1 COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED. Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing) Improved Availability and Damage Avoidance at a Water Treatment Plant Using Asset Analysis Mitsubishi Electric e-F@ctory Strategy and Business Planning; Global Alliances Joint presentation: Mitsubishi Electric, Schaeffler Group July 2016, ARC Forum Bangalore, India

Transcript of Improved Availability and Damage Avoidance at a Water ... · Integrated management energy...

Page 1: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

1COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Improved Availability and Damage Avoidance at

a Water Treatment Plant Using Asset Analysis

Mitsubishi Electric e-F@ctory Strategy and Business Planning; Global Alliances

Joint presentation: Mitsubishi Electric,

Schaeffler GroupJuly 2016,

ARC Forum Bangalore, India

Page 2: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

2COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Introduction

Mitsubishi Electric:

•Integrated electrical/electronics

supplier

•Established 1921

•4,394.3 billion Yen

consolidated net sales (for the year ending March 31st 2016)

Page 3: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

3COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

When it all goes wrong

Time

Ma

ch

ine

co

nd

itio

n

Minutes

Days

Weeks

Month

Smoke

Heat

Noises

Vibration

Change in

condition

Everything

was working

well

Early detection = time to plan and act

Lead time or pre-warning period

Page 4: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

4COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Background

Condition

Monitoring

Systems

CMS

Page 5: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

5COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

What is the CMS measuring?

Condition

Monitoring

System

Condition

monitoring dataVibration Analysis

Energy Management

Thermography,

Oil Analysis

Environmental

dataOutside temperature, Humidity,

Atmospheric pressure, Date,

Time

Machine

process dataTemperature, Pressure,

Voltage, Current, Condition

Manufacturing

dataOrder number, Quantities,

Utilization, Material

Page 6: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

6COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Sharing and analyzing

Database

Agent

Provides interfaces to different data sources

Database

Machine

process data

Manufacturing

data

Environmental

data

CMS Platform incl. visualization

"Change data into information"

Condition

monitoring

data

Page 7: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

7COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Scalable and widely applicable

Reference Case 1 Case 2 Case 3

Customer type Public SME Multi-national

Industry Utility (water) Pulp and paper Manufacturing

Application

zoneWaste water pump Paper coating

machine

Bearing production

Device Machine Line

Process Hybrid Discrete

Local + Cloud Local + Plant cloud Local + Private cloud

Page 8: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Applied Condition Monitoring

8 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 9: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Schaeffler Group at a glance

• Integrated automotive and industrial supplier

• Around 84.000 employees in 50 countries

• Established 1883

• Above industry average profitability and revenue growth

• Strategic participation in Continental AG

• € 12,1 billion annual turnover

9 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 10: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Waste Water Treatment Plant

Company: Stadtwerke Rotenburg an der Fulda(Public utility company)

Application: unmanned remote waste water pumping station

Processing capacityMaximum: equivalent 34,000 peopleAverage: equivalent 20,000 people

Requirement: 1) no loss of service, 2) cope with unplanned demand3) reduce energy usage

Condition: Typical gearbox/motor breakdown within 1 – 3 years

Configuration/system

Number of pumps: 3 Archimedes screw type

Configuration: Directly mount motor on gearbox driving auger screw

Operating cycle: 24hrs/day, 7 days/week

Reference

10 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 11: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Waste Water Treatment Plant

Reference

Internet

System

All

third

pa

rty tra

de

ma

rks a

nd

/or

reg

iste

red

tra

de

ma

rks a

re t

he

pro

pe

rty o

f th

eir r

esp

ective

ow

ne

rs a

nd

are

ackn

ow

led

ge

d

11 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 12: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Waste Water Treatment Plant

Cost analysis

Overhaul the gearbox:1000 Euro

New gearbox: 5500 Euro

Solution cost

Hardware: 4700 Euro

Installation: 1000 Euro

Total 5700 Euro

Return on Investment:

Estimated: 2 gearbox failures

No CMS: Failure x2 = 5500 x2 = 11000 Euro

CMS: Solution cost + 2x gearbox overhaul

= 5700 + (2x1000) = 7700 Euro

Benefit: 3300 Euro saving on 2 failures +no loss of service

Benefit in practice:

4 months after installation a gearwheel defect was detected

Solution delivery:

Local system integrator: Willich Elektrotechnik GmbHSensor technology: SchaefflerHardware: Mitsubishi ElectricIT connectivity: eWON

Result:

Improved OEE: predictive maintenance ensures continuous services and preemptive maintenance actions reduce cost of failure

Reference

12 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 13: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Paper Mill

Company: Mitsubishi HiTec Paper Europe GmbH

Application: cooling system for paper mill producing coatedthermo-sensitive paper

Processing Speed: 1730m/min

(103.8 km/hr)Paper roll: 9000kg per roll (2.9m wide)

(150,000,000 kg/yr)Machine height: 4 stories (floors)

Requirement: 1) no loss of service, 2) aid planned maintenance3) no machine damage

Configuration/system

Number of cooling fans: 26 Weight of 1 fan impeller: 100kgImpeller speed: 1500rpmTarget temperature: below 68 deg C

(starting temp. 250 deg C)

Reference

13 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 14: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Paper Mill

Reference

System

26 smartcheck

vibration

sensors

All

third

pa

rty tra

de

ma

rks a

nd

/or

reg

iste

red

tra

de

ma

rks a

re t

he

pro

pe

rty o

f th

eir r

esp

ective

ow

ne

rs a

nd

are

ackn

ow

led

ge

d

14 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 15: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Paper Mill

Cost analysis

Cost of 1 roll: 12000 Euro

Solution cost

Hardware: 19500 Euro

Installation: 6000 Euro

Total 25500 Euro

Return on Investment:

Estimated: 3 rolls of paper

No CMS: Failure x3 = 12000 x3 = 36000 Euro

CMS: Solution cost = 25500 Euro

Benefit: 10500 Euro saving on 3 failures +no loss of service, no machine damage

Solution delivery:

Local system integrator: Carl Werthenbach

Konstruktionsteile GmbH & Co. KG

Sensor technology: SchaefflerHardware: Mitsubishi Electric

Result:

Achieved continuous running process, no machine damage, now utilizing planned maintenance/service

Solution rolled out to second plant.

Reference

15 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 16: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Manufacturing line

Company: Schaeffler GmbH

Application: bearing production (stamping, pressing, turning, welding, coating of bearings and bearing components)

Processing Products per year: 840millionMaterial input: 65,000 tons of steelWork space: 77,000m²Operations: 3500 employees

working 24/7

Requirement: 1) no loss of service, 2) aid planned maintenance3) no machine damage

Configuration/system

Reference

16 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 17: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Manufacturing line

Reference

Internet

SCADAz.B.Iconics o. WinCC

Ethernet

Ethernet

ERP

Level

MES

Level

Controller

Level

Field

Level SL

MP

SL

MP

Modbus TCP

Analog/

Digital

In/Out

TC

P/I

P

PLC (e.g. SIEMENS, Schneider, Rockwell, Beckhoff, …)

ERP = Enterprise Resource Planning

MES = Manufacturing Execution System

SCADA = Supervisory Control and Data Acquisition

Gateway = Connection to other industrial protocol with

converting modules possible

Analog/

Digital

In/Out

Cloud/

Internet**** Profibus

Profinet

CANopen

CC-Link

DeviceNet

EtherCAT

DB

Agent

TC

P/I

P

FAG

SmartVisual

Gateway

All trade

All

third

pa

rty tra

de

ma

rks a

nd

/or

reg

iste

red

tra

de

ma

rks a

re t

he

pro

pe

rty o

f th

eir r

esp

ective

ow

ne

rs a

nd

are

ackn

ow

led

ge

d

17 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 18: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Manufacturing line

Result: Accumulated knowledge

Deeper appreciation and understanding

Preparation for the future

Return on Investment:

Priceless!We will be implementing at our other factories

Reference

18 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 19: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

And the future?

19 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 20: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

SmartGuard

Plattform

System

(Schaeffler/

Customer)

SmartCheck

communicate

directly with Cloud

Smart Products and Services HMI 2016 (available for pilots)

SmartGuard

Link

Customer Schaeffler Service

Infrastructure

Internet and

LAN/WLAN

Access to own

data, no local

Software installation

Access to

all data

Administration

Plattform

Expert tools for

CM Service

Views and Reports,

Layouts, Usability

RULRemaining

Useable Lifetime

20 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 21: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

Overview

Condition Monitoring System for Railway Applications

Overview of the condition monitoring system

implemented on bogies, with signal

detection, data processing and diagnosis

which delivers bearing health status.

21 Predictive Condition Monitoring by Schaeffler: ARC Forum Japan/India 2016

Page 22: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

22COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Collaboration and “know-how”

IIoT, Industrie 4.0 are complex

manufacturing environments – to

maximize the opportunity

collaboration is required

Page 23: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

23COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

Together we make solutions!

PC-Less

connection

directly to

MES/ERP

Process

managementIntegrated

energy

management

From receipt of order,

manufacturing and

delivery

Live production

reporting

Increased

quality; produce

right first time

Small or large

batch flexibility

Pre-emptive

maintenance

Renewable

energy

managementTraceability and

tracking control

Empowering customer

to make the

right decisions!

Page 24: Improved Availability and Damage Avoidance at a Water ... · Integrated management energy management From receipt of order, manufacturing and delivery Live production reporting Increased

24COPYRIGHT © 2016 MITSUBISHI ELECTRIC. ALL RIGHTS RESERVED. ALL TRADEMARKS ACKNOWLEDGED.Open ARC Forums 2016 (e-F@ctory Alliance partner Schaeffler) (Promo G. FA Overseas Marketing)

THANK YOU!