CHAUD HOT FROID COLD 105180_QUICK-START-1_RevA 1355, 2 nd Street, Industrial Park, Sainte-Marie (Québec) G6E 1G9 Tel: 418 387-9090 or 1 877 465-2542 | Fax: 418 387-9089 | [email protected] | kaliastyle.com QUICK-START GUIDE 1 Important to follow the installation manual(s). 2 Thermostatic valves manages the temperature only. Depending on which kit you’re installing, volume controls, 2-way diverter or 3-way diverter are necessary to manage water output. 3 The plastic cover must be used to determine the depth of the valve and the diameter of the cut-out hole. 4 Starting with the color line on the cartridge, align all the color lines found on the subsequent parts. 5 Hot water supply on left and cold water supply on right. 8 Before closing the walls, test the temperature manageability and watch for leaks. Call Kalia if you need assistance or if you have any questions: 1-877-465-2542 or email at [email protected]. Please have in hand your product codes or installation manuals. KEEP ALL INSTALLATION INSTRUCTION MANUALS FOR THE END-USER IF NEEDED FOR FUTURE REFERENCE. CHAUD HOT FROID COLD 6 Remove cartridge and check valves before welding copper conduits (allow to cool). 7 Purge lines to clear debris then reinstall or replace the cartridge. MAX MIN IMPORTANT THINGS TO REMEMBER DURING THE INSTALLATION OF YOUR SHOWER SYSTEM 1 MAX MIN Position fermée / Closed position Pour sélecteur :/ For diverter: 104240, 104268 104269, 104270 Lignes de couleurs/ Color lines 2019/06

Transcript of IMPORTANT THINGS TO REMEMBER DURING THE ...IMPORTANT THINGS TO REMEMBER DURING THE INSTALLATION 1 OF...

  • CHAUDHOT

    FROIDCOLD

    105180_QUICK-START-1_RevA

    1355, 2nd Street, Industrial Park, Sainte-Marie (Québec) G6E 1G9Tel: 418 387-9090 or 1 877 465-2542 | Fax: 418 387-9089 | [email protected] | kaliastyle.com

    QUIC

    K-ST

    ART

    GUID

    E1Important to follow the installation manual(s).

    2Thermostatic valves manages the temperature only. Depending on which kit you’re installing, volume controls, 2-way diverter or 3-way diverter are necessary to manage water output.

    3The plastic cover must be used to determine the depth of the valve and the diameter of the cut-out hole.

    4Starting with the color line on the cartridge, align all the color lines found on the subsequent parts.

    5Hot water supply on left and cold water supply on right.

    8Before closing the walls, test the temperature manageability and watch for leaks.

    Call Kalia if you need assistance or if you have any questions: 1-877-465-2542 or email at [email protected].

    Please have in hand your product codes or installation manuals.

    KEEP ALL INSTALLATION INSTRUCTION MANUALS FOR THE END-USER IF NEEDED FOR FUTURE REFERENCE.

    CHAUDHOT

    FROIDCOLD

    6Remove cartridge and check valves before welding copper conduits (allow to cool).

    7Purge lines to clear debris then reinstall or replace the cartridge.

    MAX

    MIN

    IMPORTANT THINGS TO REMEMBER DURING THE INSTALLATION OF YOUR SHOWER SYSTEM1

    MAX

    MIN

    Position fermée /Closed position

    Pour sélecteur :/For diverter:104240, 104268 104269, 104270

    Lignes de couleurs/Color lines

    2019/06