SOUTH CAMPUS AND 1800 EAST SALT LAKE CITY, UT Presented to University of Utah Department of Campus Design and.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649ee45503460f94bf2fac/html5/thumbnails/71.jpg)
Image References[17] www.betterroads.com
[18] http://www.amazon.com/2012-International-Building-Code-Council/dp/1609830407
[19] http://www.amazon.com/Wood-Architecture-Now-Philip-Jodidio/dp/3836523299
[20] http://versatileexcavatingct.com/services/drainage-utilities/
[21] http://www.rawell.co.uk/structural_waterproofing_product_applications/lift_pits.php
[22] http://vancouverisawesome.com/2009/01/page/8/
[23] Google Earth
[24] http://images.umc.utah.edu/netpub/server.np ind&catalog=catalog&template=
detail.np&field=Itemid&op=matches&value=3033&site=photobank
[25] www.en.wikipedia.org
[26] http://images.utah.edu/uploads/view/22
[27] www.utah.edu
[28] www.subwaynut.com
[29] nationwideequipment.com
[30] www.csiamerica.com
[31] www.office.about.com