IMPRINT Reports Current and Future Development

16
AFQT Reading Grade Level Maintainer Operator Workload Personnel Characteristics Charneta Samms Charneta Samms Operations Analysis Team Integration Methods Branch US Army Research Laboratory [email protected] (410) 278-5877 IMPRINT IMPRINT Reports Reports Current and Future Current and Future Development Development

description

Maintainer. Operator. AFQT. Workload. Reading Grade Level. Personnel Characteristics. IMPRINT Reports Current and Future Development. Charneta Samms Operations Analysis Team Integration Methods Branch US Army Research Laboratory [email protected] (410) 278-5877. IMPRINT. - PowerPoint PPT Presentation

Transcript of IMPRINT Reports Current and Future Development

Page 1: IMPRINT Reports Current and Future Development

AFQT

Reading Grade Level

Maintainer

Operator

Workload

PersonnelCharacteristics

Charneta SammsCharneta Samms

Operations Analysis TeamIntegration Methods Branch

US Army Research [email protected] (410) 278-5877

IMPRINT ReportsIMPRINT Reports Current and Future DevelopmentCurrent and Future Development

Page 2: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

• Powerful tool for estimating system performance as a function of human performance

• Rendered useless if analyst can not interpret the data

FOCUS: Accentuate the strengths of IMPRINT by redesigning and developing analysis friendly reports

IMPRINTIMPRINT

Page 3: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 6Version 6

VACP (Goal) VACP (Goal) Report ScreenReport Screen

Advanced Report Advanced Report ScreenScreen

Page 4: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 6 ReportsVersion 6 Reports

Page 5: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 6 ReportsVersion 6 Reports

• Good measures of overall system performance

• Limited look into operator workload

KEY ISSUES

- Plotting Workload Over Time - No report to show operator activity during

points of high workload(especially in VACP/Goal)

Page 6: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 6 Workload ChartVersion 6 Workload Chart

5 10 15

10

20

30

5 10 15

10

20

30

Page 7: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Res Plot

0.002.004.006.008.00

10.0012.0014.0016.0018.0020.00

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Time (secs)

To

tal

Wo

rklo

ad

Data plotted from res file

Overload Plot

0.002.004.006.008.00

10.0012.0014.0016.0018.0020.00

0.00 2.00 4.00 6.00 8.00 10.00 12.00

Time (secs)T

ota

l W

ork

load

Data plotted from overload report

Advanced ReportsAdvanced Reports

Fake it - Operator Overload Report with workload threshold set to zero

Only reports workload when a task begins, not when one ends.

Page 8: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

New Report SpecificationsNew Report Specifications

• Report Specs are written– User chooses time standard– Each report available in all operator modes

• Operator Activity Report• Operator Workload Report• Operator Workload Chart • Snapshots Report• Task Change Report• Task Data Report

Page 9: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Operator Activity ReportOperator Activity Report

VACP/Goal• Function Name• Task Name• Beginning Time• Ending Time• Operator

Advanced• Function Name• Task Name• Beginning Time• Ending Time• Operator

ALREADY AVAILABLE

Page 10: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Operator Workload ReportOperator Workload Report

VACP/Goal• Time• Overall Workload• Visual• Auditory• Cognitive• Psychomotor• Function Name• Task Name

Advanced• Time• Overall Workload• Total Single Task

Demands• Intra Channel Conflicts• Inter Channel Conflicts• Visual• Auditory• Cognitive• Speech• Motor• Function Name• Task Name

Page 11: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Task Change ReportTask Change Report

VACP/Goal• Function Name

• Task Name

• Time of change

• Reason for change

– Consequence of Failure

• Action Taken

– Time Degraded

– Accuracy Degraded

– New Task Starts

– Mission Fails

– Task Repeats

Advanced• Function Name• Task Name• Time of change• Reason for change

– Workload Threshold Exceeded

– Consequence of Failure• Action Taken:

– Task Dropped– Operator Changed– Time Degraded– Accuracy Degraded– New Task Starts– Mission Fails– Task Repeats

• a particular workload strategy drops a task • a particular workload strategy changes the operator of a task• a consequence of failure executes

Page 12: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Task Data and SnapshotsTask Data and Snapshots

• Task Data Report– Similar to Review Task Data but includes

• Release conditions• Beginning and Ending effects• Decision node data

– Easy way to capture model inputs for documentation

• Snapshots– Formatted results vs. raw data files

Page 13: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 7 UpdatesVersion 7 Updates

• Operator Workload Report– Available in VACP/Goal

• Workload Chart– Available in VACP, Goal and Advanced

• Snapshots– Available in Goal and Advanced

• Task Status Report (new)– Available in VACP/Goal

Page 14: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 7 ReportsVersion 7 Reports

Goal (VACP) Goal (VACP) Report ScreenReport Screen

Advanced Report Advanced Report ScreenScreen

Reports open directly in Excel

Page 15: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Version 7 ReportsVersion 7 Reports

Reports open directly in Excel

Personnel Attributes Personnel Attributes Report ScreenReport Screen

Maintenance Maintenance Report ScreenReport Screen

Default Graphs Addedto both

Page 16: IMPRINT Reports Current and Future Development

Human Research and Engineering Directorate

Future Report DevelopmentFuture Report Development

• IMPRINT 7– Finalizing the look and names of reports

• IMPRINT Pro reports– Currently using Version 7 Advanced reports –

not optimized– Operator Workload Report– Task Change– Task Data– New reports (incorporating research)

• System of System Reports